BUILTRITE BUILDERS | B= | C | 01/16/2015 | Additional Inspections Required. complete H= / finish basement, deck in | DALE | DALE | | B= | C | 4886252 |
BUILTRITE BUILDERS | B= | R | 01/16/2015 | Additional Inspections Required: Mechanical Final Inspection is not Completed yet (This is a computer generated result) | SYSTEM | SYSTEM | | B= | R | 4886253 |
BUILTRITE BUILDERS | BLA | C | 11/12/2014 | | DALE | DALE | | BLA | C | 4852169 |
BUILTRITE BUILDERS | BIN | C | 11/06/2014 | | BOBF | BOBF | | BIN | C | 4850010 |
BUILTRITE BUILDERS | BFR | C | 11/06/2014 | engineer letter for steel post on file | BOBF | BOBF | | BFR | C | 4850009 |
BUILTRITE BUILDERS | BFR | P | 11/03/2014 | 6 member post and draftstop complete / need to check weld at beam and metal beam post in lower garage at BIN / provide engineers letter for metal post under beam | BOBF | BOBF | | BFR | P | 4846788 |
BUILTRITE BUILDERS | BFR | R | 10/30/2014 | 6 2x6 under garage girder / foam and firestop / weld post to beam / plan does not call for size of wood post under beam / ok to insulate | DALE | DALE | | BFR | R | 4845072 |
BUILTRITE BUILDERS | BSP | P | 10/20/2014 | shear ok | DALE | DALE | | BSP | P | 4838230 |
BUILTRITE BUILDERS | BSP | P | 09/24/2014 | porch frames ok | DALE | DALE | | BSP | P | 4821951 |
BUILTRITE BUILDERS | BSP | P | 09/18/2014 | meet with contractor | DALE | DALE | | BSP | P | 4818735 |
BUILTRITE BUILDERS | BSP | R | 09/05/2014 | cannot use white wood posts supporting deck and porches that will be buried in concrete, no plans on site | ED | ED | | BSP | R | 4810764 |
BUILTRITE BUILDERS | BFI | C | 06/26/2014 | R-10 at walkout | CHRISM | CHRISM | | BFI | C | 4765854 |
BUILTRITE BUILDERS | BFD | C | 06/26/2014 | soils on file | CHRISM | CHRISM | | BFD | C | 4765845 |
BUILTRITE BUILDERS | BFD | P | 06/24/2014 | open hole on file, drain usable ok, isolate and float, need copy of full soils and walkout wall insulation | CHRISM | CHRISM | | BFD | P | 4764733 |
BUILTRITE BUILDERS | BFN | C | 06/24/2014 | design and eng report on file | CHRISM | CHRISM | | BFN | C | 4764706 |
BUILTRITE BUILDERS | BFT | C | 06/24/2014 | eng report on file | CHRISM | CHRISM | | BFT | C | 4764704 |
POSITIVE ELECTRIC, LLC | E= | C | 12/19/2014 | | MATTHEW | MATTHEW | | E= | C | 4875673 |
POSITIVE ELECTRIC, LLC | E= | R | 12/15/2014 | bath gfci won't set (need to check all bath outlets at time of re-inspect), provide safe means to check deck outlets, install blank in pantry, install cu to al connector at oven disconnect, master closet light too close to shelf, master tub light not installed at time of inspection--------------- 40 amp a/c ok | MATTHEW | MATTHEW | | E= | R | 4871842 |
POSITIVE ELECTRIC, LLC | ER | C | 10/24/2014 | finished basement, 3-20 at service, 100 amp sub-panel ok (not breakered) | MATTHEW | MATTHEW | | ER | C | 4841579 |
POSITIVE ELECTRIC, LLC | ES | C | 10/24/2014 | Residential Overhead: 200 amp 3/w: new res------ meter is set-- need seal | MATTHEW | MATTHEW | | ES | C | 4841578 |
POSITIVE ELECTRIC, LLC | EUG | C | 07/18/2014 | 4/0 urd ok | TOMC | TOMC | | EUG | C | 4779765 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 01/16/2015 | Correction made. Note: furnace model matches plans. | MICHAELS | MICHAELS | | H= | C | 4886475 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 01/15/2015 | Need to clear stucco from furnace vent termination. Need equipment letter.Rest ok. Note: Hi/Lo grills to mech rm. Sealed combustion furn. Has fin. bsmnt, has a/c. | MARK | MARK | | H= | P | 4885465 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 10/29/2014 | RELEASE METER | MICHAELS | MICHAELS | | HC | C | 4844441 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 10/29/2014 | Corrections made. | MICHAELS | MICHAELS | | HRR | C | 4844436 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | R | 10/27/2014 | Lower lvl return missing in hallway. B vent touching wood and electrical, mn lvl f/p needs sleeve for gas to f/p cabinet (Flex), 4" heat run to b/r #3 is not connected to trunk line. mn lvl return in wall too small at floor. Need m/a at both laundry rms by final. Note: Re inspect all. | MARK | MARK | | HRR | R | 4842310 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | P | 10/24/2014 | Bath exhaust not complete. Nail plate required at dryer vent. Unable to inspect fireplace vents - chase is covered. **Equipment cert needed at final. | JEFFL | JEFFL | | HRR | P | 4841942 |
RIDGEVIEW PLUMBING | HI | C | 10/09/2014 | 10 # TEST OK . 1 COOK TOP , 4 FIREPLACES , 1 FUTURE GARAGE HEATER , 1 DRYER , 2 WATER HEATERS , 1 FURNACE | GABE | GABE | | HI | C | 4831912 |
RIDGEVIEW PLUMBING | P= | C | 01/08/2015 | POTABLE WATER CERT TO SCANNING , NOTE : FINISHED BASEMENT , NO IRRIGATION | GABE | GABE | | P= | C | 4882083 |
RIDGEVIEW PLUMBING | PTO | C | 10/09/2014 | NOTE : FINISHED BASEMENT . NO IRRIGATION . CHECK STRAPPING | GABE | GABE | | PTO | C | 4831908 |
HOMEOWNER | PWO | C | 07/16/2014 | PEX STUBBED UNDER FOOTER | GABE | GABE | | PWO | C | 4777710 |
RIDGEVIEW PLUMBING | PB | C | 07/08/2014 | NOTE : POTABLE WATER CERT BY FINAL | GABE | GABE | | PB | C | 4772534 |