CMG CORP | B= | C | 04/06/2015 | All other required Final inspections are complete. (This is a computer generated result) | DAN | DAN | | B= | C | 4930024 |
RIAL HEATING AND AIR CONDITIONING, INC. | BSP | T | 02/10/2015 | PAID (REC#1245379) PLAN SPLICE FEE: $50 by: DALEH for Mechanical | DALEH | DALEH | | BSP | T | 4900381 |
CMG CORP | B= | P | 01/22/2015 | Additional Inspections Required. building final OK pending other finals completed | DAN | DAN | | B= | P | 4888921 |
CMG CORP | B= | R | 01/22/2015 | Additional Inspections Required: External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), LANDMARK PLUMBING & HEATING, INC. Mechanical Final Inspection is not Completed yet, LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet (This is a computer generated result) | SYSTEM | SYSTEM | | B= | R | 4888922 |
CMG CORP | BFR | P | 12/18/2014 | interior walls and sound wall ok, pending all other roughs being signed off | JOND | JOND | | BFR | P | 4874218 |
EL PASO ELECTRIC, LLC. | E= | C | 01/16/2015 | | MIKEC | MIKEC | | E= | C | 4886244 |
EL PASO ELECTRIC, LLC. | ES | C | 01/13/2015 | Commercial Service: 200 AMP 3PH 480V NEED METER SET | MIKEC | MIKEC | | ES | C | 4884551 |
EL PASO ELECTRIC, LLC. | ER | P | 12/18/2014 | WALLS | MIKEC | MIKEC | | ER | P | 4874084 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 04/06/2015 | GAS FINAL OK. | NANCY | NANCY | | H= | C | 4930023 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 03/03/2015 | SEAL AROUND GAS LINES WHERE THEY ENTER BUILDING. | NANCY | NANCY | | H= | P | 4910677 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 02/19/2015 | MECHANICAL FINAL OK. TEST AND BALANCE REPORT RECEIVED. REPORT MATCHES REVISED MECHANICAL PLAN. | NANCY | NANCY | | H= | C | 4905741 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 02/18/2015 | TEST AND BALANCE REPORT RECEIVED. I SEE THERE WAS A MECHANICAL SPLICE ON 2/10/15 BUT DO NOT SEE A NEW MECHANICAL DRAWING. WAS THERE A CHANGE TO THE SUPPLY AIR CFM READINGS FOR F5 AND F6? TEST AND BALANCE REPORT I HAVE DOES NOT MATCH THE ORIGINAL PRINTS. READINGS FOR F4, F5 AND F6 OUTSIDE AIR ARE OUTSIDE OF THE +/- 10% ALLOWED. | NANCY | NANCY | | H= | P | 4904878 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 01/26/2015 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4890096 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 01/23/2015 | FOR FINAL INSTALL GAS LINE TO NEW METER. | NANCY | NANCY | | H= | P | 4889473 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 01/23/2015 | OK TO SET NEW METER. | NANCY | NANCY | | HC | C | 4889472 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 01/23/2015 | INSTALLED AS PER PRINTS. | NANCY | NANCY | | HI | C | 4889463 |
LANDMARK PLUMBING AND HEATING, INC. | HI | L | 01/22/2015 | LOCKED AT 10:10 AM. | NANCY | NANCY | | HI | L | 4888808 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 01/21/2015 | FOR FINAL PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4888099 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 12/31/2014 | CANCELED BY CONTRACTOR. | NANCY | NANCY | | HD | P | 4879208 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 01/22/2015 | FREE STANDING SINK , ELECTRIC WATER HEATER | GABE | GABE | | P= | C | 4889284 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | C | 01/08/2015 | CHECK NEW WATER HEATER INSTALL AT FINAL -- FREE STANDING MOP SINK ROUGHED IN, PLANS SHOW FLOOR TYPE MOP SINK ? | LEE | LEE | | PTO | C | 4882668 |
LANDMARK PLUMBING AND HEATING, INC. | P= | R | 01/07/2015 | ALL LOCKED UP @ 4:05 | LEE | LEE | | P= | R | 4882009 |