ART C KLEIN CONSTRUCTION, INC. | B= | C | 09/14/2015 | all paperwork is in / items corrected | NATHAN | NATHAN | | B= | C | 5035923 |
ART C KLEIN CONSTRUCTION, INC. | B= | P | 08/05/2015 | Temp CO: pending building and mechanical ( Expires: 9/4/2015 12:00:00 AM) | BPHILLIPS | BPHILLIPS | | B= | P | 5008464 |
ART C KLEIN CONSTRUCTION, INC. | BSP | T | 08/04/2015 | PAID (REC#1278678) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise child grab bar height | MICHAELA | MICHAELA | | BSP | T | 5007310 |
ART C KLEIN CONSTRUCTION, INC. | B= | P | 07/31/2015 | need engineer letter of structural inspections and soils / copy of letter of completed state plumbing and electric inspections / exterior marking of handicap parking / max occupancy sign at room B165/ complete sealing smoke partition /complete mechanical final inspections / need all outside agencies completed. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): COBB MECHANICAL CONTR, INC Mechanical Final Inspection is not Completed yet. | NATHAN | NATHAN | | B= | P | 5006076 |
ART C KLEIN CONSTRUCTION, INC. | BIN | C | 05/08/2015 | all insulation installed | NATHAN | NATHAN | | BIN | C | 4951847 |
ART C KLEIN CONSTRUCTION, INC. | BIN | P | 05/07/2015 | insulation at ceiling and above commons room B164 okay. | NATHAN | NATHAN | | BIN | P | 4951074 |
ART C KLEIN CONSTRUCTION, INC. | BIN | P | 04/23/2015 | exterior wall insulation at East wing from about 9.5 F-B okay | NATHAN | NATHAN | | BIN | P | 4942003 |
ART C KLEIN CONSTRUCTION, INC. | BIN | R | 04/21/2015 | canceled by Chad per email | NATHAN | NATHAN | | BIN | R | 4940108 |
ART C KLEIN CONSTRUCTION, INC. | BIN | P | 04/20/2015 | south side from 7.2 to 14 between F-J insulation at exterior okay | NATHAN | NATHAN | | BIN | P | 4939211 |
ART C KLEIN CONSTRUCTION, INC. | BIN | P | 04/06/2015 | insulation at 6.6-9.8, j-k okay | NATHAN | NATHAN | | BIN | P | 4930451 |
ART C KLEIN CONSTRUCTION, INC. | BIN | P | 03/27/2015 | insulation at A wing clearstory okay | NATHAN | NATHAN | | BIN | P | 4925315 |
ART C KLEIN CONSTRUCTION, INC. | BIN | P | 03/17/2015 | area A 1-8, A-J okay | NATHAN | NATHAN | | BIN | P | 4918832 |
ART C KLEIN CONSTRUCTION, INC. | BFR | P | 03/17/2015 | all exterior walls at B area / interior light steel stud framing from 1-7.2, A-J okay | NATHAN | NATHAN | | BFR | P | 4918831 |
ART C KLEIN CONSTRUCTION, INC. | BFR | P | 02/06/2015 | exterior walls at G-J 6.2-9.8 okay | NATHAN | NATHAN | | BFR | P | 4898495 |
ART C KLEIN CONSTRUCTION, INC. | BFR | P | 01/29/2015 | exterior walls and interior clear story walls okay at 1-6, C-H | NATHAN | NATHAN | | BFR | P | 4893468 |
ART C KLEIN CONSTRUCTION, INC. | BFI | C | 12/15/2014 | last of foundation insulation okay, entire okay | NATHAN | NATHAN | | BFI | C | 4871989 |
ART C KLEIN CONSTRUCTION, INC. | BFI | P | 12/08/2014 | insulation at 5-7.5 A-D okay / G-J at 9.8-6.2 okay | NATHAN | NATHAN | | BFI | P | 4867473 |
ART C KLEIN CONSTRUCTION, INC. | BFN | P | 12/05/2014 | ----------------------- 2 pads remain at interior -----------------remaining foundation from A-E, 7.4-9 / WALLS AT D-G, 14-15 OKAY | NATHAN | NATHAN | | BFN | P | 4866568 |
ART C KLEIN CONSTRUCTION, INC. | BFT | P | 12/03/2014 | North center screen wall footers okay. | NATHAN | NATHAN | | BFT | P | 4864380 |
ART C KLEIN CONSTRUCTION, INC. | BFN | P | 12/02/2014 | walls at D6-A7.5 / J6.5-J9.5 / CENTER 7.2-9 south of F / E-F,11-12 all okay. | NATHAN | NATHAN | | BFN | P | 4863573 |
ART C KLEIN CONSTRUCTION, INC. | BFN | P | 11/25/2014 | interior piers and pads at 9 line East to 15 okay 3 pads remain to be inspected at interior | NATHAN | NATHAN | | BFN | P | 4860760 |
ART C KLEIN CONSTRUCTION, INC. | BFI | P | 11/25/2014 | North exterior wall from 7.5 to 15 okay and South wall 9.8 from H.5 all along G_H lines to 15 okay | NATHAN | NATHAN | | BFI | P | 4860759 |
ART C KLEIN CONSTRUCTION, INC. | BFN | P | 11/24/2014 | pads and pilasters at and between grid 7-9, A-J okay | NATHAN | NATHAN | | BFN | P | 4859481 |
