HOMEOWNER | B= | C | 08/28/2018 | All other required Final inspections are complete. (This is a computer generated result) | BOBF | BOBF | | B= | C | 5947697 |
HOMEOWNER | B= | P | 08/24/2018 | pending completion of elec final building okay. Additional Inspections Required (computer generated): Electrical Final Inspection is not Completed yet. | BOBF | BOBF | | B= | P | 5945738 |
HOMEOWNER | BSP | P | 02/13/2018 | no inspection performed / for permit extension purpose only | JOHN | JOHN | | BSP | P | 5764316 |
HOMEOWNER | BE | C | 08/21/2017 | | JLANE | JLANE | | BE | C | 5601311 |
HOMEOWNER | BE | P | 02/21/2017 | Homeowner still working on house, not ready for inspection | ROGER | ROGER | | BE | P | 5419315 |
HOMEOWNER | BFR | C | 03/04/2016 | eng letter for ledger on file | BOBF | BOBF | | BFR | C | 5147636 |
HOMEOWNER | BFR | P | 03/02/2016 | LETTER DID NOT UPLOAD, PLEASE LEAVE LETTER AT HOUSE AND i WILL PICK UP AT INSULATION INSPECTION | BOBF | BOBF | | BFR | P | 5146598 |
HOMEOWNER | BFR | P | 03/01/2016 | Still need Eng letter for 2 member ledger with timberlock screws -- Other items completed | DAKOTAB | DAKOTAB | | BFR | P | 5145051 |
HOMEOWNER | BFR | R | 02/19/2016 | missing laterals at Trusses E, E-1 and M-3 / 2 H 2.5 at GirderM-2 / Eng letter for 2 member ledger with timberlock screws / missing all point loads on outside walls in basement / remove float blocks / cut trimmers to float at door openings / Talked to owner about winder stair requirements / okay to insulate | BOBF | BOBF | | BFR | R | 5138607 |
HOMEOWNER | BSP | P | 01/21/2016 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: revised rescheck | SHELLEY | SHELLEY | | BSP | P | 5120835 |
HOMEOWNER | BLA | C | 10/26/2015 | | BOBF | BOBF | | BLA | C | 5065747 |
HOMEOWNER | BSP | P | 10/26/2015 | open hole on file | BOBF | BOBF | | BSP | P | 5065744 |
HOMEOWNER | BSP | P | 03/23/2015 | interior pads ok to pour | ED | ED | | BSP | P | 4921997 |
HOMEOWNER | BFD | P | 01/16/2015 | need stamped soils | DALE | DALE | | BFD | P | 4886281 |
HOMEOWNER | BFT | P | 12/29/2014 | will need interior pads | DALE | DALE | | BFT | P | 4878402 |
HOMEOWNER | BFN | C | 12/29/2014 | need soils at drain | DALE | DALE | | BFN | C | 4878400 |
HOMEOWNER | BFT | L | 12/11/2014 | will need stamped eng. design | DALE | DALE | | BFT | L | 4869681 |
HOMEOWNER | BFT | R | 12/09/2014 | need foundation design on site | DALE | DALE | | BFT | R | 4868181 |
HOMEOWNER | BFT | R | 12/02/2014 | need foundation design and soils | DALE | DALE | | BFT | R | 4862839 |
HOMEOWNER | E= | C | 08/28/2018 | | CRAIG | CRAIG | | E= | C | 5947696 |
HOMEOWNER | E= | R | 08/23/2018 | ex fan in basement bathroom not gfi it' s afci | CRAIG | CRAIG | | E= | R | 5944030 |
HOMEOWNER | E= | R | 08/08/2018 | afci protect per 2011 nec (kitchen, laundry area, bathroom and unfinished areas do not require afci protection; rest of 120v outlets in house need afci), check all afci breakers at re-inspect install inter-system bond terminal, front exterior outlet needs to be weather resistant and tamper resistant, back exterior outlets need to be weather resistant, deck outlet needs to be weather resistant, gfci outlet for garage OH door, gfci outlet on wall of master bathroom, spa requires (2) 20 amp circuits, bond spa motor and spa heater together, protect nm in mech room, remove gfci in mech room from furnace circuit, ex-fan in basement bathroom needs to be gfci protected-------------- no a/c--------------- | MATTHEW | MATTHEW | | E= | R | 5928360 |
L&W ENTERPRISE LLC | ER | C | 02/12/2016 | | CRAIG | CRAIG | | ER | C | 5133903 |
L&W ENTERPRISE LLC | ER | R | 02/04/2016 | add outlet in dining room -------- add outlet in study to left slide within 6' of middle of glass door -------- add outlet in hallway in basement ---------- no mcc 2 - 10/3 to dryer / well 6/3 al to sub panel finished basement no cen vac | CRAIG | CRAIG | | ER | R | 5128137 |
