GREGOIRE HOMES, INC. | B= | C | 10/27/2016 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 5330118 |
GREGOIRE HOMES, INC. | B= | P | 10/21/2016 | Building final OK pending mechanical complete / Training with Lindsey S. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), Mechanical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 5324567 |
GREGOIRE HOMES, INC. | BIN | C | 10/21/2016 | | NICK | NICK | | BIN | C | 5324566 |
GREGOIRE HOMES, INC. | BFR | C | 10/21/2016 | | NICK | NICK | | BFR | C | 5324553 |
GREGOIRE HOMES, INC. | B16 | P | 10/20/2016 | Left message for Gary Gregoire about BBQ framing being non combustible with in 12" of grill / Mechanical inspector Mark B brought this up to my attention | NICK | NICK | | B16 | P | 5323181 |
GREGOIRE HOMES, INC. | BE | L | 10/06/2016 | Renewed for 1/2 Fee at 10/6/2016 12:12:19 PM (Receipt#1369253) | RITA | RITA | | BE | L | 5312052 |
GREGOIRE HOMES, INC. | BIN | P | 12/07/2015 | all insulation for upper level OK / all insulation for house OK / Need electrical rough complete | NICK | NICK | | BIN | P | 5093240 |
GREGOIRE HOMES, INC. | BSP | T | 11/30/2015 | PAID (REC#1301556) ADDITIONAL PLAN REVIEW TIME: $50 From: RUSSELL | RUSSELL | RUSSELL | | BSP | T | 5088701 |
GREGOIRE HOMES, INC. | BIN | P | 11/16/2015 | still remaining upper level walls and 2 ceilings for inspection / main level complete. | NATHAN | NATHAN | | BIN | P | 5079925 |
GREGOIRE HOMES, INC. | BIN | P | 11/13/2015 | Fire stop main level OK / Missing insulation in library exterior wall and front entry exterior wall, all other insulation on main level OK | NICK | NICK | | BIN | P | 5079503 |
GREGOIRE HOMES, INC. | BSP | T | 11/02/2015 | PAID (REC#1296829) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: added MAU and kitchen range hood | JUSTINC | JUSTINC | | BSP | T | 5070382 |
GREGOIRE HOMES, INC. | BLA | C | 10/26/2015 | remaining lath okay | BRIANB | BRIANB | | BLA | C | 5065822 |
GREGOIRE HOMES, INC. | BFR | P | 10/20/2015 | engineering letters of observation of reinforcing for floor slabs, stl column attachments, welding, structural connections, and framing modifications received | BRIANB | BRIANB | | BFR | P | 5061061 |
GREGOIRE HOMES, INC. | BIN | P | 10/19/2015 | PARTIAL INSULATION INSP. / garage walls and ceiling okay / pending other rough insp. | BRIANB | BRIANB | | BIN | P | 5060949 |
GREGOIRE HOMES, INC. | BLA | P | 10/14/2015 | PARTIAL LATH / ground level walls at garage, rear arches, and outdoor living area okay / still need upper outdoor living area inspected | BRIANB | BRIANB | | BLA | P | 5057494 |
GREGOIRE HOMES, INC. | BSP | T | 10/07/2015 | PAID (REC#1292052) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise trusses | MICHAELA | MICHAELA | | BSP | T | 5052818 |
GREGOIRE HOMES, INC. | BIN | P | 09/24/2015 | partial insulation inspection - basement only / missing insulation at exterior walls in wine room, garage and storage room / all other areas in basement okay / pending other rough inspections | BRIANB | BRIANB | | BIN | P | 5043881 |
GREGOIRE HOMES, INC. | BLA | P | 09/24/2015 | lower rear walls okay / still need arches at rear covered patio and outdoor living area | BRIANB | BRIANB | | BLA | P | 5043880 |
GREGOIRE HOMES, INC. | BSP | P | 09/03/2015 | engineering letters for W12x22 steel beam added over front entry and for 14" LVL added under the steel beam at the fireplace in the west study received | BRIANB | BRIANB | | BSP | P | 5029551 |
