CMG CORP | B= | C | 12/02/2015 | All other required Final inspections are complete. (This is a computer generated result) | BERTW | BERTW | | B= | C | 5089773 |
CMG CORP | B= | P | 09/14/2015 | . Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet. | BERTW | BERTW | | B= | P | 5035247 |
CMG CORP | BE | L | 09/14/2015 | Renewed at 9/14/2015 10:43:40 AM | BERTW | BERTW | | BE | L | 5035246 |
CMG CORP | BSP | T | 05/08/2015 | PAID (REC#1260992) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: revise floorplan | MICHAELA | MICHAELA | | BSP | T | 4951761 |
A & Z MECHANICAL, INC. | BSP | T | 05/08/2015 | PAID (REC#1260993) PLAN SPLICE FEE: $50 by: DALEH for Mechanical | DALEH | DALEH | | BSP | T | 4951706 |
CMG CORP | BSP | L | 03/25/2015 | observation reports for framing on file ok | BERTW | BERTW | | BSP | L | 4923530 |
CMG CORP | BFR | C | 03/12/2015 | framing modifications letters on file | BERTW | BERTW | | BFR | C | 4916160 |
CMG CORP | BSP | T | 03/12/2015 | PAID (REC#1250128) PLAN SPLICE FEE: $50 by: JIMA for Construction: splice : added piers | JIMA | JIMA | | BSP | T | 4916018 |
A & Z MECHANICAL, INC. | BSP | P | 03/12/2015 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical | DALEH | DALEH | | BSP | P | 4916006 |
CMG CORP | B= | P | 03/12/2015 | 1)contractor to provide engineers observation letter of roof framing and floor joist bearing @ basement ledger @ angled foundation wall (previously requested letters on file) 2)install railings @ single riser front entry area 3)stairs to S1 storage area missing handrails 4)delete restroom from plans for seperate permit -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), A & Z MECHANICAL Mechanical Final Inspection is not Completed yet, EL PASO ELECTRIC, LLC. Electrical Final Inspection is not Completed yet. | BERTW | BERTW | | B= | P | 4916152 |
CMG CORP | BFR | R | 02/09/2015 | Per super Jerry,through his boss Eric, Contractor will provide letter for all the framing and structural elements of new building and compliance to the approved plans. | DAN | DAN | | BFR | R | 4899462 |
CMG CORP | BIN | P | 02/09/2015 | Framing inspection is still not signed off. roof insulation installed is R19. Per super Jerry, an additional of roof insulation on top of deck was installed. Will need letter of compliance to meet com-check requirements. | DAN | DAN | | BIN | P | 4899455 |
CMG CORP | BFR | R | 02/04/2015 | recall; need roof truss detail to do inspection | DAN | DAN | | BFR | R | 4896757 |
CMG CORP | BSP | P | 01/23/2015 | south wall store front framing OK | DAN | DAN | | BSP | P | 4889968 |
CMG CORP | BLA | C | 12/02/2014 | | BERTW | BERTW | | BLA | C | 4863445 |
CMG CORP | BLA | P | 12/01/2014 | lath @ CMU areas are a rejection due to lath is easily pulled away from attachment nails/lath @ wood framing ok | BERTW | BERTW | | BLA | P | 4862259 |
CMG CORP | BIN | P | 11/20/2014 | tower framing X3 only inspected/need revised plan for rafter support ledger detail-ledger @ front of building where offset 6" for face stucco not on plans | BERTW | BERTW | | BIN | P | 4857627 |
CMG CORP | BSP | T | 10/24/2014 | PAID (REC#1228480) PLAN SPLICE FEE: $50 by: DOUG for Electrical: Overhead service | DOUG | DOUG | | BSP | T | 4841910 |
