ROBINSON CONSTRUCTION, LLC. | B= | C | 03/19/2015 | Engineering for all welding and red iron on file | JEREMYA | JEREMYA | | B= | C | 4920112 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 12/03/2014 | to extend permit | BPHILLIPS | BPHILLIPS | | BSP | P | 4863602 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | BSP | T | 12/02/2014 | PAID (REC#1235174): PLAN SPLICE FEE: $50 by: RUSSELL for Mechanical: revised gas piping | RUSSELL | RUSSELL | | BSP | T | 4862744 |
ROBINSON CONSTRUCTION, LLC. | BSP | T | 11/14/2014 | PAID (REC#1232284) ADDITIONAL PLAN REVIEW TIME: $50 From: TCRIPPEN new splice pages new heaters new gas lines | TCRIPPEN | TCRIPPEN | | BSP | T | 4854130 |
ROBINSON CONSTRUCTION, LLC. | BSP | T | 07/18/2014 | PAID (REC#1209582): ADDITIONAL PLAN REVIEW TIME: $50 From: JIMA splice : added 2he soffit for mech ducts | JIMA | JIMA | | BSP | T | 4779305 |
ROSS ELECTRIC-ENTERPRISE, INC. | BSP | T | 05/22/2014 | PAID (REC#1199210): PLAN SPLICE FEE: $50 by: DOUG for Electrical | DOUG | DOUG | | BSP | T | 4744246 |
ROBINSON CONSTRUCTION, LLC. | BLA | C | 04/28/2014 | | JOHN | JOHN | | BLA | C | 4727921 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 04/23/2014 | first and second layers of rock ok on new soffit pending approved design and splice onto plan by RBD | JOHN | JOHN | | BSP | P | 4726042 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 04/23/2014 | not ready | JOHN | JOHN | | BSP | P | 4725249 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 04/22/2014 | above ceiling ok / need all other MEP's / need design and splice for work being done in store room of adjacent tenant at 2hr wall / walked job with Fred and went over items for final / will still need eng letter for red iron | JOHN | JOHN | | BSP | P | 4725050 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 04/18/2014 | roof top frame ok pending elec rough and red iron eng insp letter / new ceiling beams ok pending eng insp letter / above ceiling insp at bathrooms ok | JOHN | JOHN | | BFR | P | 4722985 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 04/04/2014 | overhead door frame ok | JOHN | JOHN | | BFR | P | 4714576 |
ROBINSON CONSTRUCTION, LLC. | BFR | P | 04/02/2014 | bathroom frame only / frame ok pending all MEP roughs | JOHN | JOHN | | BFR | P | 4713496 |
ROBINSON CONSTRUCTION, LLC. | BSP | P | 03/25/2014 | inspections assigned to john w | BLAKE | BLAKE | | BSP | P | 4708047 |
ROSS ELECTRIC-ENTERPRISE, INC. | E= | C | 07/16/2014 | | TOMC | TOMC | | E= | C | 4778339 |
ROSS ELECTRIC-ENTERPRISE, INC. | ER | C | 07/16/2014 | breaker for sub - panel changed to 22k , | TOMC | TOMC | | ER | C | 4778333 |
ROSS ELECTRIC-ENTERPRISE, INC. | EP | R | 05/08/2014 | panel for gold rush will need to be relocated---------- call me 327-2952---------- added inspection for panel relocate only | MATTHEW | MATTHEW | | EP | R | 4735304 |
ROSS ELECTRIC-ENTERPRISE, INC. | ER | P | 04/25/2014 | walls on rooftop | MATTHEW | MATTHEW | | ER | P | 4727008 |
ROSS ELECTRIC-ENTERPRISE, INC. | E= | R | 04/22/2014 | inspected both bathrooms and area outside bathrooms only: need gfci protection for outlets in bathrooms (gfci test needs to be readily accessible, remove existing gfci in stall and blank box, need 22k breaker for 50 amp sub-panel, plans need to be revised (100 amp panel shown), all electrical not being installed needs to be removed from plans, complete all labeling for sub-panel | MATTHEW | MATTHEW | | E= | R | 4724396 |