GREGOIRE HOMES, INC. | BFR | P | 08/27/2015 | Main floor framing inspection - need engineering letters for W12x22 steel beam added over front entry and for 14" LVL added under the steel beam at the fireplace in the west stud / still need revised truss design to match trusses installed / MAIN FLOOR AND UPPER FLOOR FRAME OKAY / pending all other rough inspections | BRIANB | BRIANB | | BFR | P | 5024073 |
GREGOIRE HOMES, INC. | BLA | P | 08/12/2015 | main floor, 2nd floor and chimney lath okay / still need to inspect lath at outdoor living area and lower rear of home | BRIANB | BRIANB | | BLA | P | 5013481 |
GREGOIRE HOMES, INC. | BTR | C | 07/28/2015 | tile product is direct nail to deck no battens. dry-in complete | GEORGEG | GEORGEG | | BTR | C | 5002894 |
GREGOIRE HOMES, INC. | BIN | P | 07/10/2015 | foam insulation and ignition barrier insp. at roof deck okay at : mbr closets / mbr bth / his and her study / conservatory / work room / cats room / entire upper level / still need to finish other areas at trusses - roof deck main floor | BRIANB | BRIANB | | BIN | P | 4990988 |
GREGOIRE HOMES, INC. | BFR | P | 07/10/2015 | BFR Sky Loft / Sky loft framing okay / need revised truss design to match trusses installed | BRIANB | BRIANB | | BFR | P | 4990972 |
GREGOIRE HOMES, INC. | BFR | P | 07/07/2015 | Main Floor Truss inspection / trusses over main floor family - fireplace room G01 - G07 okay / trusses over main floor dinning room C01 - C02 okay / trusses over main floor rear west family room S01 - S06 okay | BRIANB | BRIANB | | BFR | P | 4988202 |
GREGOIRE HOMES, INC. | BFR | P | 06/29/2015 | basement mech room framing okay / engineer letter for framing modifications from BFR inspection dated 19Jun received / ES Report for foam insulation used received | BRIANB | BRIANB | | BFR | P | 4983091 |
GREGOIRE HOMES, INC. | BSP | R | 06/25/2015 | Cancelled at call ahead with Pete | BRIANB | BRIANB | | BSP | R | 4981053 |
GREGOIRE HOMES, INC. | BFR | P | 06/19/2015 | corrections from BFR inspection dated 6/7 okay - still need engineering letter for stair ceiling framing and truss design / sky loft trusses and framing okay / Main entry stair truss inspection - need truss design for trusses installed and engineering letter for framing modifications to beams & rafters / need engineering letter for deletion of beam in upper storage room wall under (3) 11 7/8" - pt. load not on plans / MBR closet attic roof sys. okay | BRIANB | BRIANB | | BFR | P | 4977182 |
GREGOIRE HOMES, INC. | BSP | R | 06/18/2015 | Cancelled by call with pete | BRIANB | BRIANB | | BSP | R | 4976300 |
GREGOIRE HOMES, INC. | BFR | P | 06/17/2015 | corrections from west garage BFR inspection dated 6/11 okay / LOWER LEVEL FRAME OKAY / corrections from BFR inspection dated 6/16 okay / BFR inspection top stairs, hall, upper library and attic - (2) 2x6 post at south end and hts20 / missing hts20 at all beam to post connections / need engineering letter for modifications to stair ceiling framing and trusses / need design for new trusses added at top of stairs / (3) 2x10 beams at top of stairs missing attachment to (3) ll 7/8" beam / R02 trusses and BFR at attic okay / Upper library - Q01 truss missing hts20 / Q03 truss missing h2.5 x2 | BRIANB | BRIANB | | BFR | P | 4975235 |
GREGOIRE HOMES, INC. | BFR | P | 06/16/2015 | Truss inspection: Bunk room T01 - T06 okay / Bunk and bth. rm V07 - V01 / V07 missing hts20 / V01 - V03 missing bracing / Trusses U06 - U01 / U06 missing hts20 x2 / U02 missing hts20 / U05 missing bracing / 2J61f missing attachment / trusses okay at top elevator #2 / BFR inspection for bunk room, needle point room, front storage room: needle point room 18" lvl missing hts20 at both ends and 11 7/8" lvl beam in common wall missing hts20 / 16" lvl beam in front storage room missing hts20 both ends and missing (4) 2x4 post in middle of beam | BRIANB | BRIANB | | BFR | P | 4974206 |
