BRYAN CONSTRUCTION, INC. | B= | C | 07/22/2014 | All other required Final inspections are complete. (This is a computer generated result) | BERTW | BERTW | | B= | C | 4780978 |
BRYAN CONSTRUCTION, INC. | BFR | C | 07/21/2014 | | BERTW | BERTW | | BFR | C | 4780329 |
BRYAN CONSTRUCTION, INC. | B= | P | 07/21/2014 | Additional Inspections Required: COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet. | BERTW | BERTW | | B= | P | 4780328 |
COLORADO SHEET METAL CO., INC. | BSP | T | 06/10/2014 | PAID (REC#1200583): ADDITIONAL PLAN REVIEW TIME: $50 From: TCRIPPEN Removed return air duct. | TCRIPPEN | TCRIPPEN | | BSP | T | 4754617 |
BRYAN CONSTRUCTION, INC. | BFR | P | 05/12/2014 | Walls and hard lid framing OK pending other rough inspections | JEREMYA | JEREMYA | | BFR | P | 4736783 |
BRYAN CONSTRUCTION, INC. | BSP | P | 05/12/2014 | inspections assigned to bert | BLAKE | BLAKE | | BSP | P | 4736690 |
BIBLE ELECTRIC, INC. | E= | C | 06/26/2014 | | BRET | BRET | | E= | C | 4765889 |
BIBLE ELECTRIC, INC. | E= | C | 06/24/2014 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 4763987 |
BIBLE ELECTRIC, INC. | ER | C | 06/18/2014 | FIRE ALARM INSPECTION: | BRET | BRET | | ER | C | 4760285 |
BIBLE ELECTRIC, INC. | ER | C | 06/18/2014 | | BRET | BRET | | ER | C | 4760282 |
BIBLE ELECTRIC, INC. | ER | P | 06/05/2014 | suite ok corridor not ready | BRET | BRET | | ER | P | 4752385 |
BIBLE ELECTRIC, INC. | ER | P | 06/05/2014 | FIRE ALARM INSPECTION: corridor not ready | BRET | BRET | | ER | P | 4752383 |
BIBLE ELECTRIC, INC. | ER | P | 05/13/2014 | walls | BRIAN | BRIAN | | ER | P | 4737660 |
COLORADO SHEET METAL CO., INC. | H= | C | 07/22/2014 | TEST AND BALANCE REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 4780977 |
HARMON - BONDED PLUMBING & HEATING, INC. | H= | C | 07/16/2014 | OK | JERRYF | JERRYF | | H= | C | 4777481 |
COLORADO SHEET METAL CO., INC. | H= | P | 06/23/2014 | PARTIAL PENDING TEST AND BALANCE REPORT - REST OK | JERRYF | JERRYF | | H= | P | 4763371 |
COLORADO SHEET METAL CO., INC. | H= | P | 06/13/2014 | PARTIAL PENDING COMPLETION OF FIRE DAMPER ANGLE AND GRILLES X 2 IN LOBBY - NEED TEST AND BALANCE - REST OK - PLAN SPLICE SHOULD BE IN SYSTEM BY MONDAY - LOOKED AT SPLICE IN FIELD | JERRYF | JERRYF | | H= | P | 4757788 |
HARMON - BONDED PLUMBING & HEATING, INC. | HWP | C | 06/13/2014 | ALL PIPE INSULATION COMPLETE | JERRYF | JERRYF | | HWP | C | 4757787 |
HARMON - BONDED PLUMBING & HEATING, INC. | HWP | P | 06/06/2014 | LEAVE CEILING OPEN AT ALL FCU UNITS TO VERIFY PIPE INSULATION AT FINAL - UNITS 1100 - 4 - 1100 -5 - 1100 - 6 - 1100 - 7 - 1100 - 8 - 1100 - 1 ALL UNDER WORKING PRESSURE - ALL OK | JERRYF | JERRYF | | HWP | P | 4753292 |
COLORADO SHEET METAL CO., INC. | HD | P | 05/28/2014 | OK TO WRAP, NEED FIRE DAMPER FRAMING INSPECTION AT ELEVATOR BEFORE SHEETROCK, CHECK AS-BUILT INSTALLATION WITH SPLICE BEFORE TILES | ROBERTV | ROBERTV | | HD | P | 4746497 |
HARMON - BONDED PLUMBING & HEATING, INC. | P= | C | 07/16/2014 | | JOEL | JOEL | | P= | C | 4777842 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | C | 05/15/2014 | | JOEL | JOEL | | PTO | C | 4739185 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | P | 05/14/2014 | missing proper support on 10th floor, install riser clamps for 2-sinks, need vacuum relief for wh's | JOEL | JOEL | | PTO | P | 4738379 |