PIONEER GENERAL CONTRACTORS, INC. | B= | C | 04/01/2016 | All other required Final inspections are complete. (This is a computer generated result) | DAN | DAN | | B= | C | 5167376 |
PIONEER GENERAL CONTRACTORS, INC. | B= | P | 10/30/2015 | building OK, need heating completed. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, WESTECH MECHANICAL INC Mechanical Final Inspection is not Completed yet. | DAN | DAN | | B= | P | 5069961 |
WESTECH MECHANICAL INC | BSP | P | 08/04/2015 | PLAN SPLICE: (No Fee) by: RUSSELL for Mechanical: No splice fee | RUSSELL | RUSSELL | | BSP | P | 5007742 |
PIONEER GENERAL CONTRACTORS, INC. | BSP | T | 08/04/2015 | PAID (REC#1296245) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise storage room door | MICHAELA | MICHAELA | | BSP | T | 5007688 |
PIONEER GENERAL CONTRACTORS, INC. | BSP | P | 08/04/2015 | PLAN SPLICE: (No Fee) by: DOUG for Electrical: Changed gen set intake | DOUG | DOUG | | BSP | P | 5007644 |
PIONEER GENERAL CONTRACTORS, INC. | BFR | C | 05/01/2015 | angle bracing for low walls installed; completes framing | DAN | DAN | | BFR | C | 4947742 |
PIONEER GENERAL CONTRACTORS, INC. | BFR | P | 04/29/2015 | sushi and cheese bars need floor angles installed to support the low walls. recall | DAN | DAN | | BFR | P | 4945522 |
PIONEER GENERAL CONTRACTORS, INC. | BFR | P | 04/23/2015 | Deli walls OK pending other roughs | DAN | DAN | | BFR | P | 4941437 |
PIONEER GENERAL CONTRACTORS, INC. | B= | P | 03/27/2015 | pending other final partials from electrical and plumbing for Starbuck area.; building part OK -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, H20 PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet, HUSSMAN CORPORATION Mechanical Final Inspection is not Completed yet, WAYNE'S ELECTRIC INC Electrical Final Inspection is not Completed yet, WESTECH MECHANICAL INC Mechanical Final Inspection is not Completed yet. | DAN | DAN | | B= | P | 4925031 |
PIONEER GENERAL CONTRACTORS, INC. | BSP | P | 03/10/2015 | welding certification on file ; | DAN | DAN | | BSP | P | 4914058 |
PIONEER GENERAL CONTRACTORS, INC. | B= | P | 03/09/2015 | building final OK only for pharmacy. No clinic rooms. pending Fire to OK for partial -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, H20 PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet, WAYNE'S ELECTRIC INC Electrical Final Inspection is not Completed yet, WESTECH MECHANICAL INC Mechanical Final Inspection is not Completed yet. | DAN | DAN | | B= | P | 4913734 |
PIONEER GENERAL CONTRACTORS, INC. | BFR | P | 03/04/2015 | met with superintendent 303-472-3388- pharmacy area- items from 2/18 inspection complete/ supt states welder certs were emailed | BLAKE | BLAKE | | BFR | P | 4911624 |
PIONEER GENERAL CONTRACTORS, INC. | BSP | P | 03/04/2015 | met with superintendent 303-472-3388- see sheet A4.1- floral/starbucks framing area ok | BLAKE | BLAKE | | BSP | P | 4911623 |