GREGOIRE HOMES, INC. | BFR | P | 06/11/2015 | corrections from BFR inspection dated 6/4 okay / engineering letter for east garage structural modifications received / WEST GARAGE BFR - pt. load under (2) 14" LVL at rear wall missing 2x / missing dbl BCI / A03 truss missing hanger attachment | BRIANB | BRIANB | | BFR | P | 4971881 |
GREGOIRE HOMES, INC. | BFR | P | 06/04/2015 | East garage frame inspect / W12x120 east end beam pocket removed in lieu of 4x4 stl post / missing pt. loads above W12x120 beam / missing all lags at all ledgers / need eng. letter for modification at post under stl. beam at single car | BRIANB | BRIANB | | BFR | P | 4966792 |
GREGOIRE HOMES, INC. | BFR | P | 06/02/2015 | main level floor sys. frame insp. - framing okay / need main floor framing insp in garage for lower level still / received engineering letters for structural modifications for main floor framing system, welding and bolting - more to follow | BRIANB | BRIANB | | BFR | P | 4965238 |
GREGOIRE HOMES, INC. | BSP | P | 05/19/2015 | partial truss inspection - mbr study & mbr bth trusses okay / need revised E08 and E05 truss design over mbr / conservatory bay room & conservatory hall trusses okay | BRIANB | BRIANB | | BSP | P | 4957570 |
GREGOIRE HOMES, INC. | BFR | P | 03/30/2015 | Main rear deck frame lid and posts okay / outdoor living room post to beam connections - need welding cert / east exterior wall in basement bedroom #2 metal shim post @ 8x21 beam okay | BRIANB | BRIANB | | BFR | P | 4926003 |
GREGOIRE HOMES, INC. | BSP | R | 03/27/2015 | cancelled by Pete per call | BRIANB | BRIANB | | BSP | R | 4924767 |
GREGOIRE HOMES, INC. | BSP | P | 03/25/2015 | Cancel by Pete | BERTW | BERTW | | BSP | P | 4923112 |
GREGOIRE HOMES, INC. | BSP | P | 02/06/2015 | BSP #3 west main floor insp. / point loads incomplete at west exterior wall by service door / verify pt. load over (3) lvl and steel beam bearing on header at service door / verify pt. load and double lvl to steel beam bearing at bottom of stairs / see sheet S1 of approved plans for inspection corrections also | BRIANB | BRIANB | | BSP | P | 4898431 |
GREGOIRE HOMES, INC. | BSP | P | 02/04/2015 | BSP #2 Center main floor insp. / missing (3) 2x6 at exterior w12x26 header / pt. loads incomplete above triple lvl header exterior wall / verify and re-inspect revision for wine room interior bearing pt. changes - see letter / see sheet S1 of approved plans for inspection corrections also / Corrections from BSP #1 completed, need letter for added 2x12 for pt. load at south elevator wall | BRIANB | BRIANB | | BSP | P | 4896795 |
GREGOIRE HOMES, INC. | BSP | P | 02/03/2015 | Training with Brian; main level floor system east bedroom area only items noted on approve plans sheet S1; Entech letter of observation of bolting and welding on file | DAN | DAN | | BSP | P | 4895452 |
GREGOIRE HOMES, INC. | BSP | P | 02/03/2015 | BSP #1 / partial main floor frame inspection: see sheet S1 of approved plans for inspection corrections also / 4ply micro short bearing at south elev. wall / 2x6 missing at n.e. bed exterior pt. load / hardware incomplete at eyebrow n.e. bedroom / point loads incomplete at n.e. bedroom | BRIANB | BRIANB | | BSP | P | 4895434 |
GREGOIRE HOMES, INC. | BFI | C | 09/02/2014 | received copy of eng inspection report | BLAKE | BLAKE | | BFI | C | 4807530 |
