SHELLENBERGER HOMES | B= | C | 09/20/2016 | All other required Final inspections are complete. (This is a computer generated result) | ERICR | ERICR | | B= | C | 5297944 |
SHELLENBERGER HOMES | B= | P | 09/20/2016 | corrections completed. Additional Inspections Required (computer generated): External Agency Inspection UBS by CSUREVIEW is not Completed yet (Contact: 668-3524). | ERICR | ERICR | | B= | P | 5297809 |
SHELLENBERGER HOMES | B= | P | 09/16/2016 | Need to install smoke detector for front bedroom/offic ( 16" closet in room ) / Need to inter connect all smokes and CO's throughout house / Need to finish installing non absorbant material in master bath / Need tempered glass at master bath tub 5' from standing serface of tub / Need to install tip outs for all down spouts -- Schedule a new Building Final when above items are complete. | NICK | NICK | | B= | P | 5295329 |
SHELLENBERGER HOMES | BIN | C | 10/23/2015 | | DANE | DANE | | BIN | C | 5064310 |
SHELLENBERGER HOMES | BFR | C | 10/23/2015 | engineering received for new floor at stair hole and for header over fireplace / all other items from previous inspection complete | DANE | DANE | | BFR | C | 5064309 |
SHELLENBERGER HOMES | BFR | P | 09/24/2015 | OK to insulate / truss bracing OK / ML straps OK / still need backing corrected under stairs for drywall / still need engineer letter for ML header over fireplace / now need engineer letter for added floor over the north end of the stair hole / will need another electrical inspection for the added outlet in the attic for the hood vent remote fan | DANE | DANE | | BFR | P | 5043752 |
SHELLENBERGER HOMES | BLA | C | 09/21/2015 | engineer letter on file for stucco lath | DANE | DANE | | BLA | C | 5040120 |
SHELLENBERGER HOMES | BLA | R | 09/10/2015 | weep screed is set tight to concrete on all ground level concrete surfaces leaving no place for the water to go / east side of garage service door at rear of garage 1/2 way up door expanded steel needs to be stapled off. | DANE | DANE | | BLA | R | 5033591 |
SHELLENBERGER HOMES | BTR | C | 09/02/2015 | ridge battens installed | BRIANB | BRIANB | | BTR | C | 5028729 |
SHELLENBERGER HOMES | BTR | R | 08/28/2015 | missing ridge battens; need to be wrapped after installed. | DAN | DAN | | BTR | R | 5024796 |
SHELLENBERGER HOMES | BSP | P | 08/19/2015 | BW and DRS spoke with Mr. Shellenberger on the phone about the roof deck and discussed having a licensed design professional look at the deck and determine weather it is adequate to put the battens on and the nailing pattern for the batten system. | DANE | DANE | | BSP | P | 5017613 |
SHELLENBERGER HOMES | BTR | R | 08/17/2015 | roof not ready / no battens installed / need sidewall flashing / valley flashing is not complete / Call inspection in when roof is ready. Trip fee will be charged if it is not ready next time out. | DANE | DANE | | BTR | R | 5016210 |
SHELLENBERGER HOMES | BTR | R | 08/06/2015 | No inspection performed. BTR was completed on 6/22/15. Need reinspection fee paid for another BTR to be performed per Bert W. | DANE | DANE | | BTR | R | 5009223 |
B & N CONSTRUCTION, INC. | BFR | P | 06/23/2015 | need HRR / OK to insulate pending HRR / need engineer letter for ML spanning over main level fireplace / need truss bracing at T19, T21, T22, T01, T02, T03 (outer edges front and back on all of them) / need drywall backing under stairs / foam and fire stop / engineering on file for various framing changes such as window and door placement changes and triple plate on top of foundation / strap MLs in great room to walls below | DANE | DANE | | BFR | P | 4979040 |
B & N CONSTRUCTION, INC. | BTR | C | 06/22/2015 | | DANE | DANE | | BTR | C | 4977865 |
B & N CONSTRUCTION, INC. | BSP | P | 06/03/2015 | front porch posts OK / rear deck framing OK including posts / rear porch posts OK | DANE | DANE | | BSP | P | 4965718 |
B & N CONSTRUCTION, INC. | BSP | P | 04/28/2015 | front porch lid okay only - missing posts / rear porch lid okay only - posts missing ST18 strap | BRIANB | BRIANB | | BSP | P | 4944751 |
PBP CONSTRUCTION, LLC | BSP | T | 02/17/2015 | PAID (REC#1246269) PLAN SPLICE FEE: $50 by: DALEH for Mechanical | DALEH | DALEH | | BSP | T | 4903332 |
PBP CONSTRUCTION, LLC | BSP | P | 02/10/2015 | Deck piers OK | DANE | DANE | | BSP | P | 4899993 |