PIONEER GENERAL CONTRACTORS, INC. | BFR | P | 02/18/2015 | threaded rods are 48"oc plans show 32"oc; tall soffit missing 4 screws into angle and screws missing into studs at kickers ; recall; welders cert to be emailed to inspector; rest of framing offices and soffits OK | DAN | DAN | | BFR | P | 4904489 |
WAYNE'S ELECTRIC INC | E= | C | 07/01/2015 | pic---ok | BRIAN | BRIAN | | E= | C | 4984680 |
WAYNE'S ELECTRIC INC | E= | P | 06/30/2015 | NEED PIC OF SUPPORT OF SHELF FEEDS-----OK TO SEND PIC------- | BRIAN | BRIAN | | E= | P | 4983343 |
WAYNE'S ELECTRIC INC | ES | C | 06/30/2015 | Commercial Service: GENERATOR --OK---------200 AMP 120/208 4-W-------NO ACTION NEEDED----- | BRIAN | BRIAN | | ES | C | 4983335 |
WAYNE'S ELECTRIC INC | ES | P | 06/05/2015 | Commercial Service: pre release only----- | BRIAN | BRIAN | | ES | P | 4967380 |
WAYNE'S ELECTRIC INC | E= | P | 06/04/2015 | PRODUCE PERP---- | BRIAN | BRIAN | | E= | P | 4966580 |
WAYNE'S ELECTRIC INC | E= | P | 05/18/2015 | DELI AREA------NEED 12-3 SO CORD DROPS--- | BRIAN | BRIAN | | E= | P | 4956095 |
WAYNE'S ELECTRIC INC | E= | P | 05/07/2015 | SUSHI AND MURRAYS CHEESE AREAS------ | BRIAN | BRIAN | | E= | P | 4950526 |
WAYNE'S ELECTRIC INC | ER | P | 05/01/2015 | WALLS AT SUSHI AND DAIRY | BRIAN | BRIAN | | ER | P | 4947185 |
WAYNE'S ELECTRIC INC | E= | P | 04/24/2015 | FIRE ALARM COMPLETE----- | BRIAN | BRIAN | | E= | P | 4942166 |
WAYNE'S ELECTRIC INC | ER | P | 04/21/2015 | walls at the deli ---fire alarm on first floor--- | BRIAN | BRIAN | | ER | P | 4939336 |
WAYNE'S ELECTRIC INC | ER | P | 04/09/2015 | grid ceilings in produce area---see plans | BRIAN | BRIAN | | ER | P | 4933111 |
WAYNE'S ELECTRIC INC | E= | P | 03/27/2015 | STARBUCKS AREA---TRANSFORMER AND PANEL-------SEE PLANS | BRIAN | BRIAN | | E= | P | 4924704 |
WAYNE'S ELECTRIC INC | ER | P | 03/17/2015 | CEILINGS IN STARBUCKS AND FLORAL AREA-------FIRE ALARM ALSO----- | BRIAN | BRIAN | | ER | P | 4918272 |
WAYNE'S ELECTRIC INC | E= | P | 03/06/2015 | PHARMACY ---OK------ | BRIAN | BRIAN | | E= | P | 4912537 |
WAYNE'S ELECTRIC INC | ER | P | 03/05/2015 | PHARMACY CEILING--------SEE PLANS-----FIRE ALARM OK ALSO---NO PERMIT CARD TO SIGN | BRIAN | BRIAN | | ER | P | 4911754 |
WAYNE'S ELECTRIC INC | ER | P | 03/02/2015 | STARBUCKS NEW WALLS------ | BRIAN | BRIAN | | ER | P | 4910404 |
WAYNE'S ELECTRIC INC | ER | P | 02/17/2015 | PARTIAL WALLS SEE PLANS | BRIAN | BRIAN | | ER | P | 4903861 |
WESTECH MECHANICAL INC | H= | C | 04/01/2016 | EXTENSION ON GREASE FAN COMPLETE | JERRYF | JERRYF | | H= | C | 5167375 |
WESTECH MECHANICAL INC | H= | P | 01/19/2016 | NEED FACTORY APPROVED FAN EXTENSION OR LETTER FROM MANUFACTURE APPROVING SHOP BUILT EXTENSION | JERRYF | JERRYF | | H= | P | 5117682 |
WESTECH MECHANICAL INC | H= | P | 01/13/2016 | NEED GREASE FAN EXHAUST 3' ABOVE MUA INTAKE - REST OK NOTES: ERIC WITH WESTECH CERTIFIES INTERLOCKS ARE FULLY OPERATIONAL INSPECTOR COULD NOT VERIFY DUE TO HOODS BEING IN OPERATION | JERRYF | JERRYF | | H= | P | 5115200 |