GREGOIRE HOMES, INC. | BFD | C | 09/02/2014 | received copy of eng inspection report | BLAKE | BLAKE | | BFD | C | 4807529 |
GREGOIRE HOMES, INC. | BFN | C | 09/02/2014 | received copy of soils letter, excavation and overexcavation observation, density test, fdtn design and eng inspection report/ float walls on slab a minimum of 1.5 inches/ p drain req'd useable space below grade/ 5% final grade req'd | BLAKE | BLAKE | | BFN | C | 4807527 |
GREGOIRE HOMES, INC. | BFT | C | 09/02/2014 | received copy of entech eng inspection report | BLAKE | BLAKE | | BFT | C | 4807526 |
GREGOIRE HOMES, INC. | BFN | P | 07/15/2014 | AUTHORIZED INSPECTION BY ENGINEER | REBECCA | REBECCA | REBECCA | BFN | P | 4776770 |
GREGOIRE HOMES, INC. | BFT | P | 07/15/2014 | AUTHORIZED INSPECTION BY ENGINEER | REBECCA | REBECCA | REBECCA | BFT | P | 4776769 |
WINTERS ELECTRIC, INC. | E= | C | 10/19/2016 | | BRIAN | BRIAN | | E= | C | 5322652 |
WINTERS ELECTRIC, INC. | E= | P | 10/17/2016 | REST OF HOUSE EXCEPT THE GENERATOR AND AC'S ------- | BRIAN | BRIAN | | E= | P | 5320032 |
WINTERS ELECTRIC, INC. | E= | P | 10/07/2016 | 3RD AND MAIN FLOORS--OK----------SOUTH EAST BASEMENT------------------ | BRIAN | BRIAN | | E= | P | 5313663 |
WINTERS ELECTRIC, INC. | ER | P | 11/04/2015 | UPPER LEVEL OK | TIMA | TIMA | | ER | P | 5072256 |
WINTERS ELECTRIC, INC. | ER | P | 10/20/2015 | MAIN LEVEL OK | TIMA | TIMA | | ER | P | 5061390 |
WINTERS ELECTRIC, INC. | EP | P | 10/02/2015 | NEED 2/0 MAIN BONDING JUMPER ON SERVICE CHECK NEXT INSPECTION-----2-200 AMD 2- 100 AMP SUB PANELS OK------UFER CLAMPS IRREVERSABLE---- | TIMA | TIMA | | EP | P | 5049346 |
WINTERS ELECTRIC, INC. | ES | C | 10/02/2015 | Residential Underground: 600 AMP 3/W NEW RES. | TIMA | TIMA | | ES | C | 5049341 |
WINTERS ELECTRIC, INC. | ER | P | 08/28/2015 | BASEMENT----STILL NEED MECH EQUIPMENT---HOT TUB---OTHER FLOORS | BRIAN | BRIAN | | ER | P | 5024971 |
WINTERS ELECTRIC, INC. | ER | R | 08/27/2015 | SECURITY WOULD NOT LET ME IN THE SOUTH GATE-----NOT GOING TO DRIVE 30 MIN AROUND TO MAIN GATE-------------- | BRIAN | BRIAN | | ER | R | 5023769 |
BUDCO ELECTRIC, INC. | ESL | C | 09/25/2014 | 3 floor boxes in slab ok to cover | BRET | BRET | | ESL | C | 4822826 |
TRUE NORTH MECHANICAL & DESIGN | H= | C | 10/26/2016 | REVIEWED PICTURES AND CRITERIA FOR BARBECUE.. CLEARANCES ARE TO INSTRUCTIONS. | JON | JON | | H= | C | 5327951 |
ASAP | H16 | C | 10/20/2016 | Spoke with Jon B. and Nick about combustibles around BBQ grill - have combustible materials below and behind grill in area shaded out in install instructions. Can not final out mechanical until issue is resolved. Spoke with ED from Bestway on site. THESE NOTES DID NOT SAVE FROM THE /10/14 | MARKB | MARKB | | H16 | C | 5323203 |
TRUE NORTH MECHANICAL & DESIGN | H= | P | 10/19/2016 | Need to speak with senior about combustibles around grill. Rest OK. TAB received | MARKB | MARKB | | H= | P | 5322692 |
BESTWAY PLUMBING, INC | H= | P | 10/13/2016 | Boiler vent terminations not complete. Need to finish gas regulator vent terminations outside house. Gas not hooked up to generator and does not meet clearances provided in install instructions. Need to verify fireplace damper interlocks. Need to verify kitchen hood makeup interlock. Top floor air handlers lack secondary protection. Contractor to provide Test and balance report for areas that duct and equipment does not match. Further research required on concealed regulator, ventilation air for theater and grill install | MARKB | MARKB | | H= | P | 5317911 |
