HOMEOWNER | B= | C | 11/04/2015 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 5072266 |
HOMEOWNER | B= | P | 10/29/2015 | . Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | BOBF | BOBF | | B= | P | 5068894 |
HOMEOWNER | BE | P | 07/13/2015 | | NELIDA | NELIDA | | BE | P | 4991383 |
HOMEOWNER | BFR | C | 01/23/2015 | | DALE | DALE | | BFR | C | 4889516 |
HOMEOWNER | BFR | P | 01/21/2015 | complete HI | DALE | DALE | | BFR | P | 4888497 |
HOMEOWNER | BFN | C | 06/05/2014 | rebar mat for concrete ok | CHRISM | CHRISM | | BFN | C | 4751887 |
HOMEOWNER | BFT | C | 05/21/2014 | 4000# bearing | CHRISM | CHRISM | | BFT | C | 4743028 |
HOMEOWNER | E= | C | 08/13/2015 | | CRAIG | CRAIG | | E= | C | 5014410 |
HOMEOWNER | ER | C | 01/20/2015 | no cen vac, no mcc's, no basement | MATTHEW | MATTHEW | | ER | C | 4887588 |
HOMEOWNER | ER | R | 01/05/2015 | need to make up grounds and ground all metal boxes, install front. back and deck outlets, missing switch leg to bath light, strap flex | MATTHEW | MATTHEW | | ER | R | 4880356 |
HOMEOWNER | ES | C | 10/09/2014 | Residential Underground: 125 amp 4 wire to dome house | TOMC | TOMC | | ES | C | 4831954 |
HOMEOWNER | EUG | R | 09/25/2014 | need #4 al equipment ground for 125 amp | MATTHEW | MATTHEW | | EUG | R | 4823123 |
HOMEOWNER | ER | P | 06/06/2014 | exterior walls only of guest house ( dome shape ) | CRAIG | CRAIG | | ER | P | 4753270 |
HOMEOWNER | EP | P | 04/08/2014 | 50 amp sub to well house fed from temp service at this time-------- when panel is moved to home verify grounding electrode is installed at pump house | MATTHEW | MATTHEW | | EP | P | 4716379 |
HOMEOWNER | H= | C | 10/20/2015 | mechanical final ok. note direct vent boiler, air transfer in place. | CHUCKF | CHUCKF | | H= | C | 5061218 |
HOMEOWNER | HI | C | 01/22/2015 | 1'' boiler, by final need letter for 2lb system | TED | TED | | HI | C | 4888964 |
JOHNSON HEATING AND PLUMBING, INC. | HC | C | 12/01/2014 | RELEASE METER | MARK | MARK | | HC | C | 4861888 |
JOHNSON HEATING AND PLUMBING, INC. | HRR | C | 11/26/2014 | Rough ok. Note: will need to inspect boiler vents at final. | MARK | MARK | | HRR | C | 4861225 |
JOHNSON HEATING AND PLUMBING, INC. | HO | C | 11/25/2014 | 60lb test on outside under ground p.e. from guest house to road, need letter of approval for 2lb system by final | TED | TED | | HO | C | 4860357 |
JOHNSON HEATING AND PLUMBING, INC. | HWP | P | 08/28/2014 | test for upper level is good, ok to cover | MARK | MARK | | HWP | P | 4805885 |
JOHNSON HEATING AND PLUMBING, INC. | HWP | P | 07/07/2014 | 50lb test ok. Ok to cover. | MARK | MARK | | HWP | P | 4771572 |
JOHNSON HEATING AND PLUMBING, INC. | HWP | R | 07/03/2014 | Low test. | MARK | MARK | | HWP | R | 4770799 |
JOHNSON HEATING AND PLUMBING, INC. | P= | C | 08/20/2015 | | JACK | JACK | | P= | C | 5018490 |
JOHNSON HEATING AND PLUMBING, INC. | PWO | C | 08/20/2015 | Water line depth to be on House permit. | JACK | JACK | | PWO | C | 5018487 |
JOHNSON HEATING AND PLUMBING, INC. | P= | P | 08/19/2015 | certificate of potable water to scanning under permit J39182 | TED | TED | | P= | P | 5017575 |
HOMEOWNER | P= | P | 08/11/2015 | still need pwo and proof of potable water | TIM | TIM | | P= | P | 5011985 |
HOMEOWNER | P= | R | 08/05/2015 | STAND PIPE UNDER SINK NEEDS TO BE 18 MIN , DISPOSAL NOT LOCKED , NO PWO HAS BEEN CALLED IN , NEED POTABLE WATER CERT | GABE | GABE | | P= | R | 5008583 |
JOHNSON HEATING AND PLUMBING, INC. | PTO | C | 10/23/2014 | dome house, no basement, future guest house | TED | TED | | PTO | C | 4840504 |
JOHNSON HEATING AND PLUMBING, INC. | PB | C | 06/24/2014 | DWV AND H2O . OTHER DWV IS DAYLIGHT FOR GARAGE DRAIN | GABE | GABE | | PB | C | 4764286 |