MAJESTIC CUSTOM HOMES, INC. | B= | C | 02/27/2015 | per Bob Frazier (download issues in field) | BPHILLIPS | BPHILLIPS | | B= | C | 4909403 |
MAJESTIC CUSTOM HOMES, INC. | B= | C | 02/27/2015 | | BOBF | BOBF | | B= | C | 4909754 |
MAJESTIC CUSTOM HOMES, INC. | B= | R | 02/25/2015 | Additional Inspections Required. pending Elec, plumb and mech finals / install permanent address on outside of house / install handrail to basement | BOBF | BOBF | | B= | R | 4908266 |
MAJESTIC CUSTOM HOMES, INC. | B= | R | 02/25/2015 | Additional Inspections Required: Electrical Final Inspection is not Completed yet, Mechanical Final Inspection is not Completed yet, Plumbing Final Inspection is not Completed yet (This is a computer generated result) | SYSTEM | SYSTEM | | B= | R | 4908267 |
MAJESTIC CUSTOM HOMES, INC. | BIN | C | 01/07/2015 | | BOBF | BOBF | | BIN | C | 4881793 |
MAJESTIC CUSTOM HOMES, INC. | BFR | C | 01/06/2015 | | BOBF | BOBF | | BFR | C | 4881032 |
MAJESTIC CUSTOM HOMES, INC. | BIN | R | 01/05/2015 | no insulation installed between TGI and rim west half of north wall in basement | BOBF | BOBF | | BIN | R | 4880247 |
MAJESTIC CUSTOM HOMES, INC. | BFR | T | 01/05/2015 | PAID (REC#1239720) fha straps not installed per previous inspection
| BOBF | BOBF | | BFR | T | 4880243 |
MAJESTIC CUSTOM HOMES, INC. | BFR | R | 12/31/2014 | FHA straps at plate breaks less than 2 ' apart in jack and jill bathroom / okay to insulate | BOBF | BOBF | | BFR | R | 4879503 |
MAJESTIC CUSTOM HOMES, INC. | BLA | C | 12/01/2014 | | BOBF | BOBF | | BLA | C | 4862606 |
MAJESTIC CUSTOM HOMES, INC. | BSP | P | 11/12/2014 | porch posts ok | DALE | DALE | | BSP | P | 4852286 |
MAJESTIC CUSTOM HOMES, INC. | BSP | P | 10/20/2014 | front porch posts okay | BOBF | BOBF | | BSP | P | 4837798 |
MAJESTIC CUSTOM HOMES, INC. | BSP | P | 09/23/2014 | front and rear porch and posts okay / deck piers (7) okay | BOBF | BOBF | | BSP | P | 4821228 |
MAJESTIC CUSTOM HOMES, INC. | BFD | C | 07/18/2014 | | DALE | DALE | | BFD | C | 4779367 |
MAJESTIC CUSTOM HOMES, INC. | BFI | C | 07/18/2014 | | DALE | DALE | | BFI | C | 4779366 |
MAJESTIC CUSTOM HOMES, INC. | BFT | C | 07/18/2014 | ok per eng. | DALE | DALE | | BFT | C | 4779351 |
MAJESTIC CUSTOM HOMES, INC. | BFN | R | 07/18/2014 | looks like foundation wall has been cut and removed and put in garage, has this been inspected by eng.? / remove slabs from garage / all paperwork on file / ufer in per eng. | DALE | DALE | | BFN | R | 4779347 |
MAJESTIC CUSTOM HOMES, INC. | BFN | P | 07/18/2014 | AUTHORIZED INSPECTION BY ENGINEER | TERRI | TERRI | TERRI | BFN | P | 4779287 |
MAJESTIC CUSTOM HOMES, INC. | BFT | P | 07/18/2014 | AUTHORIZED INSPECTION BY ENGINEER | TERRI | TERRI | TERRI | BFT | P | 4779286 |
MAJESTIC CUSTOM HOMES, INC. | BFT | R | 07/16/2014 | no paperwork on site | DALE | DALE | | BFT | R | 4777594 |
MAJESTIC CUSTOM HOMES, INC. | BFD | R | 07/16/2014 | no paperwork on site | DALE | DALE | | BFD | R | 4777593 |
