TIMBER LODGE BUILDERS, INC. | B= | C | 12/05/2014 | finished basement, deck in | DALE | DALE | | B= | C | 4865989 |
TIMBER LODGE BUILDERS, INC. | B= | T | 11/18/2014 | PAID (REC#1235756) locked at 10;25 / need tip-outs on downspouts / need final grade / no front stairs | DALE | DALE | | B= | T | 4855570 |
TIMBER LODGE BUILDERS, INC. | BSP | T | 11/12/2014 | PAID (REC#1231734) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Converted bedroom in basement to storage and converted bedroom on main to office - (3) bedrooms remain. | SHELLEY | SHELLEY | | BSP | T | 4852052 |
TIMBER LODGE BUILDERS, INC. | BIN | C | 09/11/2014 | | DALE | DALE | | BIN | C | 4814133 |
TIMBER LODGE BUILDERS, INC. | BLA | C | 09/11/2014 | | DALE | DALE | | BLA | C | 4814130 |
TIMBER LODGE BUILDERS, INC. | BFR | C | 09/11/2014 | | DALE | DALE | | BFR | C | 4814129 |
TIMBER LODGE BUILDERS, INC. | BFR | P | 09/08/2014 | foam and firestop / eng. for framing on file / ok to insulate | DALE | DALE | | BFR | P | 4811639 |
TIMBER LODGE BUILDERS, INC. | BFR | R | 09/02/2014 | narrow braced wall not per plan / block garage door brackets / 2x4 over 10ft at garage / what are size of posts and window trimmers and k studs / strap landing / strap top plates | DALE | DALE | | BFR | R | 4807951 |
TIMBER LODGE BUILDERS, INC. | BSP | P | 04/24/2014 | structural floor for front porch ok | CHRISM | CHRISM | | BSP | P | 4726732 |
TIMBER LODGE BUILDERS, INC. | BFD | C | 04/14/2014 | | JOHN | JOHN | | BFD | C | 4719806 |
TIMBER LODGE BUILDERS, INC. | BFI | C | 04/14/2014 | r 10 installed | JOHN | JOHN | | BFI | C | 4719804 |
TIMBER LODGE BUILDERS, INC. | BFI | R | 04/10/2014 | need rescheck on site | CHRISM | CHRISM | | BFI | R | 4717959 |
TIMBER LODGE BUILDERS, INC. | BFD | R | 04/10/2014 | drain usable needs to include garage to house wall, plastic not sealed to wall, filter paper doesnt cover rock in rear of house, remove wood at step downs, grout exposed rebar | CHRISM | CHRISM | | BFD | R | 4717958 |
TIMBER LODGE BUILDERS, INC. | BFN | C | 04/04/2014 | design and soils on file drain usable isolate and float | CHRISM | CHRISM | | BFN | C | 4714826 |
TIMBER LODGE BUILDERS, INC. | BFT | C | 03/24/2014 | 3000# bearing pads at wall | CHRISM | CHRISM | | BFT | C | 4707160 |
SAFE HOUSE ELECTRIC | E= | C | 11/10/2014 | | MATTHEW | MATTHEW | | E= | C | 4851721 |
SAFE HOUSE ELECTRIC | E= | T | 11/05/2014 | PAID (REC#1231353) gfci protect outlet left of fridge in kitchen | MATTHEW | MATTHEW | | E= | T | 4849224 |
SAFE HOUSE ELECTRIC | E= | R | 10/31/2014 | gfci protect outlet left of fridge, gfci test can't be behind washer | MATTHEW | MATTHEW | | E= | R | 4846607 |
SAFE HOUSE ELECTRIC | ES | C | 10/29/2014 | Residential Overhead: 200 amp 3/w: meter is set; need seal | MATTHEW | MATTHEW | | ES | C | 4844711 |
SAFE HOUSE ELECTRIC | E= | R | 10/29/2014 | install countertops in both kitchens, afci dining room and washer in basement bedroom, gfci protect all outlets within 6' of laundry sink (gfci test needs to be readily accessible)----------- a/c pre-wire | MATTHEW | MATTHEW | | E= | R | 4844706 |
STEVEN'S ELECTRIC | ER | C | 09/02/2014 | second kitchen approved | MATTHEW | MATTHEW | | ER | C | 4807470 |