HUSSMANN CORPORATION | H= | P | 12/10/2015 | TAB REPORT RECEIVED - STILL NEED ALL NEW INSTALLED EQUIPMENT ADDED TO HVAC PERMIT WORK SCOPE | JERRYF | JERRYF | | H= | P | 5095817 |
WESTECH MECHANICAL INC | H= | P | 07/17/2015 | NEED ALL PREVIOUS NOTES ADDRESSED FOR FUTURE INSPECTIONS - NEED INSTALL MANUAL FOR GENERATOR -NEED ALL PLAN REVISIONS STAMPED AND APPROVED THROUGH PPRBD FOR NEW DUCT WORK TO RADIATOR ON GENERATOR AND NEW EXHAUST FAN IN STORAGE AREA- NEED INTERLOCKS VERIFIED - NEED ALL EQUIPMENT ADDED TO PERMIT PER PREVIOUS NOTES - NEED PLAN REVISION APPROVED FOR ADDED EXHAUST FAN IN STORAGE AREA - NEED NEW MUA UNIT INSTALLED - NEED TAB REPORT - STOPPED INSPECTION NOT READY - TRIP FEES WILL APPLY IF PREVIOYUS NOTES ARE NOT ADDRESSED FOR FUTURE INSPECTIONS | JERRYF | JERRYF | | H= | P | 4995561 |
HUSSMANN CORPORATION | H= | C | 07/10/2015 | refrigeration final | JON | JON | | H= | C | 4990739 |
WESTECH MECHANICAL INC | HD | P | 06/05/2015 | FOR FUTURE INSPECTION - PER PREVIOUS NOTES NEED ALL INSTALLED EQUIPMENT ADDED TO PERMIT - NEED INTERLOCKS AND MAKE UP AIR VERIFIED - TAB REPORT - CONTRACTOR REVIEW ALL PREVIOUS NOTES BEFORE NEXT INSPECTION (((( AGAIN PLEASE PROVIDE CONTACT INFORMATION AND WHAT IS TO BE INSPECTED FOR ALL FUTURE INSPECTIONS ))))) - ROOF INSPECTION AND STAINLESS WORK OK | JERRYF | JERRYF | | HD | P | 4967805 |
WESTECH MECHANICAL INC | HD | P | 05/28/2015 | MUST HAVE MINIMUM OF 3 INCH OVERLAP ON ALL JOINTS OF SECOND LAYER OF GREASE WRAP. WRAP INSIDE CURB TO BE A MINIMUM OF 18 INCHES ABOVE ROOFING. PROPERLY SEAL THE AREA OF WALL BEHIND GREASE DUCT, GREASE STILL ABLE TO GET BETWEEN STAINLESS AND WALL, THAT AREA MUST BE COMPLETELY FLASHED CLOSED. PLEASE, WHEN CALLING FOR AN INSPECTION USE THE "INSPECTOR COMMENTS" AREA TO PROVIDE THE NAME AND NUMBER OF THE WESTECH PERSON ON SITE SO A CALL CAN BE PLACED TO THEM PRIOR TO INSPECTOR GOING TO JOB SITE. STILL NEED A REVISED SCOPE OF WORK. | NANCY | NANCY | | HD | P | 4962114 |
WESTECH MECHANICAL INC | HD | P | 05/21/2015 | GREASE DUCT OK FOR 2ND LAYER WRAP - REMOVE SPRAY FOAM AT HOLE AND INSTALL STAINLESS AND SEAL WILL CONFIRM AT FUTURE INSPECTION - NEED PERMIT SCOPE CORRECTED PER PREVIOUS NOTES TO REFLECT ALL INSTALLED EQUIPMENT AND DUCT WORK FOR ENTIRE PROJECT AND CONTRACTOR REVIEW ALL PREVIOUS NOTES FOR FUTURE INSPECTIONS | JERRYF | JERRYF | | HD | P | 4958641 |
WESTECH MECHANICAL INC | HD | P | 05/19/2015 | GREASE DUCT OK FOR 1ST LAYER OF GREASE WRAP - ONSITE CONTACT WILL BE JIM 303-476 -1107 - SEE ALL PREVIOUS NOTES FOR FUTURE INSPECTION - NEED ROOF INSPECTION AND ALL NOTES ADDRESSED | JERRYF | JERRYF | | HD | P | 4957144 |