CMG CORP | BSP | P | 10/23/2014 | need revised design for 2 added pads @ beam supports @ west wall of existing building/pads ok to pour | BERTW | BERTW | | BSP | P | 4840616 |
CMG CORP | BBB | P | 10/20/2014 | last beam @ upper elevation ok/pending observation report for the 12" elevation done by engineer | BERTW | BERTW | | BBB | P | 4837785 |
CMG CORP | BBB | P | 10/16/2014 | spoke with supt eric 649-5128, eng will be doing bond beam inspection | BLAKE | BLAKE | | BBB | P | 4835574 |
CMG CORP | BBB | P | 10/08/2014 | 6' elevation ok | BERTW | BERTW | | BBB | P | 4830741 |
CMG CORP | BFI | C | 10/01/2014 | footing pad in upper storage area ok | BERTW | BERTW | | BFI | C | 4826466 |
CMG CORP | BFI | R | 09/30/2014 | upper storage not ready | BERTW | BERTW | | BFI | R | 4825449 |
CMG CORP | BFI | P | 09/29/2014 | R4 ok vertical/need horizontal @ slab area/still need 1 pad inspected by engineer in slab area | BERTW | BERTW | | BFI | P | 4824585 |
CMG CORP | BFD | C | 09/29/2014 | open hole and compaction results on file | BERTW | BERTW | | BFD | C | 4824582 |
CMG CORP | BFN | C | 09/29/2014 | | BERTW | BERTW | | BFN | C | 4824581 |
CMG CORP | BFT | C | 09/29/2014 | | BERTW | BERTW | | BFT | C | 4824579 |
CMG CORP | BFD | C | 09/26/2014 | ok-pending all paperwork picked up @ BFI inspection | BERTW | BERTW | | BFD | C | 4823796 |
CMG CORP | BFN | P | 09/19/2014 | ok pending all paperwork picked up @ drain inspection/ufer ok | BERTW | BERTW | | BFN | P | 4819528 |
CMG CORP | BFT | P | 09/16/2014 | soils 2000psf all interior pads ok except 1'42" pad ok to use engineer for inspection/need stamped open hole report and underdrain inspection report/check for ufer @ wall inspection | BERTW | BERTW | | BFT | P | 4816947 |
EL PASO ELECTRIC, LLC. | E= | C | 11/16/2015 | install sub panel cover | MIKEC | MIKEC | | E= | C | 5080377 |
EL PASO ELECTRIC, LLC. | E= | P | 09/09/2015 | blank plate for main panel, handle ties for sub panel, cover plate for box above sub panel, strap pvc exterior, ground lug for disconnect rtu's, box for mc whip (future hood). | BRET | BRET | | E= | P | 5032545 |
EL PASO ELECTRIC, LLC. | E= | R | 08/24/2015 | need electrician on site to open up panels. show location of gec to water terminations. have ladder set up and tied off for roof inspection. | BRET | BRET | | E= | R | 5020552 |
EL PASO ELECTRIC, LLC. | ER | P | 04/24/2015 | walls and lid for wine cooler, 3 pendant fixtures soffit outside of wine tasting room | BRET | BRET | | ER | P | 4942614 |
EL PASO ELECTRIC, LLC. | E= | P | 03/06/2015 | basement and storage room only. coolers not ready, need to install gec to water and need to inspect all panels new and existing. | BRET | BRET | | E= | P | 4912697 |
EL PASO ELECTRIC, LLC. | ER | P | 03/06/2015 | suspended ceiling only | BRET | BRET | | ER | P | 4912696 |
EL PASO ELECTRIC, LLC. | ER | P | 01/23/2015 | front outside wall | TOMC | TOMC | | ER | P | 4889607 |
EL PASO ELECTRIC, LLC. | ER | L | 01/20/2015 | LOCKED @ 4:25 PM | BRIAN | BRIAN | | ER | L | 4887942 |
EL PASO ELECTRIC, LLC. | ES | P | 10/27/2014 | Commercial Service: 400 amp service relocate contractor to schedule shutdown with csu note: made to line side of disconnect water gec not made at this time | BRET | BRET | | ES | P | 4842128 |
