CONSTRUCTION BY GENESIS, INC. | B= | C | 12/05/2014 | bath in basement only finished / deck in | DALE | DALE | | B= | C | 4865923 |
CONSTRUCTION BY GENESIS, INC. | B= | R | 12/04/2014 | need handrail at stairs at cellar door | DALE | DALE | | B= | R | 4864968 |
CONSTRUCTION BY GENESIS, INC. | BSP | P | 11/19/2014 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical | DALEH | DALEH | | BSP | P | 4856450 |
CONSTRUCTION BY GENESIS, INC. | BSP | P | 10/10/2014 | deck frames ok | DALE | DALE | | BSP | P | 4832728 |
CONSTRUCTION BY GENESIS, INC. | BLA | C | 09/22/2014 | | DALE | DALE | | BLA | C | 4820295 |
CONSTRUCTION BY GENESIS, INC. | BLA | R | 09/19/2014 | canceled by contractor | DALE | DALE | | BLA | R | 4819760 |
CONSTRUCTION BY GENESIS, INC. | BIN | C | 09/05/2014 | | ED | ED | | BIN | C | 4810950 |
CONSTRUCTION BY GENESIS, INC. | BFR | C | 09/03/2014 | | DALE | DALE | | BFR | C | 4808837 |
CONSTRUCTION BY GENESIS, INC. | BFR | P | 08/29/2014 | narrow wall to be nailed per plan / remove combusibles from B vent / okay to insulate | BOBF | BOBF | | BFR | P | 4807228 |
CONSTRUCTION BY GENESIS, INC. | BSP | P | 07/14/2014 | insulation ok at outside solar wall only | DALE | DALE | | BSP | P | 4776019 |
CONSTRUCTION BY GENESIS, INC. | BSP | P | 06/03/2014 | 4 piers ok | DALE | DALE | | BSP | P | 4750089 |
CONSTRUCTION BY GENESIS, INC. | BFD | C | 05/28/2014 | soils on file drain usable isolate and float | CHRISM | CHRISM | | BFD | C | 4746634 |
CONSTRUCTION BY GENESIS, INC. | BFN | C | 05/28/2014 | design and eng report on file | CHRISM | CHRISM | | BFN | C | 4746633 |
CONSTRUCTION BY GENESIS, INC. | BFT | C | 05/28/2014 | eng report on file | CHRISM | CHRISM | | BFT | C | 4746623 |
CONSTRUCTION BY GENESIS, INC. | BFN | P | 05/13/2014 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFN | P | 4737535 |
CONSTRUCTION BY GENESIS, INC. | BFT | P | 05/13/2014 | AUTHORIZED INSPECTION BY ENGINEER | JANE | JANE | JANE | BFT | P | 4737534 |
POSITIVE ELECTRIC, LLC | E= | C | 11/24/2014 | | CRAIG | CRAIG | | E= | C | 4859823 |
POSITIVE ELECTRIC, LLC | E= | R | 11/20/2014 | afci dining room lights, neutral bonded in well disconnect, gfci for spa needs to be at the breaker, outlet at spa needs to face opening, neutrals need to originate at same panel as circuit conductors (generator panel), feed for future generator need to land on breaker not main lugs, conduit from panel to generator overfilled,----------- a/c pre-wire----------- future generator set up | MATTHEW | MATTHEW | | E= | R | 4857713 |
POSITIVE ELECTRIC, LLC | ES | C | 08/26/2014 | Residential Underground: 200 amp 3/w: new res------ meter is set; need seal | MATTHEW | MATTHEW | | ES | C | 4804189 |
POSITIVE ELECTRIC, LLC | ER | C | 08/26/2014 | basement bathroom only, 1-20, 8-3nm cooking | MATTHEW | MATTHEW | | ER | C | 4804181 |
POSITIVE ELECTRIC, LLC | EUG | C | 06/09/2014 | service lateral from pedestal to home | MATTHEW | MATTHEW | | EUG | C | 4753972 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 11/24/2014 | correction made | TED | TED | | H= | C | 4859551 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | R | 11/21/2014 | remove stucco in bay vent furnace outlet and seal vent piping inside bay vent, no return in front room (hobby room) off garage, need to center and correct water heater draft hood on left water heater, need clearance around b vent, note: performance test to scanning, no a/c, basement bathroom finish only, conditioned crawlspace | TED | TED | | H= | R | 4858321 |
CORNERSTONE PLUMBING INC | HC | C | 07/28/2014 | RELEASE METER | TED | TED | | HC | C | 4785144 |
CORNERSTONE PLUMBING INC | HI | C | 07/28/2014 | 1 1/2'' furnace, 2-water heaters, fireplace, range, generator | TED | TED | | HI | C | 4785134 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 07/25/2014 | bath fan vent ok, by final still need performance test, furnace change paper work, and zone dampers installed | TED | TED | | HRR | C | 4784258 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | T | 07/24/2014 | PAID (REC#1209605): no change master bath fan flex duct, by final need furnace change paper work and performance test, note: basement bathroom finish, rest unfinished, no a/c, conditioned crawlspace | TED | TED | | HRR | T | 4783552 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | R | 07/23/2014 | duct lay out not to plan, missing zone dampers, furnace not to plan (90% installed, plan has 80%) master bath fan vent flex full of water | TED | TED | | HRR | R | 4782598 |
CORNERSTONE PLUMBING INC | P= | C | 12/04/2014 | received potable water cert | TIM | TIM | | P= | C | 4864560 |
CORNERSTONE PLUMBING INC | P= | P | 12/03/2014 | need proof of potable water...only 2 vtr's???
| TIM | TIM | | P= | P | 4864169 |
CORNERSTONE PLUMBING INC | PTO | C | 07/28/2014 | basement bathroom finished only | TED | TED | | PTO | C | 4785130 |
CORNERSTONE PLUMBING INC | PTO | R | 07/25/2014 | NOT READY | GABE | GABE | | PTO | R | 4784460 |
HOMEOWNER | PWO | C | 06/19/2014 | | GABE | GABE | | PWO | C | 4761159 |
CORNERSTONE PLUMBING INC | PB | C | 06/03/2014 | DWV AND H20 OK . NOTE POTABLE WATER CERT BY FINAL | GABE | GABE | | PB | C | 4749995 |