BUILTRITE BUILDERS | B= | C | 09/25/2015 | items from previous inspection complete | DANE | DANE | | B= | C | 5044555 |
BUILTRITE BUILDERS | B= | P | 09/24/2015 | deck stairs graspable rail is too low - need 34" to 38" / stair rised very more than 3/8" and top rise is over 7 3/4" / need to fine grade - open hole calls 10% slope / need to insulate attic / need air barrier on insulation in mech room on foundation / bottom rise on stairs to upper floor is greater than 7 3/4" and more than 3/8" different -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2). | DANE | DANE | | B= | P | 5043835 |
BUILTRITE BUILDERS | BLA | C | 08/17/2015 | | DANE | DANE | | BLA | C | 5016140 |
BUILTRITE BUILDERS | BIN | C | 07/14/2015 | | DANE | DANE | | BIN | C | 4992657 |
BUILTRITE BUILDERS | BFR | C | 07/14/2015 | engineer inspection letter for perimeter drain on file | DANE | DANE | | BFR | C | 4992605 |
BUILTRITE BUILDERS | BFR | P | 07/09/2015 | OK to insulate / new truss repair on file / Engineering on file for post at main level stairs for upper floor | DANE | DANE | | BFR | P | 4989733 |
BUILTRITE BUILDERS | BFR | R | 07/06/2015 | still need anchor bolt next to the garage service door / truss repair does not match that is done and does not address cut for ML on south end of truss / need engineer letter for 4 2x6 posts under AG2 and AG3 or install a 4x4 steel post per plan / still missing 2 2x4 post under 2x12 at upper floor by stairs or need engineering / still need engineer letter for backfill over snow at drain / do not insulate | DANE | DANE | | BFR | R | 4986665 |
BUILTRITE BUILDERS | BFR | T | 06/15/2015 | PAID (REC#1271823): need anchor bolts within 12" of plate breaks in garage / strap top plate break at south wall in garage / plan calls 3" sds screws 16" OC at 2x8 joists in both bays at main level / plan calls 4 2x6 post under dbl LVL at north wall in master / missing 3 2x4 post under 2 2x12 beam at main level stairs / need truss engineering for cut bottom cord in 2 places on B3 truss / plan calls 2 HTS20 each end CG1 / plan calls 4x4 steel post under west ends of AG2 and AG3 / glue shims under steel beam in beam pocket / replace wood shim with steel shims in beam pocket / need engineering for cut LVL and 4 LS30 at LVL over end of stairs in basement / attach steel posts to LVL under basement stairs / Engineering on file for floor engineering over basement stairs / still need engineer letter for backfill on top of snow for drain inspection | DANE | DANE | | BFR | T | 4973406 |
BUILTRITE BUILDERS | BSP | P | 05/06/2015 | front and rear porch lid and posts okay / need engineering letter for drain inspection by or at frame insp. - see comments from drain inspection | BRIANB | BRIANB | | BSP | P | 4949744 |
BUILTRITE BUILDERS | BFD | P | 01/22/2015 | will need engineer to sign off on backfill on top of snow in excavation | DANE | DANE | | BFD | P | 4888870 |
BUILTRITE BUILDERS | BFD | R | 01/21/2015 | remove snow | DANE | DANE | | BFD | R | 4888357 |
BUILTRITE BUILDERS | BFN | C | 01/21/2015 | Engineer inspection letter on file/2400lbs/usable drain/10% grade/eufer noted | DANE | DANE | | BFN | C | 4888353 |
BUILTRITE BUILDERS | BFT | C | 01/21/2015 | engineer inspection letter on file | DANE | DANE | | BFT | C | 4888351 |
