GOEBEL CONSTRUCTION, INC | B= | C | 03/09/2015 | finished basement, no deck | DALE | DALE | | B= | C | 4913796 |
GOEBEL CONSTRUCTION, INC | B= | R | 02/17/2015 | need guardrail at back deck and eng. on retaining wall over 4ft | DALE | DALE | | B= | R | 4903887 |
GOEBEL CONSTRUCTION, INC | B= | L | 02/13/2015 | left inspection noticed @ 14:07, house locked | ED | ED | | B= | L | 4902710 |
GOEBEL CONSTRUCTION, INC | BLA | C | 11/25/2014 | | DALE | DALE | | BLA | C | 4860017 |
GOEBEL CONSTRUCTION, INC | BFR | C | 11/19/2014 | | DALE | DALE | | BFR | C | 4856155 |
GOEBEL CONSTRUCTION, INC | BIN | C | 11/19/2014 | | DALE | DALE | | BIN | C | 4856154 |
GOEBEL CONSTRUCTION, INC | BFR | R | 11/10/2014 | strong back gable ends / fireblock b-vent chase / complete all other inspections | DALE | DALE | | BFR | R | 4851407 |
GOEBEL CONSTRUCTION, INC | BSP | P | 10/27/2014 | porch frames ok | DALE | DALE | | BSP | P | 4842498 |
GOEBEL CONSTRUCTION, INC | BSP | R | 10/23/2014 | porch headers coverd up before inspection / need ledger under rear porch trusses | DALE | DALE | | BSP | R | 4840684 |
GOEBEL CONSTRUCTION, INC | BSP | R | 10/21/2014 | no plans/ trip fee waived by blake | DALE | DALE | | BSP | R | 4838609 |
GOEBEL CONSTRUCTION, INC | BSP | P | 10/08/2014 | 4 piers ok | DALE | DALE | | BSP | P | 4831105 |
GOEBEL CONSTRUCTION, INC | BSP | T | 10/01/2014 | PAID (REC#1223441) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: enlarged covered porch | SHELLEY | SHELLEY | | BSP | T | 4826522 |
GOEBEL CONSTRUCTION, INC | BFD | C | 09/30/2014 | | DALE | DALE | | BFD | C | 4825710 |
GOEBEL CONSTRUCTION, INC | BFT | C | 09/30/2014 | ok per eng. | DALE | DALE | | BFT | C | 4825709 |
GOEBEL CONSTRUCTION, INC | BFN | C | 09/30/2014 | ok per eng. / all paperwork on file / float / ufer in per eng. | DALE | DALE | | BFN | C | 4825708 |
GOEBEL CONSTRUCTION, INC | BFN | P | 09/23/2014 | AUTHORIZED INSPECTION BY ENGINEER | JESSICA | JESSICA | JESSICA | BFN | P | 4821253 |
GOEBEL CONSTRUCTION, INC | BFT | P | 09/23/2014 | AUTHORIZED INSPECTION BY ENGINEER | JESSICA | JESSICA | JESSICA | BFT | P | 4821252 |
HIGH MOUNTAIN ELECTRIC INC. | E= | C | 02/10/2015 | | MATTHEW | MATTHEW | | E= | C | 4900258 |
HIGH MOUNTAIN ELECTRIC INC. | E= | R | 02/06/2015 | No power to kitchen circuit, ground upper bath switches, expose UFER, install inter-system bond terminal, line and load reversed in AC disconnect, wet bar rough only, 30A AC. | MATTHEW | MATTHEW | | E= | R | 4898278 |
HIGH MOUNTAIN ELECTRIC INC. | ER | C | 11/07/2014 | | MATTHEW | MATTHEW | | ER | C | 4850770 |
HIGH MOUNTAIN ELECTRIC INC. | ES | C | 11/06/2014 | Residential Overhead: 200 amp 3/w: new res----- meter is set; need seal | MATTHEW | MATTHEW | | ES | C | 4849959 |
HIGH MOUNTAIN ELECTRIC INC. | ER | R | 11/06/2014 | make up grounds at lights, I did not see well wiring------------- finished basement, no mcc's, 8-2nm to cooking | MATTHEW | MATTHEW | | ER | R | 4849956 |
HIGH MOUNTAIN ELECTRIC INC. | EUG | C | 10/15/2014 | service lateral from pole to home | MATTHEW | MATTHEW | | EUG | C | 4835238 |
HIGH MOUNTAIN ELECTRIC INC. | EUG | R | 10/14/2014 | service lateral conductors must be in trench for inspection only cable in trench is 10/3db tc cable. | BRET | BRET | | EUG | R | 4834245 |
MICK HEATING & SHEET METAL CO. | H= | C | 02/02/2015 | Transfer grill added above office doors. Open to whole house. Ok. | MARK | MARK | | H= | C | 4894624 |
MICK HEATING & SHEET METAL CO. | H= | P | 01/30/2015 | need transfer opening into basement office room that has solid doors and the mech. room access, louver door to mech. room, a/c installed, combustion air from house through louver door | TED | TED | | H= | P | 4893851 |
AMERICAN PRIDE PLUMBING | HI+ | C | 11/19/2014 | 10 lb test to future f/p ok. Note: Whole house was on test. | MARK | MARK | | HI+ | C | 4856252 |
MICK HEATING & SHEET METAL CO. | HC | C | 11/12/2014 | RELEASE METER | TED | TED | | HC | C | 4852238 |
MICK HEATING & SHEET METAL CO. | HRR | C | 11/12/2014 | spring damper installed | TED | TED | | HRR | C | 4852232 |
MICK HEATING & SHEET METAL CO. | HRR | P | 11/07/2014 | need motorized damper | TED | TED | | HRR | P | 4850570 |
AMERICAN PRIDE PLUMBING | HI | C | 11/04/2014 | 1 1/4'' furnace, w/h, fireplace, range. bbq | TED | TED | | HI | C | 4847979 |
MICK HEATING & SHEET METAL CO. | HRR | R | 11/03/2014 | install damper and damper access out outside air connect to return in garage wall, note: finished basement, a/c rough, outside air to return, duct design | TED | TED | | HRR | R | 4846995 |
MICK HEATING & SHEET METAL CO. | HRR | R | 10/31/2014 | not ready and no plan, reinspect all | TED | TED | | HRR | R | 4846061 |
AMERICAN PRIDE PLUMBING | P= | C | 02/09/2015 | correction made, bar sink rough only, certificate of potable water to scanning | TED | TED | | P= | C | 4899137 |
AMERICAN PRIDE PLUMBING | P= | R | 01/30/2015 | cut caps off vent outlets above roof, complete tile on master bathroom shower for test, need certificate of potable water, is basement bar sink to be completed this time?, set temp. stop on 2nd floor tub/shower valve, leak under 2nd floor lav on left side, note: finished basement | TED | TED | | P= | R | 4893836 |
AMERICAN PRIDE PLUMBING | PTO | C | 11/04/2014 | finished basement, aav at bar sink under stairs | TED | TED | | PTO | C | 4847976 |
AMERICAN PRIDE PLUMBING | PWO | C | 10/13/2014 | CORRECTIONS MADE | GABE | GABE | | PWO | C | 4833425 |
AMERICAN PRIDE PLUMBING | PWO | P | 10/10/2014 | LEAVE DITCH OPEN TO SEE CONNECTION AND DEPTH . POTABLE WATER CERT BY FINAL . | GABE | GABE | | PWO | P | 4832828 |
AMERICAN PRIDE PLUMBING | PB | C | 10/03/2014 | | TIM | TIM | | PB | C | 4828235 |