STEVEN'S ELECTRIC | ES | R | 08/22/2014 | tighten lug and install set screw on bond bushing, strap riser at pole | MATTHEW | MATTHEW | | ES | R | 4802469 |
STEVEN'S ELECTRIC | ER | R | 08/22/2014 | need paperwork for second kitchen or remove wiring (2 small appliance circuits ran), finished basement, no mcc's, 63nm sub-panel ok | MATTHEW | MATTHEW | | ER | R | 4802467 |
TRADEWINDS HEATING & AIR-COND. | H= | C | 11/12/2014 | correction made | TED | TED | | H= | C | 4852218 |
TRADEWINDS HEATING & AIR-COND. | H= | R | 11/10/2014 | still need clearance around b vent on garage heater (transfer openings installed) | TED | TED | | H= | R | 4851602 |
TRADEWINDS HEATING & AIR-COND. | H= | R | 11/05/2014 | install louver door to mech. room (no transfer openings) need clearance around garage heater b vent at ceiling note: finished basement, no a/c (rough only) | TED | TED | | H= | R | 4848933 |
TRADEWINDS HEATING & AIR-COND. | H= | R | 10/10/2014 | NO GAS , NO ELECTRIC , NOT READY | GABE | GABE | | H= | R | 4832807 |
FOREST PLUMBING | HO | C | 10/08/2014 | 10lb test on 2 outside under ground p.e. lines, 1 from meter at road to house and 1 old under ground line from meter at road to old garage slab for future | TED | TED | | HO | C | 4831003 |
TRADEWINDS HEATING & AIR-COND. | HC | C | 08/28/2014 | RELEASE METER | JACK | JACK | | HC | C | 4805580 |
TRADEWINDS HEATING & AIR-COND. | HRR | C | 08/28/2014 | DUCT SIZING OK IN BASEMENT | JACK | JACK | | HRR | C | 4805579 |
TRADEWINDS HEATING & AIR-COND. | HRR | P | 08/25/2014 | Heat runs in basement do not match prints. Several runs were done in 5" where plans call for 4. Change plans with a splice or run them in 4". Dryer vent in basement was missed (Not there) Need (By final) to secure b vent and furnace vent pipes in mech rm. Rest ok. Note: Fin. Bsmnt, a/c rough, OSA. | MARK | MARK | | HRR | P | 4803244 |
FOREST PLUMBING | HI | C | 08/25/2014 | 10 lb test ok. Note: (2) gas dryers, c/t, (2) future f/p stubs, 1 future BBQ, garage heater, furn, w/h. on 1 1/4" main. Gas piping contractor states there will be a reg at the house and a med. pressure system. Will require letter and labeling of pipe prior to final. | MARK | MARK | | HI | C | 4803236 |
TRADEWINDS HEATING & AIR-COND. | HRR | R | 08/05/2014 | no design plan or equipment schedule found, waive trip fee this time | TED | TED | | HRR | R | 4790772 |
FOREST PLUMBING | P= | C | 11/04/2014 | corrections made | TIM | TIM | | P= | C | 4847588 |
FOREST PLUMBING | P= | P | 10/28/2014 | need air gap at tub spout....rest ok water cert to scan | TIM | TIM | | P= | P | 4843370 |
FOREST PLUMBING | PTO | C | 08/25/2014 | finished basement, hydrant back flow in basement | TED | TED | | PTO | C | 4803346 |
HOMEOWNER | PWO | C | 07/29/2014 | POTABLE WATER CERT BY FINAL | GABE | GABE | | PWO | C | 4785940 |
FOREST PLUMBING | PB+ | C | 05/01/2014 | FOR WATER TO HYDRANT - BACK FLOW FOR HYDRANT AND POTABLE WATER CERTIFICATE BY FINAL | GABE | GABE | | PB+ | C | 4730758 |
FOREST PLUMBING | PB | C | 04/25/2014 | | GABE | GABE | | PB | C | 4726968 |
FOREST PLUMBING | PWO | P | 04/15/2014 | | GABE | GABE | | PWO | P | 4720405 |