BISON BUILDERS & ASSOCIATES, INC. | B= | C | 09/30/2015 | | BOBF | BOBF | | B= | C | 5048062 |
BISON BUILDERS & ASSOCIATES, INC. | B= | R | 09/28/2015 | return handrail to post | DALE | DALE | | B= | R | 5045666 |
BISON BUILDERS & ASSOCIATES, INC. | B= | R | 09/25/2015 | nail off all joist hangars on both decks / handrail in basement needs to terminate to a newel or wall | BOBF | BOBF | | B= | R | 5044795 |
BISON BUILDERS & ASSOCIATES, INC. | BSP | P | 07/23/2015 | 6 deck piers okay | BOBF | BOBF | | BSP | P | 4999941 |
BISON BUILDERS & ASSOCIATES, INC. | BSP | T | 07/01/2015 | PAID (REC#1271741) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: enlarge deck | MICHAELA | MICHAELA | | BSP | T | 4984938 |
BISON BUILDERS & ASSOCIATES, INC. | BFR | C | 05/29/2015 | | DALE | DALE | | BFR | C | 4963252 |
BISON BUILDERS & ASSOCIATES, INC. | BIN | C | 05/29/2015 | | DALE | DALE | | BIN | C | 4963247 |
BISON BUILDERS & ASSOCIATES, INC. | BFR | R | 05/27/2015 | need correct truss calcs / 2 t at mater bath header / overbored top plates on plates on plumbing / 3 ply header at basement / ok to insulate | DALE | DALE | | BFR | R | 4961493 |
BISON BUILDERS & ASSOCIATES, INC. | BLA | C | 05/27/2015 | | DALE | DALE | | BLA | C | 4961486 |
BISON BUILDERS & ASSOCIATES, INC. | BSP | T | 05/21/2015 | PAID (REC#1263243) ADDITIONAL PLAN REVIEW TIME: $50 From: RUSSELL | RUSSELL | RUSSELL | | BSP | T | 4958767 |
BISON BUILDERS & ASSOCIATES, INC. | BFD | C | 01/20/2015 | | DALE | DALE | | BFD | C | 4887440 |
BISON BUILDERS & ASSOCIATES, INC. | BFI | C | 01/20/2015 | | DALE | DALE | | BFI | C | 4887434 |
BISON BUILDERS & ASSOCIATES, INC. | BFN | C | 01/05/2015 | all paperwork on file / float / ufer in / drain usable | DALE | DALE | | BFN | C | 4880196 |
BISON BUILDERS & ASSOCIATES, INC. | BFT | C | 12/16/2014 | including interior pads | DALE | DALE | | BFT | C | 4872700 |
ALTHOUSE ELECTRIC, INC. | E= | C | 08/26/2015 | | MATTHEW | MATTHEW | | E= | C | 5022871 |
ALTHOUSE ELECTRIC, INC. | E= | R | 08/21/2015 | island counter top not installed --------------- garage outlets covered up for painting ------------ a/c pre wire | CRAIG | CRAIG | | E= | R | 5019994 |
ALTHOUSE ELECTRIC, INC. | ES | C | 06/04/2015 | Residential Underground: 200 amp 3/w new res seal meter | CRAIG | CRAIG | | ES | C | 4966440 |
ALTHOUSE ELECTRIC, INC. | EUG | C | 06/03/2015 | 3/w 4/0 al service lateral | CRAIG | CRAIG | | EUG | C | 4966138 |
ALTHOUSE ELECTRIC, INC. | ES | P | 06/03/2015 | Residential Underground: pre release only | CRAIG | CRAIG | | ES | P | 4965561 |
ALTHOUSE ELECTRIC, INC. | ER | C | 05/26/2015 | 1 - 20 2 - 10/3 2 - 10/2 8/3 cu to oven 4/w # 2 al to unfinished basement sub panel ------ no mcc un sub panel no cen vac | CRAIG | CRAIG | | ER | C | 4960973 |