TRUE NORTH MECHANICAL & DESIGN | H= | P | 10/07/2016 | install t&ps in main mech rm, install kickplate in cat rm, bbq not complete, connect all controls and provide test and balance report | DAVIDH | DAVIDH | | H= | P | 5313538 |
TRUE NORTH MECHANICAL & DESIGN | HRR | C | 12/01/2015 | Per engineer letter, Test and Balance report due at final for duct work changed from design. Plan review may require other splice on over sized equipment. | MARKB | MARKB | | HRR | C | 5088864 |
TRUE NORTH MECHANICAL & DESIGN | HRR | R | 11/24/2015 | THIRD FLOOR (top level):. By final - further research required on air handler sizing. Changed notes 11/15/15 - After discussion with Dale H. in plan review, this is an engineered system and any changes to duct or equipment need to go back through the engineer and spliced to plans | MARKB | MARKB | | HRR | R | 5086419 |
TRUE NORTH MECHANICAL & DESIGN | HRR | C | 11/24/2015 | SECOND FLOOR (main level): HRR complete | MARKB | MARKB | | HRR | C | 5086411 |
TRUE NORTH MECHANICAL & DESIGN | H16 | C | 11/19/2015 | Makeup air install OK, but may need electrical inspection before covered up. | MARKB | MARKB | | H16 | C | 5082323 |
TRUE NORTH MECHANICAL & DESIGN | HRR | R | 11/19/2015 | THIRD FLOOR (top level): Supply and return ducts from air handler towards Bonus room under sized, missing return air in bonus and needle point room. Can provide performance test by final. Return air ducting undersized for skyloft and not sealed by elevator. Need proper nail protection for dryer vent. Need equipment cert. on site for airhandlers | MARKB | MARKB | | HRR | R | 5082316 |
TRUE NORTH MECHANICAL & DESIGN | HRR | L | 11/12/2015 | Can not find approved plans on site. | MARKB | MARKB | | HRR | L | 5077580 |
BESTWAY PLUMBING, INC | H16 | C | 11/05/2015 | BUILDING CONTRACTOR WANTS TO FOAM EXTERIOR WALLS AND MAIN FLOOR CEILING, THIS IS OK WITH MECHANICAL AS LONG AS OTHER DEPARTMENTS ARE ON BOARD. | JON | JON | | H16 | C | 5073084 |
TRUE NORTH MECHANICAL & DESIGN | HRR | P | 10/14/2015 | SECOND FLOOR (main level): Still need all combustion air piping secured to all fireplaces. Need engineered makeup air system for vent hood. Other corrections made. Trip Fee Waived by Jack | MARKB | MARKB | | HRR | P | 5057575 |
BESTWAY PLUMBING, INC | HWP | P | 10/09/2015 | Garage pressure test OK. Still have porch to inspect at later time | MARKB | MARKB | | HWP | P | 5054219 |
ASAP | HRR | P | 10/09/2015 | SECOND FLOOR (main level): Extend kitchen range duct below ceil height. Kitchen range hood is 1000cfm - need engineered makeup air system. Secure all combustion air piping to all fireplaces (not just with tape). Extend master bath exhaust down below ceiling height. At final - Look for 11 RTA and full inspection on outdoor kitchen. | MARKB | MARKB | | HRR | P | 5054211 |
BESTWAY PLUMBING, INC | HWP | P | 09/09/2015 | All "HWP" test complete for all floors.. CHANGED TO PARTIAL TO FACILITATE A HWP INSPECTION FOR THE GARAGE. 10-6-15 JB | MARKB | MARKB | | HWP | P | 5032465 |
BESTWAY PLUMBING, INC | HC | C | 08/25/2015 | RELEASE METER | MARKB | MARKB | | HC | C | 5029397 |
BESTWAY PLUMBING, INC | HO | C | 08/25/2015 | Pressure test OK. Note: Underground CSST to firepit OK | MARKB | MARKB | | HO | C | 5021595 |
BESTWAY PLUMBING, INC | HO | T | 08/24/2015 | PAID (REC#1282920): NOT READY - Still installing gas line. | MARKB | MARKB | | HO | T | 5020638 |
