GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 05/01/2015 | All other required Final inspections are complete. (This is a computer generated result) | DAN | DAN | | B= | C | 4947041 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 04/30/2015 | . Additional Inspections Required (computer generated): COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet. | DAN | DAN | | B= | P | 4946250 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | C | 04/13/2015 | unistrut equipment support system engineering on file/remove incorrect labeling decals above grid and replace with correct wall types | BERTW | BERTW | | BFR | C | 4934614 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/23/2015 | soffit framing OK; need revised design for over head brackets and engineer's letter for installation to approved design | DAN | DAN | | BFR | P | 4921976 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/10/2015 | Wall framing OK / Partial pending other rough inspections | JEREMYA | JEREMYA | | BFR | P | 4914177 |
COLORADO SHEET METAL CO., INC. | BSP | T | 02/12/2015 | PAID (REC#1249672) PLAN SPLICE FEE: $50 by: RUSSELL for Mechanical: Revised med gas zone valve box | RUSSELL | RUSSELL | | BSP | T | 4901885 |
GREEN ELECTRIC INC | BSP | P | 02/12/2015 | PLAN SPLICE: (No Fee) by: DOUG for Electrical | DOUG | DOUG | | BSP | P | 4901842 |
GREEN ELECTRIC INC | E= | C | 04/24/2015 | | BRET | BRET | | E= | C | 4942838 |
GREEN ELECTRIC INC | ER | C | 04/10/2015 | ceiling | BRET | BRET | | ER | C | 4933679 |
GREEN ELECTRIC INC | E= | C | 04/03/2015 | FIRE ALARM INSPECTION: | MIKEC | MIKEC | | E= | C | 4929405 |
GREEN ELECTRIC INC | ER | C | 04/03/2015 | FIRE ALARM INSPECTION: | MIKEC | MIKEC | | ER | C | 4929398 |
GREEN ELECTRIC INC | ER | P | 03/09/2015 | WALLS | MIKEC | MIKEC | | ER | P | 4913559 |
COLORADO SHEET METAL CO., INC. | H= | C | 05/01/2015 | MECHANICAL FINAL OK. | NANCY | NANCY | | H= | C | 4947312 |
COLORADO SHEET METAL CO., INC. | H= | P | 05/01/2015 | BALL IN THE WALL INSTALLED? TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | P | 4947040 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 04/23/2015 | MECHANICAL PIPING FINAL OK. | NANCY | NANCY | | H= | C | 4941215 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 04/13/2015 | PIPING TO COIL INSTALLED AND ALREADY INSULATED. NO VISIBLE LEAKS. LABEL PIPING. | NANCY | NANCY | | H= | P | 4934223 |
COLORADO SHEET METAL CO., INC. | H= | P | 04/13/2015 | INSTALL "BALL IN THE WALL". PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4934200 |
COLORADO SHEET METAL CO., INC. | HD | P | 03/13/2015 | PIPING CONTRACTOR NEEDS TO ATTACH TO PERMIT AND CALL FOR INSPECTION WHEN READY. CATH LAB 5: SUPPLY AIR OK, OK TO WRAP. RETURN AIR ALL OK, OK TO COVER. | NANCY | NANCY | | HD | P | 4916535 |
COLORADO SHEET METAL CO., INC. | HD | P | 03/11/2015 | CANCELED AT CALL AHEAD. ALREADY RESCHEDULED FOR FRIDAY. | NANCY | NANCY | | HD | P | 4915225 |