BROWN'S HEATING & COOLING, INC | H= | C | 09/16/2015 | CORRECTIONS COMPLETE. NOTE: VENTED ATTIC, A/C ROUGH ONLY LINE SET AND COIL.. DUCT LEAKAGE TO SCANNING. | LUKE | LUKE | | H= | C | 5037472 |
BROWN'S HEATING & COOLING, INC | H= | P | 09/15/2015 | NEED A 8 FOOT STEP LADDER SET UP AT ATTIC ACCESS, NEED DUCT LEAKAGE TEST ON SITE AT FURNACE. | CHUCKF | CHUCKF | | H= | P | 5036178 |
BROWN'S HEATING & COOLING, INC | H= | R | 09/11/2015 | NO CORRECTIONS ATTEMPTED. | LUKE | LUKE | | H= | R | 5034309 |
BROWN'S HEATING & COOLING, INC | H= | P | 09/03/2015 | NEED TO REMOVE VINYL FROM BEHIND B-VENT IN BASEMENT.NEED LADDER FOR ATTIC ACCESS FOR NEXT INSPECTION, NEED DUCT LEAKAGE FOR NEXT INSPECTION. REST GOOD. NOTE: UNFINISHED BASEMENT, NO A/C, 6'' OUTSIDE TO RETURN, NO MANTEL, A/C ROUGH ONLY. | LUKE | LUKE | | H= | P | 5029862 |
J & J MECHANICAL, INC | HO | C | 06/03/2015 | 10lb test on old and new 2'' p.e. piping from meter at road to 2'' house main, (piping sized for meter at road) | TED | TED | | HO | C | 4965730 |
BROWN'S HEATING & COOLING, INC | HC | C | 05/22/2015 | RELEASE METER | MARK | MARK | | HC | C | 4959592 |
BROWN'S HEATING & COOLING, INC | HRR | C | 05/22/2015 | Rough ok. Note: Added splice and OSA to attic unit. Will still need a duct leak report for attic unit by final. | MARK | MARK | | HRR | C | 4959499 |
BROWN'S HEATING & COOLING, INC | HRR | R | 05/15/2015 | design plan calls for 90% furnace in attic, 80% installed, need correct model installed or an equipment schedule splice to master plan, could not find outside air to return on attic furnace, need duct leakage report on attic furnace system, main level and basement system ok, note: unfinished basement, outside air to basement furnace, no a/c basement furnace, a/c rough attic furnace | TED | TED | | HRR | R | 4955659 |
J & J MECHANICAL, INC | HI | C | 05/15/2015 | Test is ok.
| MARK | MARK | | HI | C | 4955060 |
J & J MECHANICAL, INC | HI | P | 05/14/2015 | 10 lb test ok. Note: 2" main. 2- furn, 2- w/h, cook top, fut f/p upstairs? Where will meter be located? | MARK | MARK | | HI | P | 4954494 |
BROWN'S HEATING & COOLING, INC | HRR | L | 05/14/2015 | No mechanical prints on site. the 2 approved locations for plans are on the equipment or in the permit pouch. No trip. | MARK | MARK | | HRR | L | 4954472 |
JOLLY PLUMBING & HEATING INC. | P= | C | 09/14/2015 | no sprinkler stub | TIM | TIM | | P= | C | 5035446 |
JOLLY PLUMBING & HEATING INC. | P= | P | 09/11/2015 | certificate of potable water to scanning | TED | TED | | P= | P | 5033985 |
JOLLY PLUMBING & HEATING INC. | PWO | C | 05/14/2015 | need certificate of potable water by final | TED | TED | | PWO | C | 4954700 |
JOLLY PLUMBING & HEATING INC. | PTO | C | 05/14/2015 | unfinished basement | TED | TED | | PTO | C | 4954697 |
JOLLY PLUMBING & HEATING INC. | PB | C | 01/30/2015 | no water piping under slab | TED | TED | | PB | C | 4893743 |