MAJESTIC CUSTOM HOMES, INC. | BFN | R | 07/16/2014 | no paperwork on site | DALE | DALE | | BFN | R | 4777592 |
PEAK ELECTRIC INC. | E= | C | 02/25/2015 | | CRAIG | CRAIG | | E= | C | 4908558 |
PEAK ELECTRIC INC. | E= | R | 02/24/2015 | install nm connect to hot tub and plug hole and ground j box -------------- protect nm cable to well disconnect ---------- a/c pre wire | CRAIG | CRAIG | | E= | R | 4907610 |
PEAK ELECTRIC INC. | ER | C | 12/30/2014 | | CRAIG | CRAIG | | ER | C | 4878992 |
PEAK ELECTRIC INC. | ES | C | 11/21/2014 | Residential Underground: 200 amp- 3/w new res seal meter | CRAIG | CRAIG | | ES | C | 4858837 |
PEAK ELECTRIC INC. | ER | R | 11/21/2014 | install power to well ------------------- 1 - 15 / 3 - 20 2 - 10/3 6/3 al to double oven 6/3 cu to hot tub finished basement | CRAIG | CRAIG | | ER | R | 4858836 |
PEAK ELECTRIC INC. | EUG | C | 09/29/2014 | 3/w 4/0 al | CRAIG | CRAIG | | EUG | C | 4825009 |
BRUNO'S MECHANICAL INC. | H= | C | 02/27/2015 | Corrections completed. Final ok.
| MARK | MARK | | H= | C | 4909336 |
BRUNO'S MECHANICAL INC. | H= | P | 02/25/2015 | Still need to seal holes in return panning. See orig. rough notes. Need to seal panning above water heater and hole in floor return end cap also in mech rm. | MARK | MARK | | H= | P | 4908619 |
BRUNO'S MECHANICAL INC. | H= | P | 02/20/2015 | Need to complete vent termination. Rest ok. Note: No a/c condenser, no mantle, meets 50:1 Sealed combustion. | MARK | MARK | | H= | P | 4906752 |
BRUNO'S HEATING & COOLING | HC | C | 11/25/2014 | RELEASE METER | MARK | MARK | | HC | C | 4860802 |
BRUNO'S HEATING & COOLING | HRR | C | 11/25/2014 | Return bay panning above w/h to be sealed by final. Rest ok | MARK | MARK | | HRR | C | 4860694 |
BRUNO'S HEATING & COOLING | HRR | P | 11/24/2014 | Bath heat run in lower level needs to be completed (Open). Bath fan lower level duct is below framing. Hole in return panning in mech room above water heater needs to be sealed/ Panning for return behind fireplace on main level still needs to be sealed up. Rest ok. Note: Fin. Bsmnt. a/c rough has OSA to return. Equipment matches. | MARK | MARK | | HRR | P | 4859819 |
BRUNO'S HEATING & COOLING | HRR | R | 11/21/2014 | No mechanical plans on site. Need to seal return at back of f/p main lvl, powder fan below framing lower lvl, Need a heat shield on B vent. | MARK | MARK | | HRR | R | 4858522 |
DOUBLE J GAS, INC. | HI | C | 11/13/2014 | 10 lb test ok. Note: 1 1/4" main. Has Furn, w/h, c/t, 2- f/p. | MARK | MARK | | HI | C | 4853475 |
PACIFIC PLUMBING, INCORPORATED | P= | C | 02/23/2015 | POTABLE WATER CERT TO SCANNING , REST OK . NOTE : FINISHED BASEMENT , PVB INSTALLED | GABE | GABE | | P= | C | 4907095 |
MAJESTIC CUSTOM HOMES, INC. | PWO | C | 11/07/2014 | | TIM | TIM | | PWO | C | 4850576 |
PACIFIC PLUMBING, INCORPORATED | PTO | C | 11/03/2014 | | TIM | TIM | | PTO | C | 4847197 |
PACIFIC PLUMBING, INCORPORATED | PB | C | 08/05/2014 | no under slab wtr | TIM | TIM | | PB | C | 4790371 |