A & Z MECHANICAL, INC. | H= | C | 06/16/2015 | MECHANICAL FINAL OK. | NANCY | NANCY | | H= | C | 4973782 |
A & Z MECHANICAL, INC. | H= | P | 04/16/2015 | IS THERE GOING TO BE A SEPARATE PERMIT FOR THE BATHROOMS AND WINE TASTING ROOM? THESE AREAS ARE STILL ON ORIGINAL PERMIT AND COMMONLY REFERRED TO AS PHASE 2. THE MECHANICAL SPLICE ONLY SHOWS THE SMOKE DETECTION BEING DELETED, DO NOT SEE WHERE THE CEILING WAS REMOVED IN BACK AREA YET. TEST AND BALANCE REPORT RECEIVED. PLEASE TRY OUR NEW SYSTEM FOR SUBMITTING BALANCE REPORTS AS AN ATTACHMENT IN AN INSPECTION REQUEST. | NANCY | NANCY | | H= | P | 4937647 |
A & Z MECHANICAL, INC. | HRP | C | 04/01/2015 | PRESSURE TEST OK | JERRYF | JERRYF | | HRP | C | 4927719 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 03/11/2015 | GAS FINAL OK . | NANCY | NANCY | | H= | C | 4915224 |
A & Z MECHANICAL, INC. | H= | P | 03/11/2015 | PHASE ONE MECHANICAL OK EXCEPT NEED TO COMPLETE CONDENSATE DRAINS ON COOLERS. SEE HD NOTES REGARDING REVISED/APPROVED PRINTS . STILL NEED TO COMPLETE PHASE TWO . LABEL ALL EQUIPMENT ON ROOF BY PHASE TWO FINAL . | NANCY | NANCY | | H= | P | 4915214 |
A & Z MECHANICAL, INC. | HD | P | 03/02/2015 | ABOVE CEILING IN SALES AREA OK, OK TO COVER PER MECHANICAL ONLY. STOCK ROOM AND RECEIVING OK. NEED REVISED/APPROVED PRINTS BY FINAL SHOWING NO CEILING GRID IN BACK AREA AND NO SMOKE DETECTON ON RTU'S. NO WORK IN WINE TASTING OR BATHROOMS YET. | NANCY | NANCY | | HD | P | 4910099 |
A & Z MECHANICAL, INC. | HRP | P | 03/02/2015 | 250 LB TEST OK ON COOLER AND BEER CAVE. OK TO INSULATE LINES. NO WINE CELLAR, CONDENSATE OR ROOF YET. | NANCY | NANCY | | HRP | P | 4910084 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 01/08/2015 | OK FOR METER RELEASE - TOTAL CONNECTED LOAD 600000 BTU | JERRYF | JERRYF | | HC | C | 4882070 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 01/08/2015 | 10# OK - PIPING PER PLAN - PROPERLY SUPPORT 1 1/4 RISER TO SIDE OF BUILDING PROPERLY TO CODE BEFORE FINAL. VERIFY ALL CONNECTIONS AT NEW MANIFOLD AT FINAL.
| JERRYF | JERRYF | | HI | C | 4882069 |
A & Z MECHANICAL, INC. | H16 | C | 01/08/2015 | ROOF INSPECTION OK | JERRYF | JERRYF | | H16 | C | 4882068 |
A & Z MECHANICAL, INC. | HD | P | 12/03/2014 | ABOVE CEILING OK PENDING VERIFICATION OF BUILDING TYPE - NEED THE FOLLOWING FOR ALL FUTURE INSPECTIONS - SOMEONE NEEDS TO ATTACH COOLERS TO PERMIT - ROOF INSPECTION - GAS INSPECTION - ALL WORK ABOVE CEILING IN EXISTING | JERRYF | JERRYF | | HD | P | 4863988 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 08/18/2015 | | DICK | DICK | | P= | C | 5017262 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 04/08/2015 | per plan. | DICK | DICK | | PTO | C | 4932066 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 04/01/2015 | pending revised plan to show new restrooms and mop sink | JOEL | JOEL | | PTO | P | 4927620 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 03/11/2015 | Plumbing Base complete rest is future. Reopened to finish job. | JACK | JACK | | P= | P | 4915247 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 10/22/2014 | | JOEL | JOEL | | PB | C | 4839610 |