STONEBRIDGE HOMES, INC. | B= | C | 12/24/2014 | items completed, as per manufactures installion instructions, spark arrester is required for masonry flue and or chimneys. | ED | ED | | B= | C | 4877863 |
STONEBRIDGE HOMES, INC. | B= | P | 12/23/2014 | Additional Inspections Required. missing smoke /co outside master bedroom; returns on basement handrail; sparkarester on cap of wood burner stove; basement unfinished -- Schedule a new Building Final when above items are complete. | DAN | DAN | | B= | P | 4877369 |
STONEBRIDGE HOMES, INC. | B= | R | 12/23/2014 | Additional Inspections Required: Mechanical Final Inspection is not Completed yet (This is a computer generated result) | SYSTEM | SYSTEM | | B= | R | 4877370 |
STONEBRIDGE HOMES, INC. | BFR | C | 10/15/2014 | | DALE | DALE | | BFR | C | 4835139 |
STONEBRIDGE HOMES, INC. | BIN | C | 10/15/2014 | | DALE | DALE | | BIN | C | 4835136 |
STONEBRIDGE HOMES, INC. | BFR | R | 10/09/2014 | b-vent 1" from roof paper / fireblock at b-vent / strong back at gable ends / strap top plates / need joist hangers at stair landing / ok to insulate | DALE | DALE | | BFR | R | 4832144 |
STONEBRIDGE HOMES, INC. | BLA | C | 10/08/2014 | | DALE | DALE | | BLA | C | 4831034 |
STONEBRIDGE HOMES, INC. | BLA | R | 10/03/2014 | not complete | DALE | DALE | | BLA | R | 4828241 |
STONEBRIDGE HOMES, INC. | BSP | P | 09/04/2014 | truss connections at porch okay | BOBF | BOBF | | BSP | P | 4809474 |
STONEBRIDGE HOMES, INC. | BFT | C | 07/25/2014 | ok per eng. letter on file | DALE | DALE | | BFT | C | 4784280 |
STONEBRIDGE HOMES, INC. | BFN | C | 07/25/2014 | ok per eng. letter on file | DALE | DALE | | BFN | C | 4784279 |
STONEBRIDGE HOMES, INC. | BFD | C | 07/25/2014 | | DALE | DALE | | BFD | C | 4784278 |
STONEBRIDGE HOMES, INC. | BFD | R | 07/24/2014 | drain pipe needs to be placed lower than bottom section of spread footer, as per detail / 5% slope at final / soils report on file / open hole report on file | JEREMYC | JEREMYC | | BFD | R | 4783495 |
STONEBRIDGE HOMES, INC. | BFN | P | 07/24/2014 | need engineer letter for foundation rebar observation / foundation design on file / 1000psf / 1.5" float | JEREMYC | JEREMYC | | BFN | P | 4783494 |
STONEBRIDGE HOMES, INC. | BFT | P | 07/24/2014 | need engineer letter for footer observation | JEREMYC | JEREMYC | | BFT | P | 4783492 |
STONEBRIDGE HOMES, INC. | BFN | P | 07/11/2014 | AUTHORIZED INSPECTION BY ENGINEER | REBECCA | REBECCA | REBECCA | BFN | P | 4774857 |
STONEBRIDGE HOMES, INC. | BFT | P | 07/11/2014 | AUTHORIZED INSPECTION BY ENGINEER | REBECCA | REBECCA | REBECCA | BFT | P | 4774856 |
C. R. BESS ELECTRIC, INC. | E= | C | 12/23/2014 | | MATTHEW | MATTHEW | | E= | C | 4877310 |
C. R. BESS ELECTRIC, INC. | E= | R | 12/19/2014 | need wr outlets for upper deck outlets, no power to smokes (check for afci protection), add outlet for service recep in basement, correct spacing kitchen countertop----------- no a/c------------ | MATTHEW | MATTHEW | | E= | R | 4875667 |
C. R. BESS ELECTRIC, INC. | ER | C | 10/06/2014 | nm stub under deck for exterior outlet | MATTHEW | MATTHEW | | ER | C | 4829250 |
C. R. BESS ELECTRIC, INC. | ES | C | 10/06/2014 | Residential Overhead: 200 amp 3/w: new res-------- meter is set; need seal ------------- fence needs to be removed before final | MATTHEW | MATTHEW | | ES | C | 4829240 |
C. R. BESS ELECTRIC, INC. | ER | R | 10/02/2014 | need back outlet within 6'6" of grade------------ unfinished basement, no mcc's | MATTHEW | MATTHEW | | ER | R | 4827568 |
C. R. BESS ELECTRIC, INC. | ES | R | 10/02/2014 | need sch 80 pvc at pole, fence in working clearance of meter | MATTHEW | MATTHEW | | ES | R | 4827565 |
C. R. BESS ELECTRIC, INC. | EUG | C | 10/02/2014 | 2/0 al service lateral from pole to home | MATTHEW | MATTHEW | | EUG | C | 4827563 |
BRUNO'S HEATING & COOLING | H= | C | 12/24/2014 | correction made | TED | TED | | H= | C | 4877576 |
BRUNO'S HEATING & COOLING | H= | P | 12/18/2014 | need 2lb system letter from black hills, rest ok, unfinished basement, a/c installed | TED | TED | | H= | P | 4874393 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HO | C | 10/13/2014 | 10 lb test ok. Note: 3/4" PE pipe from meter at road to house 120'. | MARK | MARK | | HO | C | 4833180 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HC | C | 10/07/2014 | RELEASE METER | TED | TED | | HC | C | 4830096 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | HI | C | 10/07/2014 | 1 1/4'' furnace, w/h, range, bbq | TED | TED | | HI | C | 4830090 |
BRUNO'S HEATING & COOLING | HRR | C | 10/07/2014 | unfinished basement, a/c rough, outside air to return, duct design | TED | TED | | HRR | C | 4830087 |
BRUNO'S HEATING & COOLING | HRR | L | 10/03/2014 | No mechanical plans found on site. Note: Will need dryer duct before HRR can be completed. | MARK | MARK | | HRR | L | 4828251 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | P= | C | 12/22/2014 | | TIM | TIM | | P= | C | 4876369 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | PWO | C | 11/18/2014 | backflow for yard hydrant by final | TIM | TIM | | PWO | C | 4855449 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | PTO | C | 10/03/2014 | | TIM | TIM | | PTO | C | 4828223 |
ROCKY MOUNTAIN RADIANT HEATING & PLUMBING, INC. | PB | C | 08/01/2014 | NOTE : BASEMENT DRAINS TO A PUMP ONLY | GABE | GABE | | PB | C | 4788695 |