PBP CONSTRUCTION, LLC | BFD | C | 12/01/2014 | | JOND | JOND | | BFD | C | 4862440 |
PBP CONSTRUCTION, LLC | BFI | C | 12/01/2014 | | JOND | JOND | | BFI | C | 4862419 |
PBP CONSTRUCTION, LLC | BFN | C | 11/26/2014 | engineering letter on file for tall walls | JIMA | JIMA | | BFN | C | 4863576 |
PBP CONSTRUCTION, LLC | BFD | R | 11/26/2014 | no open hole / grout honey comb area at garage / seal plastic to wall better - many spots / cut off exposed rebar at footing near garage and seal over | JIMA | JIMA | | BFD | R | 4861639 |
PBP CONSTRUCTION, LLC | BFN | P | 11/17/2014 | pour at own risk / need engineers letter to ok n.e. corner in front and s.w. corner back wall at garage > 10-4" per plan ( 11-6" ) need open hole report at drain | JIMA | JIMA | | BFN | P | 4855025 |
PBP CONSTRUCTION, LLC | BFT | C | 11/06/2014 | | JOND | JOND | | BFT | C | 4849558 |
ALL STAR ELECTRIC, INC. | E= | C | 07/13/2016 | | BRET | BRET | | E= | C | 5244414 |
ALL STAR ELECTRIC, INC. | E= | P | 07/06/2016 | add receptacle to island nm cable behind island drawer | BRET | BRET | | E= | P | 5238823 |
ALL STAR ELECTRIC, INC. | E= | L | 07/05/2016 | | MIKEC | MIKEC | | E= | L | 5237039 |
ALL STAR ELECTRIC, INC. | E= | R | 06/30/2016 | NOT ALL CORRECTIONS MADE | MIKEC | MIKEC | | E= | R | 5235342 |
ALL STAR ELECTRIC, INC. | E= | R | 06/23/2016 | please walk thru home prior to calling inspection, gfci not resetting thru out interior and exterior other bath receptacles have no power, panel can set back to far from finished wall, install indicator lights in garage door opener and soffit receptacles, gfci all 120v receptacles in garage, arc-fault per 2014 nec only 1/3 circuits on arc-fault, ( gfci and arc-fault dish/disposal receptacles) lable all circuits in sub panel. to much to list complete re-inspect. | BRET | BRET | | E= | R | 5230149 |
ALL STAR ELECTRIC, INC. | E= | R | 06/22/2016 | home locked 2:15 | BRET | BRET | | E= | R | 5228661 |
HOMEOWNER | ER+ | C | 10/08/2015 | CEN. VAC ALSO ADDED SINCE PREVIOUS ROUGH | MIKEC | MIKEC | | ER+ | C | 5053404 |
MOUNTAIN STATES ELECTRIC | ES | C | 06/18/2015 | Residential Underground: NEW 200 AMP SERVICE | MIKEC | MIKEC | | ES | C | 4976415 |
MOUNTAIN STATES ELECTRIC | ER | C | 06/18/2015 | NO CEN. VAC | MIKEC | MIKEC | | ER | C | 4976413 |
DESIGN SYSTEMS HEATING & AC | H= | C | 07/08/2016 | 4 - SUPPLY DAMPERS HAVE BEEN INSTALLED IN THE LARGE HOLES AND SEALED. | JEFFB | JEFFB | | H= | C | 5240683 |
DESIGN SYSTEMS HEATING & AC | H= | P | 07/01/2016 | THERE ARE 4 - HOLES IN THE SUPPLY DUCTWORK IN THE FURNACE ROOM. THE A/C IS NOT COMPLETE. | JEFFB | JEFFB | | H= | P | 5236068 |
DESIGN SYSTEMS HEATING & AC | HRR | C | 08/05/2015 | Note: Provide label or tag within 6 feet of the exhaust duct connection, length of duct for dryers. | STEVEC | STEVEC | | HRR | C | 5008038 |
DESIGN SYSTEMS HEATING & AC | HC | C | 06/23/2015 | RELEASE METER | STEVEC | STEVEC | | HC | C | 4979041 |
DESIGN SYSTEMS HEATING & AC | HRR | P | 06/23/2015 | Steve C. Changed notes 6/24/15 dryer specs as a 8.1 not a 8.3 will not meet intended length of dryer duct installed. Note: duct design, equipment matches, AC rough, basement finish. | STEVEC | STEVEC | | HRR | P | 4979037 |
DESIGN SYSTEMS HEATING & AC | HRR | P | 06/22/2015 | Provide specs for dryers, vent terminations, exceeds 35' length. Remove nylon strapping from heat runs and pvc use metal strap or approved material to support weight. Basement bath fan not finished at fan connection. | STEVEC | STEVEC | | HRR | P | 4978233 |
SPRINGS GAS, INC. | HI | C | 06/16/2015 | 10# test o.k 1"1/4 main, furnace, water heater, future stub garage unit heater, future outdoor BBQ lower patio, BBQ main deck, cooktop, fireplace main. | STEVEC | STEVEC | | HI | C | 4974395 |
FAIRWAY PLUMBING & HEATING, INC. | P= | C | 07/06/2016 | corrections made. | TAYLOR | TAYLOR | | P= | C | 5237993 |
FAIRWAY PLUMBING & HEATING, INC. | P= | P | 06/29/2016 | install dishwasher to verify hi- loop, leak at lav drain in west basement bathroom, need listing for shower assembly at master, rest ok, pvb installed, finished basement. | TAYLOR | TAYLOR | | P= | P | 5233914 |
FAIRWAY PLUMBING & HEATING, INC. | PTO | C | 06/11/2015 | finished basement. | DICK | DICK | | PTO | C | 4971795 |
FAIRWAY PLUMBING & HEATING, INC. | PB | C | 12/12/2014 | | LEE | LEE | | PB | C | 4870789 |