BUILTRITE BUILDERS | BFN | P | 11/26/2014 | AUTHORIZED INSPECTION BY ENGINEER | BPHILLIPS | BPHILLIPS | BPHILLIPS | BFN | P | 4861377 |
BUILTRITE BUILDERS | BFT | P | 11/26/2014 | AUTHORIZED INSPECTION BY ENGINEER | BPHILLIPS | BPHILLIPS | BPHILLIPS | BFT | P | 4861376 |
POSITIVE ELECTRIC, LLC | E= | C | 09/23/2015 | 40 AMP A.C | MIKEC | MIKEC | | E= | C | 5042964 |
POSITIVE ELECTRIC, LLC | ER | C | 06/09/2015 | NO CEN. VAC | MIKEC | MIKEC | | ER | C | 4969658 |
POSITIVE ELECTRIC, LLC | ER | R | 06/05/2015 | LOWER FIREPLACE NOT INSTALLED OR WIRED | MIKEC | MIKEC | | ER | R | 4968198 |
POSITIVE ELECTRIC, LLC | ER | T | 06/04/2015 | PAID (REC#1265994): CORRECTIONS NOT MADE | MIKEC | MIKEC | | ER | T | 4967076 |
POSITIVE ELECTRIC, LLC | ER | R | 06/03/2015 | BACK TO BACK BOXES.LOWER FIREPLACE MISSING | MIKEC | MIKEC | | ER | R | 4966290 |
POSITIVE ELECTRIC, LLC | ES | C | 06/03/2015 | Residential Underground: NEW 200 AMP SERVICE | MIKEC | MIKEC | | ES | C | 4966286 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 09/23/2015 | Corrections made. | STEVEC | STEVEC | | H= | C | 5042718 |
WESTERN FIREPLACE SUPPLY, INC. | HRR+ | C | 09/23/2015 | | STEVEC | STEVEC | | HRR+ | C | 5042713 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | P | 09/22/2015 | Top of condenser lacks clearance under deck, line-set blocking proper access to service panel, b-vent missing storm collar, someone needs to claim fireplace that was added after HRR inspection. Note: rest o.k. | STEVEC | STEVEC | | H= | P | 5041518 |
CORNERSTONE PLUMBING INC | HI+ | P | 06/23/2015 | Pending HRR+ needed to complete this inspection, see prior notes. Contact contractor that installed fireplace to add this inspection to permit. | STEVEC | STEVEC | | HI+ | P | 4978998 |
CORNERSTONE PLUMBING INC | HI+ | P | 06/12/2015 | 10# test o.k. added 21k to load. Need to protect csst. Fireplace added to basement, installed after the HRR inspection, HRR+ is needed to complete this inspection. | STEVEC | STEVEC | | HI+ | P | 4972760 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 06/05/2015 | RELEASE METER | STEVEC | STEVEC | | HC | C | 4967660 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 06/05/2015 | Corrections made. Note: equipment matches, duct design, AC prep, outside air to return, basement finish, check for collar and cap at b-vent at final. | STEVEC | STEVEC | | HRR | C | 4967658 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | P | 06/04/2015 | Heat runs in cantilever lack screws, support dryer basement/strap, nail protection needed at main floor dryer, seal RA pipe in chase at floor, seal RA main has gap, b-vent cap and collar missing at roof, re-inspect all. | STEVEC | STEVEC | | HRR | P | 4966884 |
CORNERSTONE PLUMBING INC | HI | C | 05/18/2015 | | STEVEC | STEVEC | | HI | C | 4955979 |
CORNERSTONE PLUMBING INC | HI | P | 05/05/2015 | 10# test o.k. Note: 1"1/4 main, furnace, water heater, fireplace, range, total load 228k | STEVEC | STEVEC | | HI | P | 4949443 |
CORNERSTONE PLUMBING INC | P= | C | 09/22/2015 | finished basement, 3/4'' pvb installed | TED | TED | | P= | C | 5041524 |
CORNERSTONE PLUMBING INC | PTO | C | 05/04/2015 | finished basement | DICK | DICK | | PTO | C | 4948475 |
CORNERSTONE PLUMBING INC | PB | C | 02/02/2015 | | GABE | GABE | | PB | C | 4895172 |