WELLS & WEST GENERAL CONTRACTORS, INC. | B= | C | 02/24/2015 | All other required Final inspections are complete. (This is a computer generated result) | BERTW | BERTW | | B= | C | 4907108 |
WELLS & WEST GENERAL CONTRACTORS, INC. | B= | P | 01/28/2015 | Additional Inspections Required. | BERTW | BERTW | | B= | P | 4892168 |
WELLS & WEST GENERAL CONTRACTORS, INC. | B= | R | 01/28/2015 | Additional Inspections Required: PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet (This is a computer generated result) | SYSTEM | SYSTEM | | B= | R | 4892169 |
WELLS & WEST GENERAL CONTRACTORS, INC. | BSP | P | 01/12/2015 | restroom lids ok/pending other roughs completed | BERTW | BERTW | | BSP | P | 4883948 |
WELLS & WEST GENERAL CONTRACTORS, INC. | BFR | C | 12/31/2014 | | BERTW | BERTW | | BFR | C | 4879308 |
WELLS & WEST GENERAL CONTRACTORS, INC. | BFR | P | 12/12/2014 | pending other rough bathroom lid framing is ok | BERTW | BERTW | | BFR | P | 4870443 |
WELLS & WEST GENERAL CONTRACTORS, INC. | BFR | P | 11/19/2014 | walls ok pending other roughs completed | BERTW | BERTW | | BFR | P | 4856553 |
COLORADO ELECTRICAL INSTALLATION | E= | C | 01/23/2015 | | BRIAN | BRIAN | | E= | C | 4889870 |
COLORADO ELECTRICAL INSTALLATION | ER | P | 01/09/2015 | bathroom closest to lawyers office--hard lid OK | SHELBY | SHELBY | | ER | P | 4882940 |
COLORADO ELECTRICAL INSTALLATION | ER | C | 01/05/2015 | suspended ceilings ok still lacking access to j-boxes in hallway | BRET | BRET | | ER | C | 4880132 |
COLORADO ELECTRICAL INSTALLATION | ER | P | 12/30/2014 | hallway hard lid need access to 3-j-boxes, plug unused opening in north box | BRET | BRET | | ER | P | 4878703 |
COLORADO ELECTRICAL INSTALLATION | ER | P | 12/11/2014 | men bath hard lid install 24x24 access panel at 2 locations for j-box access. | BRET | BRET | | ER | P | 4869684 |
COLORADO ELECTRICAL INSTALLATION | ER | P | 11/18/2014 | new walls only | BRET | BRET | | ER | P | 4855493 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 02/24/2015 | TEST AND BALANCE REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 4907107 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 02/20/2015 | NEED BALANCE REPORT EMAILED TO THIS INSPECTOR. | JON | JON | | H= | P | 4905894 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 01/27/2015 | PARTIAL PENDING TAB REPORT | JERRYF | JERRYF | | H= | P | 4891315 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | C | 12/24/2014 | OK TO CONCEAL PENDING OTHER INSPECTIONS | JERRYF | JERRYF | | HD | C | 4877530 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 12/18/2014 | ALL ABOVE CEILING OK | JERRYF | JERRYF | | HD | P | 4874466 |
CONTRACT MECHANICAL SVC INC | H= | C | 12/18/2014 | OK | JERRYF | JERRYF | | H= | C | 4874462 |
CONTRACT MECHANICAL SVC INC | HC | C | 12/09/2014 | RELEASE METER | JERRYF | JERRYF | | HC | C | 4867713 |
CONTRACT MECHANICAL SVC INC | HI | C | 12/09/2014 | 10# OK. PIPING PER PLAN | JERRYF | JERRYF | | HI | C | 4867712 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 12/08/2014 | STILL NEED THE FOLLOWING - SUITE 102 DUCT INSPECTION - ROOF INSPECTION OK - REST ABOVE CEILING AND HARD LIDS OK | JERRYF | JERRYF | | HD | P | 4867115 |