L&W ENTERPRISE LLC | ER | R | 02/03/2016 | need access to park in drive way | CRAIG | CRAIG | | ER | R | 5127323 |
L&W ENTERPRISE LLC | ES | C | 05/21/2015 | Residential Overhead: 200 amp 3/w: new res----- need meter set---------- panel on pole only: need to inspect panel in house | MATTHEW | MATTHEW | | ES | C | 4959072 |
L&W ENTERPRISE LLC | ES | R | 05/19/2015 | 225 amp breaker installed-------- service panel on pole | MATTHEW | MATTHEW | | ES | R | 4957345 |
HOMEOWNER | EUG | C | 05/15/2015 | 4/0 al with #4 equipment ground to meter on pole-------- equipment ground not required for service lateral---- is a panel being installed on pole? | MATTHEW | MATTHEW | | EUG | C | 4955806 |
HOMEOWNER | H= | C | 08/14/2018 | Mech splice on file for removal of radiant floor heat system and duct design on file for forced air | JOHN | JOHN | | H= | C | 5932900 |
ADVANTAGE HEATING AND COOLING | H= | P | 08/08/2018 | All correction made, still need equipment change letter. | JOEL | JOEL | | H= | P | 5927812 |
ADVANTAGE HEATING AND COOLING | H= | P | 09/01/2016 | Need to seal gas penetration and secure/seal back draft damper on West side. B vent lacks clearance to drywall in mechanical room, need return path in basement bedrooms, still need equipment chaned to match plan or change letter. Note: Finished basement, no door to mechanical room (Louver door ordered) no outside air, no a/c. | MARK | MARK | | H= | P | 5283306 |
ADVANTAGE HEATING AND COOLING | HC | C | 02/17/2016 | RELEASE METER | MARK | MARK | | HC | C | 5136032 |
ADVANTAGE HEATING AND COOLING | HRR | C | 02/17/2016 | Vent ok, rough ok. | MARK | MARK | | HRR | C | 5136030 |
O.M.A.G.M., INC. | HI | C | 01/08/2016 | 10 lb test is ok.
Note: F, w/h, on 1" main. | MARK | MARK | | HI | C | 5112579 |
ADVANTAGE HEATING AND COOLING | HRR | P | 01/07/2016 | Will need to inspect w/h vent at re inspection (Missing) rest ok.
| MARK | MARK | | HRR | P | 5111738 |
ADVANTAGE HEATING AND COOLING | HRR | R | 01/06/2016 | Need to seal returns in soffits(Laundry rm) and ceiling in multiple locations,(basement) seal abs running through return in basement, strap for furn vents in meh rm is not supporting vent piping, Still need equip letter or correct equipment by final.need to support vent pipes. | MARK | MARK | | HRR | R | 5110882 |
ADVANTAGE HEATING AND COOLING | HRR | T | 12/22/2015 | PAID (REC#1306944): All returns in basement are missing. Missing heat run in basement bath, need to lower framing and bath fan same location or frame around trunk. Need to complete frame around dryer vent or lower ceiling. Equip does not match. third inspection required, fees apply. Note: Fin. bsmnt, no osa no a/c. | MARK | MARK | | HRR | T | 5103767 |
ADVANTAGE HEATING AND COOLING | HRR | R | 12/18/2015 | Not ready. Need to complete sealing duct work, return headers, need prints that are large enough to read duct sizes. Bath fan on lower lvl not completed, seal ABS and heat runs that run through returns, What's up with the laundry room ceiling? Is the framing coming down or will you be framing around dryer vent and furnace vents? Equipment does not match, change letter by final. Re inspect all. Note: Fin. bsmnt, no OSA, no a/c, Note: Fin. bsmnt | MARK | MARK | | HRR | R | 5101603 |
HOMEOWNER | P= | C | 08/23/2018 | photos of corrections on file | JOHN | JOHN | | P= | C | 5944186 |
HOMEOWNER | P= | P | 08/08/2018 | Veggie sink is s-trapped, irrigation needs pvb note: finished basement 1-bath, utility sink rough only. | JOEL | JOEL | | P= | P | 5927806 |
FOOTHILL CONSTRUCTION SERVICES LLC | PTO | C | 02/08/2016 | | TIM | TIM | | PTO | C | 5130135 |
HOMEOWNER | PB | C | 04/24/2015 | | TED | TED | | PB | C | 4942533 |
HOMEOWNER | PWO | C | 03/23/2015 | need certificate of potable water by final | TED | TED | | PWO | C | 4921643 |
HOMEOWNER | XMS | P | 08/13/2018 | PLAN SPLICE: (No Fee) by: DALEH for Mechanical: switched from boiler heat to duct design | DALEH | DALEH | | XMS | P | 5931666 |