GOEBEL CONSTRUCTION, INC | B= | C | 05/14/2018 | | BOBF | BOBF | | B= | C | 5844548 |
GOEBEL CONSTRUCTION, INC | B= | P | 04/10/2018 | complete gutter at east side / address # change? to 14495 holmes rd? -- Schedule a new Building Final when above items are complete. | DALE | DALE | | B= | P | 5813214 |
GOEBEL CONSTRUCTION, INC | BIN | C | 10/19/2017 | | BOBF | BOBF | | BIN | C | 5661434 |
GOEBEL CONSTRUCTION, INC | BFR | C | 10/17/2017 | | DAKOTAB | DAKOTAB | | BFR | C | 5657755 |
GOEBEL CONSTRUCTION, INC | BIN | P | 06/30/2017 | Insulation in attic OK -- Still need to complete BFR | DAKOTAB | DAKOTAB | | BIN | P | 5552306 |
GOEBEL CONSTRUCTION, INC | BIN | R | 06/29/2017 | Could not locate address - No address posted at Street | JUSTINL | JUSTINL | | BIN | R | 5550861 |
GOEBEL CONSTRUCTION, INC | BSP | P | 10/21/2016 | Need to post address at street and on building -- Exterior wall framing and bracing OK -- Front and rear porch post and lid OK | DAKOTAB | DAKOTAB | | BSP | P | 5325060 |
GOEBEL CONSTRUCTION, INC | BE | L | 10/19/2016 | Renewed for 1/2 Fee at 10/19/2016 10:46:15 AM (Receipt#1373664) | JANE | JANE | | BE | L | 5322230 |
GOEBEL CONSTRUCTION, INC | BFI | C | 07/21/2015 | | DALE | DALE | | BFI | C | 4997536 |
GOEBEL CONSTRUCTION, INC | BFT | C | 07/21/2015 | ok per eng. | DALE | DALE | | BFT | C | 4997535 |
GOEBEL CONSTRUCTION, INC | BFN | C | 07/21/2015 | ok per eng. / all paperwork on file | DALE | DALE | | BFN | C | 4997519 |
GOEBEL CONSTRUCTION, INC | BE | L | 07/20/2015 | Renewed at 7/20/2015 12:17:38 PM | RITA | RITA | | BE | L | 4996502 |
GOEBEL CONSTRUCTION, INC | BFN | P | 11/10/2014 | AUTHORIZED INSPECTION BY ENGINEER | RITA | RITA | RITA | BFN | P | 4851140 |
GOEBEL CONSTRUCTION, INC | BFT | P | 11/10/2014 | AUTHORIZED INSPECTION BY ENGINEER | RITA | RITA | RITA | BFT | P | 4851139 |
HOMEOWNER | E= | C | 04/06/2018 | corrections made | CRAIG | CRAIG | | E= | C | 5810724 |
HOMEOWNER | E= | R | 03/30/2018 | afci per 2014 --------- gfi plug 6' from laundry sink --------- south bedroom no power to one plug by switch --------- any question please call ---------- install boxes for exterior lights | CRAIG | CRAIG | | E= | R | 5804546 |
HOMEOWNER | ES | C | 03/30/2018 | Residential Underground: 200 - amp 3 Wire new service no action needed | CRAIG | CRAIG | | ES | C | 5804545 |
HOMEOWNER | ER | C | 10/16/2017 | | CRAIG | CRAIG | | ER | C | 5657109 |
HOMEOWNER | ER | R | 10/11/2017 | install smokes --------------- Discussed AFCI/GFCI/TR requirements with owner. / No Cent Vac / Irreversible UFER connection / every think is ran in MC cables | CRAIG | CRAIG | | ER | R | 5651600 |
AMERICAN PRIDE PLUMBING | H= | C | 03/21/2018 | HOMEOWNER HAD ISSUE UPLOADING IMAGES TO WEB SITE. THEY EMAILED TO ME CORRECTIONS MADE TO LAUNDRY ROOM | BENH | BENH | | H= | C | 5794535 |
AMERICAN PRIDE PLUMBING | H= | P | 03/14/2018 | LAUNDRY ROOM LACKS MAKE UP AIR, ATTACH PICTURES TO PERMIT OF CORRECTIONS MADE NOTES: DIRECT VENT BOILER | BENH | BENH | | H= | P | 5789104 |
COLORADO SPRINGS HEATING & COOLING SOLUTIONS, LLC | HC | C | 01/25/2017 | RELEASE METER | MARK | MARK | | HC | C | 5398045 |
COLORADO SPRINGS HEATING & COOLING SOLUTIONS, LLC | HRR | C | 01/25/2017 | Rough ok. Note: HWP with boiler and side arm, 2- bath fans, check dryer vent at final. | MARK | MARK | | HRR | C | 5398044 |
AMERICAN PRIDE PLUMBING | HI | C | 12/19/2016 | 10 lb test ok. Note: 1 1/4" main. Boiler, future stub in mechanical room, future bbq and range. | MARK | MARK | | HI | C | 5371271 |
AMERICAN PRIDE PLUMBING | HWP | C | 10/13/2015 | 60# test ok. Under slab only hot water heat in structure. OK to pour. | MICHAELS | MICHAELS | | HWP | C | 5056102 |
AMERICAN PRIDE PLUMBING | P= | C | 03/16/2018 | potable water certification sent to scanning notes amended 3/22/18 | JOSEPHD | JOSEPHD | | P= | C | 5791128 |
AMERICAN PRIDE PLUMBING | P= | P | 03/14/2018 | Cap bar sink drain, T&P run off tube needs to be 1 - 6" AFF, support expansion tank, rest OK, bar sink rough-in only | SHANEN | SHANEN | | P= | P | 5788319 |
AMERICAN PRIDE PLUMBING | PTO | C | 11/22/2016 | NOTE : SLAB ON GRADE , AAV AT BATH LAVS , LAUNDRY AND BAR VTR , NO IRRIGATION , TEMPERING IN MEC AT FINAL | GABE | GABE | | PTO | C | 5351819 |
HOMEOWNER | PWO | C | 11/06/2015 | DEPTH VERIFIED , PWO COMPLETE | GABE | GABE | | PWO | C | 5074035 |
HOMEOWNER | PWO | P | 10/19/2015 | DEPTH NOT MET AT FOUNDATION , REST OK | GABE | GABE | | PWO | P | 5060756 |
AMERICAN PRIDE PLUMBING | PTO | P | 10/09/2015 | WATER UNDER SLAB ON TEST OK TO COVER , MAIN IN | GABE | GABE | | PTO | P | 5054487 |
AMERICAN PRIDE PLUMBING | PWO | P | 10/09/2015 | MAIN IN , STUBBED UNDER FOOTER , NEED TO SEE TIE IN AT WELL | GABE | GABE | | PWO | P | 5053873 |
AMERICAN PRIDE PLUMBING | PTO | P | 10/08/2015 | WATER UNDER SLAB OK , STILL NEED TO RUN H2O TO BATH ROOM GROUPS , | GABE | GABE | | PTO | P | 5053619 |
AMERICAN PRIDE PLUMBING | PB | C | 10/08/2015 | DWV ON TEST | GABE | GABE | | PB | C | 5053618 |