BESTWAY PLUMBING, INC | HI | C | 07/17/2015 | All gas piping on all floors inside house complete. 4 - Pressure test OK. Note: 2 psi system. 11/4" blk/CSST - 2 boiler, 8 fireplace, Kitchen range, generator, outdoor kitchen BBQ and Firepit. TOTAL 1,910,00 btu's/hr. Still need inspections on outdoor items. AT FINAL - ALL MECH ROOMS WITH REGULATOR'S NEED VENTILATION. LOWER LEVEL REGULATOR BY FIREPLACE NEEDS ACCESS AND VENTILATION. PIPE REGULATOR 15' AWAY FROM GENERATOR | MARKB | MARKB | | HI | C | 4995703 |
BESTWAY PLUMBING, INC | H16 | C | 07/17/2015 | Will need a "HI+" inspection for outdoor kitchen and firepit. Read "HI" notes at final. | MARKB | MARKB | | H16 | C | 4995684 |
ASAP | HWP | P | 07/06/2015 | Pressure test and lines OK to exersize air handler on 1st floor. Still need HWP for 2nd and 3rd floors | MARKB | MARKB | | HWP | P | 4986816 |
ASAP | HRR | P | 07/06/2015 | FIRST FLOOR (basement): Still need "HI" inspection before 1st floor "HRR" is complete, Rest of "HRR" for 1st floor OK. | MARKB | MARKB | | HRR | P | 4986811 |
ASAP | HRR | P | 06/29/2015 | FIRST FLOOR (basement): Need all HRV- bath room vents piped down below ceiling height, need return air in theater room, HWP inspection for exercise room air handler and gas inspection. Provide performance test by final. Note: GEO thermal with backup boilers, air handlers, infloor heat and HRVs for bathrooms | MARKB | MARKB | | HRR | P | 4982722 |
BESTWAY PLUMBING, INC | H16 | C | 06/29/2015 | No further inspections to be done until fall protection is installed. Builder wants to inspect and drywall by floors because of the size of house. All inspectors need to be on board for this to happen. | MARKB | MARKB | | H16 | C | 4982711 |
BESTWAY PLUMBING, INC | HWP | P | 09/29/2014 | Pressure test OK for inflloor and GEO. OK to pour concrete. Note: No tubing in garage floors at this time | MARKB | MARKB | | HWP | P | 4824423 |
BESTWAY PLUMBING, INC | HWP | R | 09/26/2014 | All piping under slab needs to be under test. All gauges need to be 100 psi with 65psi air. Gauge on GEO has leak. | MARKB | MARKB | | HWP | R | 4823460 |
BESTWAY PLUMBING, INC | P= | C | 10/19/2016 | corrections made. | TAYLOR | TAYLOR | | P= | C | 5323028 |
BESTWAY PLUMBING, INC | P= | P | 10/13/2016 | could not access garage for steam generator and sink, still can not glue poly pipe together at left master lav, install floor drain cover and strainer at mech room, connect sink drain next to elevator, steam generator for master bath still does not meet proper clearances. | TAYLOR | TAYLOR | | P= | P | 5318279 |
BESTWAY PLUMBING, INC | P= | P | 10/07/2016 | need 1 inch air gaps at T&P drains for water heaters, install sink in garage, missing aav's at bar sink, washer upstairs, powder bath in basement, can not glue poly pipe together at left master lav and sink next to elevator in basement,need the following for steam generators ( install pan drains, need proper clearances, connect water supply lines ), rest ok, RP installed at mech room, finished basement. | TAYLOR | TAYLOR | | P= | P | 5313812 |
BESTWAY PLUMBING, INC | PTO | C | 08/03/2015 | aav at sinks in kitchen, basement powder bath, upstairs washer and east bar sink. | TAYLOR | TAYLOR | | PTO | C | 5006505 |
BESTWAY PLUMBING, INC | PTO | P | 07/31/2015 | nail protection throughout, re-grade vent for powder entry room, leak at at cast iron drain for master bath, rest ok. | TAYLOR | TAYLOR | | PTO | P | 5005615 |
BESTWAY PLUMBING, INC | PB | C | 09/18/2014 | rest of base and water service in. | DICK | DICK | | PB | C | 4818970 |
BESTWAY PLUMBING, INC | PB | P | 09/11/2014 | east side of house dwv only ok. | DICK | DICK | | PB | P | 4814208 |