WOODBROHOMES LLC. | B= | C | 08/07/2015 | finished basement, deck in | DALE | DALE | | B= | C | 5010312 |
WOODBROHOMES LLC. | BSP | R | 08/06/2015 | not ready for final, walked house with contractor | DALE | DALE | | BSP | R | 5009178 |
WOODBROHOMES LLC. | BLA | C | 05/06/2015 | | DALE | DALE | | BLA | C | 4949853 |
WOODBROHOMES LLC. | BTR | C | 02/20/2015 | | DALE | DALE | | BTR | C | 4906483 |
WOODBROHOMES LLC. | BTR | R | 02/13/2015 | batts incomplete, ridge boards not installed -- | ED | ED | | BTR | R | 4902684 |
WOODBROHOMES LLC. | BFR | C | 01/09/2015 | items completed, engineer repair letter on file | ED | ED | | BFR | C | 4883270 |
WOODBROHOMES LLC. | BIN | C | 01/09/2015 | | ED | ED | | BIN | C | 4883265 |
WOODBROHOMES LLC. | BFR | R | 01/07/2015 | block garage door brackets / foam and firestop / TJI notched at plumbing / hanger TJI at headout / ok to insulate | DALE | DALE | | BFR | R | 4881823 |
WOODBROHOMES LLC. | BSP | P | 12/18/2014 | trusses only ok | DALE | DALE | | BSP | P | 4874244 |
WOODBROHOMES LLC. | BSP | R | 12/17/2014 | trusses missing T bracing, recheck all | DALE | DALE | | BSP | R | 4873349 |
WOODBROHOMES LLC. | BSP | P | 12/12/2014 | porch frames and deck surface | DALE | DALE | | BSP | P | 4870862 |
WOODBROHOMES LLC. | BFD | C | 06/10/2014 | | CHRISM | CHRISM | | BFD | C | 4754861 |
WOODBROHOMES LLC. | BFN | C | 05/30/2014 | all paperwork on file / float / drain habitable / ufer in | DALE | DALE | | BFN | C | 4748194 |
WOODBROHOMES LLC. | BFT | C | 05/30/2014 | interior pads ok | DALE | DALE | | BFT | C | 4748192 |
WOODBROHOMES LLC. | BFT | P | 05/23/2014 | footer ok, no interior pads, no open hole on site, pour at own risk | CHRISM | CHRISM | | BFT | P | 4744751 |
HOMEOWNER | E= | C | 08/06/2015 | corrections made | CRAIG | CRAIG | | E= | C | 5009642 |
HOMEOWNER | E= | R | 08/05/2015 | in-use covers at lower back and by garage man door upside down, missing face plate at exterior outlet side of house by garage, need 4 wire outlet at dryer, gfci 6' from wet bar sink (lower outlet), afci circuit 2 in sub-panel (work out room lights), label breaker 10 in main panel, protect nm in mech room-------- no a/c | MATTHEW | MATTHEW | | E= | R | 5008768 |
HOMEOWNER | E= | R | 08/03/2015 | gfi all exterior outlet and tr / wr typr ----------- install gfi breaker for garage door outlets ---------- gfi all small appliance circuits ( 3 ) ------------ buried outlet office behind door to the right ---------- install inter system bonding terminal ---------- both bedrooms in basement closet lights to close to shelve ------- install tr type outlets in wet bar / covers ------ gfi all outlets within 6' of wet bar ------------- install smoke detector in basement bedroom ---------- gfi all outlets in mech room ---------- install blanks in mech room ---------- block nm cable on top in mech room ------------- install breaker lock for oven ------- afci per 2011 ( fire place / smokes / living room / exercise room ---------- in sub panel cir 2 needs to be on 15 amp ---------- in main panel cir 1 needs to be on 15 amp ----------- handle tie 5, 7 in main panel ---------- install 250. 94 ------------ install all exterior lights ------------- complete re inspect | CRAIG | CRAIG | | E= | R | 5006922 |
HOMEOWNER | ES | C | 08/03/2015 | Residential Underground: 200 amp 3/w new res seal meter | CRAIG | CRAIG | | ES | C | 5006912 |
HOMEOWNER | ER | C | 12/23/2014 | finished basement, 100 amp sub-panel ok, check mcc's at time of service | MATTHEW | MATTHEW | | ER | C | 4877390 |
HOMEOWNER | ER | R | 12/17/2014 | not ready----- consultation------- partial list: need outlet for deck, install exterior can lights, make up all grounds, need small appliance circuits for kitchen and dining room, correct spacing in master bed room, remove closet outlets for bath circuit, need #4 to ufer, make up sub-panel correctly ------ complete re-inspect | MATTHEW | MATTHEW | | ER | R | 4873745 |
HOMEOWNER | H= | C | 08/05/2015 | CORRECTIONS MADE.. | LUKE | LUKE | | H= | C | 5008901 |
HOMEOWNER | H= | P | 08/03/2015 | Need to complete f/p termination (Cap) and provide m/a to laundry rm. Rest ok. Note: sealed combustion boiler for heat and domestic. | MARK | MARK | | H= | P | 5006303 |
C.W.'S PLBG. & HOT WATER HEAT | HWP | P | 01/05/2015 | ok to cover 1st floor | TED | TED | | HWP | P | 4880393 |
HOMEOWNER | HC | C | 01/05/2015 | RELEASE METER | TED | TED | | HC | C | 4880391 |
HOMEOWNER | HRR | C | 01/05/2015 | correction made | TED | TED | | HRR | C | 4880387 |
C.W.'S PLBG. & HOT WATER HEAT | HI | C | 12/23/2014 | 1 1/4'' boiler, fireplace, range | TED | TED | | HI | C | 4877130 |
HOMEOWNER | HRR | R | 12/23/2014 | need full sized kitchen hood vent outlet hood on roof, | TED | TED | | HRR | R | 4877127 |
HOMEOWNER | HRR | R | 12/17/2014 | need clearance to wood framing on fireplace, install solid piping for range hood venting (not flex duct), install boiler venting, note: hot water heat, no a/c, finished basement | TED | TED | | HRR | R | 4873506 |
C.W.'S PLBG. & HOT WATER HEAT | HWP | P | 07/14/2014 | ok to cover basement, no permit card found | TED | TED | | HWP | P | 4776117 |
HOMEOWNER | P= | C | 08/05/2015 | | TIM | TIM | | P= | C | 5008661 |
C.W.'S PLBG. & HOT WATER HEAT | PWO | C | 08/04/2015 | POTABLE WATER CERT BY FINAL | GABE | GABE | | PWO | C | 5007020 |
HOMEOWNER | P= | P | 08/03/2015 | dishwasher not to code need proof of potable water and pwo inspection | TIM | TIM | | P= | P | 5006782 |
C.W.'S PLBG. & HOT WATER HEAT | PTO | C | 01/05/2015 | correction made | TED | TED | | PTO | C | 4880395 |
C.W.'S PLBG. & HOT WATER HEAT | PTO | R | 12/23/2014 | need 60lb test on water piping, not all dwv is under test, need more test blocks, note: finished basement, aav at bar sink | TED | TED | | PTO | R | 4877131 |
C.W.'S PLBG. & HOT WATER HEAT | PB | C | 06/26/2014 | NOTE : POTABLE WATER CERT BY FINAL | GABE | GABE | | PB | C | 4765852 |
C.W.'S PLBG. & HOT WATER HEAT | PB | R | 06/23/2014 | NO TEST | GABE | GABE | | PB | R | 4763068 |