GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 03/06/2015 | Per the inspector notes. Building final ok. | REBECCA | REBECCA | | B= | C | 4912938 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 03/05/2015 | Temp CO: pending mechanical finals ( Expires: 4/4/2015 12:00:00 AM) | MINDY | MINDY | | B= | P | 4912124 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 03/05/2015 | Additional Inspections Required. building OK; need fire and mechanical final completed | DAN | DAN | | B= | P | 4911908 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | R | 03/05/2015 | Additional Inspections Required: External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, OLSON PLUMBING & HEATING CO Mechanical Final Inspection is not Completed yet (This is a computer generated result) | SYSTEM | SYSTEM | | B= | R | 4911909 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 02/20/2015 | PAID (REC#1247037) PLAN SPLICE FEE: $50 by: DANM for Construction: Minor floor plan changes | DANM | DANM | | BSP | T | 4905950 |
ENCORE ELECTRIC, INC. | BSP | T | 02/10/2015 | PAID (REC#1246258): PLAN SPLICE FEE: $50 by: DOUG for Electrical: New Comm room | DOUG | DOUG | | BSP | T | 4900474 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/03/2015 | Interior wall framing OK / Partial pending other rough inspections / Will need to have accessible restroom resolved by final inspection. Currently there is a sink located in the 60" clear floor space adjacent to the toilet. | JEREMYA | JEREMYA | | BFR | P | 4895396 |
ENCORE ELECTRIC, INC. | E= | C | 02/27/2015 | | MIKEC | MIKEC | | E= | C | 4909719 |
ENCORE ELECTRIC, INC. | E= | C | 02/26/2015 | FIRE ALARM INSPECTION: FIRE ALARM complete | TOMC | TOMC | | E= | C | 4908877 |
ENCORE ELECTRIC, INC. | ER | C | 02/24/2015 | above ceilings OK | CRAIGS | CRAIGS | | ER | C | 4907390 |
ENCORE ELECTRIC, INC. | ER | C | 02/24/2015 | FIRE ALARM INSPECTION: | CRAIGS | CRAIGS | | ER | C | 4907389 |
ENCORE ELECTRIC, INC. | ER | P | 02/03/2015 | walls see approved plans on the generals table | CRAIGS | CRAIGS | | ER | P | 4895906 |
ENCORE ELECTRIC, INC. | ER | P | 02/03/2015 | FIRE ALARM INSPECTION: walls see approved plans on the generals table | CRAIGS | CRAIGS | | ER | P | 4895904 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 03/06/2015 | | JON | JON | | H= | C | 4912528 |
COLORADO SHEET METAL CO., INC. | H= | C | 03/06/2015 | BALANCE REPORT RECEIVED | JON | JON | | H= | C | 4912527 |
COLORADO SHEET METAL CO., INC. | H= | P | 03/05/2015 | REVIEWED AIR BALANCE REPORT, ALL OK EXCEPT NO OUTSIDE AIR VALUES SHOWN. CALLED AIR BALANCE CONTRACTOR. | JON | JON | | H= | P | 4912116 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 02/27/2015 | PARTIAL PENDING TEST AND BALANCE REPORT - REST OK | JERRYF | JERRYF | | H= | P | 4909492 |
COLORADO SHEET METAL CO., INC. | H= | P | 02/23/2015 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4907139 |
OLSON PLUMBING & HEATING COMPANY | HWP | C | 02/18/2015 | PIPING INSTALLED AS PER PLAN. ALREADY UNDER WORKING PRESSURE, NO VISIBLE LEAKS. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | C | 4904862 |
COLORADO SHEET METAL CO., INC. | H16 | C | 02/05/2015 | OLSON MUST ATTACH AS THE MECHANICAL CONTRACTOR FOR PIPING TO COILS. CALL FOR INSPECTION BEFORE PIPING GETS ALL COVERED UP. | NANCY | NANCY | | H16 | C | 4897205 |
COLORADO SHEET METAL CO., INC. | HD | P | 02/05/2015 | TRUNK LINES AND LATERALS OK, OK TO WRAP LATERALS. NO COILS, FLEX OR DIFFUSERS YET. | NANCY | NANCY | | HD | P | 4897201 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 02/27/2015 | | JOEL | JOEL | | P= | C | 4909872 |
OLSON PLUMBING & HEATING COMPANY | PTO | C | 02/04/2015 | 2 sinks ok, all others deleted | JOEL | JOEL | | PTO | C | 4896551 |
OLSON PLUMBING & HEATING COMPANY | PB | C | 01/29/2015 | | JOEL | JOEL | | PB | C | 4892679 |