STEVE R. JACKSON | B= | C | 01/26/2015 | All other required Final inspections are complete. (This is a computer generated result) | ED | ED | | B= | C | 4890095 |
STEVE R. JACKSON | B= | P | 12/24/2014 | Additional Inspections Required. finished basement | ED | ED | | B= | P | 4877918 |
STEVE R. JACKSON | B= | R | 12/24/2014 | Additional Inspections Required: External Agency Inspection HD= by HEALTHDEPT is not Completed yet (This is a computer generated result) | SYSTEM | SYSTEM | | B= | R | 4877919 |
STEVE R. JACKSON | BSP | T | 12/22/2014 | PAID (REC#1238576): ADDITIONAL PLAN REVIEW TIME: $50 From: DALEH change furnace selection to 93% | DALEH | DALEH | | BSP | T | 4876580 |
STEVE R. JACKSON | BLA | C | 10/17/2014 | | DALE | DALE | | BLA | C | 4836600 |
STEVE R. JACKSON | BIN | C | 10/10/2014 | frame ok | DALE | DALE | | BIN | C | 4832810 |
STEVE R. JACKSON | BFR | R | 09/29/2014 | install roof jacks / need spark shield on fireplace / foam and firestop / nail narrow wall per plans / hts16 at patio / ok to insulate | DALE | DALE | | BFR | R | 4824403 |
STEVE R. JACKSON | BSP | T | 07/22/2014 | PAID (REC#1222554): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: Moved furnace six feet and added ductwork. | DALEH | DALEH | | BSP | T | 4781694 |
STEVE R. JACKSON | BFD | P | 06/30/2014 | drain usable ok, need stamped open hole for file, soils on file | CHRISM | CHRISM | | BFD | P | 4768211 |
STEVE R. JACKSON | BFN | C | 06/30/2014 | design and eng report on file | CHRISM | CHRISM | | BFN | C | 4768207 |
STEVE R. JACKSON | BFT | C | 06/30/2014 | eng report on file | CHRISM | CHRISM | | BFT | C | 4768171 |
STEVE R. JACKSON | BFN | P | 06/19/2014 | AUTHORIZED INSPECTION BY ENGINEER | KENYATTA | KENYATTA | KENYATTA | BFN | P | 4761034 |
STEVE R. JACKSON | BFT | P | 06/19/2014 | AUTHORIZED INSPECTION BY ENGINEER | KENYATTA | KENYATTA | KENYATTA | BFT | P | 4761033 |
EMPIRE INCORPORATED | E= | C | 12/22/2014 | | MATTHEW | MATTHEW | | E= | C | 4876581 |
EMPIRE INCORPORATED | E= | R | 12/19/2014 | install inter-system bond terminal, 2 sump breakers labeled, gfci all kitchen counter outlets, label furnace disconnect, gfci mech room outlets, deck outlet pulling out of wall, protect nm in sump closet, ground light under stairs----------- no a/c | MATTHEW | MATTHEW | | E= | R | 4875241 |
FOUNTAIN VALLEY ELECTRICAL, LLC | EUG | P | 12/04/2014 | feeder from house to barn-------------------- need separate permit for barn | MATTHEW | MATTHEW | | EUG | P | 4865076 |
EMPIRE INCORPORATED | ES | C | 10/06/2014 | Residential Underground: 200 amp 3/w: new res-------- meter is set and sealed | MATTHEW | MATTHEW | | ES | C | 4829344 |
EMPIRE INCORPORATED | ER | C | 09/22/2014 | circuits installed for lift station and sump pump , wiring to and from controller installed | TOMC | TOMC | | ER | C | 4820711 |
EMPIRE INCORPORATED | ER | R | 09/16/2014 | need wiring from well to controller and from panel to controller installed, install dedicated circuits for sump and ejector pit, correct spacing in nook right of door | MATTHEW | MATTHEW | | ER | R | 4817077 |
EMPIRE INCORPORATED | ER | L | 09/15/2014 | locked 2:40 | MATTHEW | MATTHEW | | ER | L | 4816218 |
EMPIRE INCORPORATED | EUG | P | 07/01/2014 | temp wiring to well from temp service------well wiring will be re-ran to permanent service from house | MATTHEW | MATTHEW | | EUG | P | 4769461 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 12/23/2014 | correction made, finished basement, no a/c (rough only) water heater in unfinished mech. area over 500sq. feet | TED | TED | | H= | C | 4877211 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | R | 12/22/2014 | need new equipment schedule and splice to plan per hrr note, under cut bedroom doors for return air path, furnace bay vent outlet assembly covered in stucco, plug open drain hole on a/c coil box, remove screen in dryer vent hood outlet on roof, | TED | TED | | H= | R | 4876237 |
DOUBLE J GAS, INC. | H= | P | 10/03/2014 | Fireplace HRR completed on permit J38051 | JACK | JACK | | H= | P | 4828082 |
DOUBLE J GAS, INC. | HI+ | C | 09/24/2014 | need hrr+ inspection for basement fireplace venting being installed after the hrr was completed, note: gas test on house piping ok, added basement fireplace outlet, can change this to a complete after hrr+ inspection is called in ( change to complete from partial 9-26-2014, basement fireplace inspection pulled under permit J 38051 ) | TED | TED | | HI+ | C | 4822081 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 09/18/2014 | RELEASE METER | TED | TED | | HC | C | 4818657 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 09/18/2014 | by final need new equipment schedule and splice to plan, note: other correction made | TED | TED | | HRR | C | 4818633 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | R | 09/17/2014 | no access, house locked | TED | TED | | HRR | R | 4817577 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | R | 09/16/2014 | need to seal returns ends in ceil above basement bathroom, need new equipment schedule and splice for furnace change from plan called for 80% to the 90% that is installed, note: finished basement, a/c rough, outside air to return, duct design | TED | TED | | HRR | R | 4816748 |
DOUBLE J GAS, INC. | HI | C | 09/09/2014 | 1'' furnace, w/h, range | TED | TED | | HI | C | 4812195 |
DOUBLE J GAS, INC. | HI | L | 09/08/2014 | Unable to access.Driveway blocked. Re schedule when ready. | MARK | MARK | | HI | L | 4811426 |
PACIFIC PLUMBING, INCORPORATED | P= | C | 12/23/2014 | received potable water cert | TIM | TIM | | P= | C | 4877308 |
PACIFIC PLUMBING, INCORPORATED | P= | P | 12/22/2014 | need proof of potable wtr | TIM | TIM | | P= | P | 4876420 |
HOMEOWNER | PWO | C | 09/23/2014 | | GABE | GABE | | PWO | C | 4821291 |
PACIFIC PLUMBING, INCORPORATED | PTO | C | 08/12/2014 | | TIM | TIM | | PTO | C | 4795362 |
PACIFIC PLUMBING, INCORPORATED | PB | C | 07/10/2014 | LOWER LEVEL TO PUMP . | GABE | GABE | | PB | C | 4774038 |
HOMEOWNER | PWO | P | 07/01/2014 | OK TO BACK FILL . LEAVE WELL HEAD OPEN FOR TIE IN | GABE | GABE | | PWO | P | 4768817 |