ART C KLEIN CONSTRUCTION, INC. | BFN | P | 11/19/2014 | exterior walls northend east wing grid 9-14 between B-D, southwest wall east wing 9.5-14 between J-G , interior wall at 4-5, E-F okay | NATHAN | NATHAN | | BFN | P | 4856867 |
ART C KLEIN CONSTRUCTION, INC. | BFI | P | 11/19/2014 | 2" rigid 30" deep NW wing perimeter from gridline 6.5 C-J west to 1 | NATHAN | NATHAN | | BFI | P | 4856866 |
ART C KLEIN CONSTRUCTION, INC. | BFN | P | 11/14/2014 | not ready okay to have engineer of record to do inspection. | NATHAN | NATHAN | | BFN | P | 4854325 |
ART C KLEIN CONSTRUCTION, INC. | BFT | P | 11/05/2014 | all exterior pads at grid lines 1-15-- A-J okay | NATHAN | NATHAN | | BFT | P | 4848566 |
ART C KLEIN CONSTRUCTION, INC. | BFT | P | 10/30/2014 | pilaster pads marked in orange on table plans between grid lines 1-4, and C-H okay , need openhole and compaction / no one at trailer left business card on computer bag. ---------- POC Chad Roeder 719-499-1984------------ | NATHAN | NATHAN | | BFT | P | 4845535 |
COBB MECHANICAL CONTRACTORS, INC. | H= | C | 09/09/2015 | BALANCE REPORT RECEIVED | JON | JON | | H= | C | 5032633 |
COBB MECHANICAL CONTRACTORS, INC. | HV | C | 07/30/2015 | WATER HEATER VENT COMPLETE. STILL NEED CORRECTED BALANCE REPORT | JON | JON | | HV | C | 5004445 |
COBB MECHANICAL CONTRACTORS, INC. | HV | P | 07/24/2015 | STILL NEED INSTALL MANUAL FOR WATER HEATER TO VERIFY WATER HEATER INSTALLATION - DRYER VENT OK - NEED REVISED TAB | JERRYF | JERRYF | | HV | P | 5000066 |
COBB MECHANICAL CONTRACTORS, INC. | H= | P | 07/22/2015 | STOPPED REVIEWING BALANCE REPORT. BATH EXHAUST IS NOT TO DESIGN, CALLED BILL VIDMAR AND LEFT VOICE MESSAGE | JON | JON | | H= | P | 4998790 |
COBB MECHANICAL CONTRACTORS, INC. | HV | P | 07/21/2015 | SEE HEAT FINAL NOTES | JON | JON | | HV | P | 4997984 |
COBB MECHANICAL CONTRACTORS, INC. | H= | P | 07/21/2015 | NEED BALANCE REPORT FOR OUTSIDE AIR AT ERV'S. NEED BALANCE REPORT FOR ALL BATH EXHAUST, MUST BE TO CODE AND AS NOTED ON PLANS. NEED DRYER DUCT CORRECTED WITH 4" ROUND DUCT AND CALLED IN FOR INSPECTION WHEN READY. ALSO NEED WATER HEATER INSTALLATION INSTRUCTIONS AND VENT INSPECTION CALLED WHEN READY. | JON | JON | | H= | P | 4997980 |
COBB MECHANICAL CONTRACTORS, INC. | HWP | C | 07/21/2015 | GEOTHERMAL PIPING TO HEAT PUMPS. | JON | JON | | HWP | C | 4997964 |
COBB MECHANICAL CONTRACTORS, INC. | HRP | R | 07/20/2015 | RECALL INSPECTION | JON | JON | | HRP | R | 4996858 |
COBB MECHANICAL CONTRACTORS, INC. | HD | P | 07/20/2015 | DRYER DUCT IN WALL CANNOT BE RECTANGULAR, MUST CONFORM TO THE 2006 IMC SECTION 504.6. ERV #3 AND #4 HAVE VERIFIED THE SMOKE DETECTORS. STILL NEED VERIFIED ON OTHER 2 UNITS. MUST HAVE SECONDARY DRAIN PROVISION FOR ALL HEAT PUMPS ABOVE CEILINGS. NEED WATER HEATER VENT INSPECTION WITH INSTRUCTIONS. NEED HRP AND HWP INSPECTION CALLED. NEED EXHAUST FOR BATH ROOMS AND OUTSIDE AIR SHOWN ON THE BALANCE REPORT. REPORT MUST BE PROVIDED AND REVIEWED BY THE HEATING A CONTRACTOR ON THE PROJECT. THIS REPORT NEEDS TO BE CORRECT WHEN SUBMITTED. MUST BE WITHIN 10% OF THE AIR VALUES STATED. | JON | JON | | HD | P | 4996853 |
COBB MECHANICAL CONTRACTORS, INC. | HD | R | 07/16/2015 | PLAN REVIEW AND INSPECTION WAS TO BE COMPLETED BY SENIOR INSPECTOR ON MONDAY 7/20 - ABOVE CEILING INSPECTION OK FROM GRID LINES 2 THROUGH 7 IN VISIBLE AREAS ROOF OK PENDING EQUIPMENT LABELS - ALL PIPING UNDER WORKING PRESSURE - ALL SA/RA - EXHAUST DUCT AND ALL WATER PIPING AND REFRIGERANT PIPING ALL READY INSULATED - CEILING TILE IS COMPLETED IN MAJORITY OF ROOMS - NEED THE FOLLOWING FOR FUTURE INSPECTIONS - REMOTE INDICATORS BELOW CEILING ON ALL SMOKE SHUTDOWN - ALL EQUIPMENT AND EXHAUST FLUE FOR WATER HEATER CLAIMED ON PERMIT - LABEL AT STOVE STATING WARMING USE ONLY - WHY WERE INSPECTIONS NOT COMPLETED IN PROCESS OF JOB???? - NEED CONSULT WITH SENIOR INSPECTOR ON ALL WORK THAT WAS COMPLETED WITH INSPECTIONS - MAY NEED TO OPEN CEILINGS TO VERIFY ALL WORK | JERRYF | JERRYF | | HD | R | 4994425 |