ROSS ELECTRIC-ENTERPRISE, INC. | ER | P | 04/03/2014 | new bathroom walls only------ | BRIAN | BRIAN | | ER | P | 4714048 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | C | 01/23/2015 | MECHANICAL FINAL OK. TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 4889364 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H= | P | 01/16/2015 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4886441 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 12/12/2014 | DAMPER FRAMING AND SPACING OK, OK TO INSTALL SHEET ROCK AND ANGLES. | NANCY | NANCY | | HD | P | 4871012 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H16 | C | 12/11/2014 | ORIGINAL GAS CONTRACTOR VOIDED OFF OF PERMIT. GAS LINE TO RTU NEEDS TO BE LABELED "MEDIUM PRESSURE" REGULATOR NEEDS TO BE WEATHER PROTECTED. WILL NEED THESE ITEMS TO BE CORRECTED BEFORE MECHANICAL FINAL WILL BE COMPLETED. | NANCY | NANCY | | H16 | C | 4869981 |
DAVID DILLARD, SR. | H= | C | 12/11/2014 | PATIO HEATERS AND GAS FOR PATIO HEATERS: THIS MECHANICAL FINAL IS COMPLETE. INSTALLED AS PER PRINTS. | NANCY | NANCY | | H= | C | 4869976 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 12/09/2014 | REMOVE SHEET ROCK FROM BOTH SIDES OF OPENING. FRAME OPENING PER DAMPER MANUFACTURERS INSTRUCTIONS. | NANCY | NANCY | | HD | P | 4868080 |
DAVID DILLARD, SR. | H= | P | 11/21/2014 | COMPLETE GAS INSTALLATION TO NORTH HEATER. PROVIDE REVISED/APPROVED PRINTS SHOWING MEDIUM PRESSURE GAS, REGULATORS AND ACTUAL INSTALLATION. LABEL ALL MEDIUM PRESSURE GAS EVERY 10 FEET. | NANCY | NANCY | | H= | P | 4858266 |
DAVID DILLARD, SR. | HI | C | 11/20/2014 | 10 LB TEST OK. INSTALL REGULATORS AND COMPLETE GAS TO HEATERS. INSTALLATION INSTRUCTIONS ONLY SHOW INSTALLING HARD GAS PIPE TO HEATERS, NO FLEX IS SHOWN. PROVIDE FURTHER INFORMATION IF INSTALLING GAS FLEX. THIS IS A MEDIUM PRESSURE GAS SYSTEM. BY FINAL NEED REVISED/APPROVED PRINTS SHOWING MEDIUM PRESSURE GAS, LOCATION OF REGULATORS AND ACTUAL GAS LAY OUT INSTALLED. | NANCY | NANCY | | HI | C | 4857685 |
L & L GAS SHOP, LLC. | HE | C | 10/23/2014 | | RITA | RITA | | HE | C | 4840283 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 10/02/2014 | NO PERSONNEL, PRINTS, INSTALLATION INSTRUCTIONS OR LADDER ON SITE. REMOVING A SMALL PORTION OF SHEET ROCK FROM AROUND METAL FRAMING NOT ADEQUATE FOR INSPECTION. PROVIDE DAMPER INSTALLATION INSTRUCTIONS, INSTRUCTIONS TO HAVE A DETAIL FOR A DAMPER ABOVE A CURTAIN TYPE DOOR. IF NO MANUFACTURERS INSTRUCTIONS ARE AVIALABLE FOR THIS TYPE OF INSTALLATION, WILL NEED DETAILED ENGINEER DRAWING SHOWING HOW DAMPER IS TO BE FRAMED. | NANCY | NANCY | | HD | P | 4827687 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | H16 | L | 08/19/2014 | CONSULTED WITH CONTRACTOR TO REFERENCE PREVIOUS INSPECTION NOTES DATED 4-21-14 WITH ISSUES FOR 1 AND 2 HOUR WALL PENETRATIONS. NO PLAN SPLICE HAS BEEN REVIEWED FOR CHANGES TO DATE. CURRENT INSTALLATION DOES NOT MATCH APPROVED PLANS. WILL NEED NEW SPLICE COMPLETED FOR CHANGES WITH PROPER INSPECTIONS REQUESTED FOR DAMPERS. DID FIND EVIDENCE FOR A CHECKED IN MECHANICAL SPLICE WHICH DID NOT FINISH THE PLAN REVIEW PROCESS. | JON | JON | | H16 | L | 4799414 |
L & L GAS SHOP, LLC. | HI | P | 04/23/2014 | THIS IS MEDIUM PRESSURE GAS. NEED REVISED/APPROVED PRINTS SHOWING MEDIUM PRESSURE, ACTUAL GAS LINES INSTALLED AND REGULATOR LOCATIONS. WILL ALSO NEED REVISED PRINTS SHOWING LOCATION OF NEW ROOF TOP UNIT. 10 LB TEST OK ON GAS LINE TO RTU ONLY, NO TUBE HEATERS INSTALLED YET. | NANCY | NANCY | | HI | P | 4725471 |
ENVIRONMENTAL HEATING & AIR CONDITIONING INC. | HD | P | 04/21/2014 | ABOVE BATHROOM GRID ONLY, NEED ENGINEER TO ADDRESS REROUTED DUCT WORK PENETRATIONS THRU 1 HR AND 2 HR WALLS, NEED FIRE DAMPER FRAMING INSPECTIONS IF METHOD DETERMINED IS TO BE USED. | ROBERTV | ROBERTV | | HD | P | 4723673 |
HOGAN MECHANICAL, INC. | P= | C | 04/30/2014 | | TIM | TIM | | P= | C | 4730474 |
HOGAN MECHANICAL, INC. | PTO | C | 04/02/2014 | | TIM | TIM | | PTO | C | 4713377 |
HOGAN MECHANICAL, INC. | PB | C | 03/25/2014 | | JOEL | JOEL | | PB | C | 4708563 |