WESTECH MECHANICAL INC | HD | R | 05/18/2015 | NOTES REVISED AT 11:00 5/18 - 2 HOLES FOUND ON UPPER SECTION BELOW CURB COULD NOT MARK - 1 HOLE FOUND IN HORIZONTAL RUN AT BACK MARKED - DO NOT WRAP ANY DUCT - NEED ALL HOLES , GAPS AND SEAMS SEALED IN WASHABLE SURFACE - AS PER PREVIOUS NOTES NEED CALL AHEAD - CONTACTED MECH. CONTRACTOR OFFICE UPON ARRIVAL AND INSTRUCTED THEM THAT CALL AHEAD INFO IS NEEDED - RECEIVED SERVICE TECHS NUMBER CALLED HIM WAS TOLD HE WAS AT LEAST 30 MINUTES AWAY - THIS INSPECTOR CANCELED INSPECTION - AGAIN NEED CALL AHEAD INFORMATION FOR ONSITE PERSONAL IF NEXT INSPECTION IS FOR GREASE DUCT WILL NEED TECH READY WITH LIGHT AND LADDER - NEED FIRE WRAP INSTALL MANUAL (((( CONTRACTOR REVIEW ALL PREVIOUS NOTES FOR FUTURE INSPECTIONS))))) | JERRYF | JERRYF | | HD | R | 4956034 |
HUSSMANN CORPORATION | HRP | P | 05/18/2015 | PRESSURE TEST OK ON LINES TO DAIRY SECTION - NEED TO SEE FINAL TIE INS | JERRYF | JERRYF | | HRP | P | 4956027 |
WESTECH MECHANICAL INC | H16 | C | 05/12/2015 | NOTES ADDED 5/12/15 - NEED HOOD AND EXHAUST FAN CLAIMED ON PERMIT - NEED TO VERIFY INTERLOCKS AND ROOF INSPECTION | JERRYF | JERRYF | | H16 | C | 4952548 |
WESTECH MECHANICAL INC | HD | R | 05/11/2015 | NEED THE FOLLOWING FOR NEXT INSPECTION - STAINLESS STEEL TO 18" ABOVE HOOD ON ALL WALLS - WOOD REMOVED FROM INSIDE ROOF CURB - WRAP REMOVED AT UPPER SECTION TO VERIFY WELDING - SEVERAL HOLES FOUND - (PER ALL PREVIOUS NOTES FOR ALL MECHANICAL CONTRACTORS CALL AHEAD NUMBER AND WHAT I AM TO INSPECT OR TRIP FEE WILL APPLY AND NO INSPECTION DONE | JERRYF | JERRYF | | HD | R | 4952497 |
HUSSMANN CORPORATION | HRP | C | 03/30/2015 | PRESSURE TEST OK AT PRODUCE AREA | JERRYF | JERRYF | | HRP | C | 4925890 |
WESTECH MECHANICAL INC | H= | P | 03/30/2015 | ABOVE CEILING OK - ALL GRILLES INSTALLED IN STAR BUCKS - NEED TO RE VIEW PERMIT WORK SCOPE TO VERIFY ALL INSTALLED MATCHES PLANS - WILL WORK AT GENERATOR AREA BE COMPLETED UNDER A DIFFERENT PERMIT - WAS PHARMACY UNDER THIS PERMIT ALSO ????? - AGAIN PER PREVIOUS NOTES NEED CALL AHEAD NUMBER AND CONTACT INFO FOR ALL FUTURE INSPECTIONS OR TRIP FEE MAY BE ACCESSED | JERRYF | JERRYF | | H= | P | 4925830 |
WESTECH MECHANICAL INC | HD | R | 03/24/2015 | STOPPED INSPECTION - NO CALL INFO - DID NOT KNOW WHAT I WAS TO LOOK AT - COULD NOT LOCATE APPROVED PLANS OR ONSITE PERSONNEL - NEED CALL AHEAD NUMBER AND INFO ON WHAT IS TO BE INSPECTED FOR ALL FUTURE INSPECTIONS | JERRYF | JERRYF | | HD | R | 4922390 |
WESTECH MECHANICAL INC | HD | P | 02/20/2015 | PHARMACY: RTU 3 ROUGH ROUND TRUNK LINES AND LATERALS OK, OK TO WRAP AND CLOSE UP WRAP EXCEPT SEAL MISSED JOINTS ON SUPPLY RUN TO PATIENT ROOM 2. NO RTU OR DROPS YET. NO EXHAUST, FLEX OR DIFFUSERS YET. AT NEXT INSPECTION PROVIDE A CALL AHEAD NUMBER AND NAME. | NANCY | NANCY | | HD | P | 4906302 |
H2O PLUMBING & HEATING, INC. | P= | C | 06/18/2015 | ALL CORRECTIONS MADE , VENTS THROUGH ROOF , ALL FIXTURES SET IN EXISTING BATH GROUPS | GABE | GABE | | P= | C | 4975547 |
H2O PLUMBING & HEATING, INC. | P= | P | 06/04/2015 | need vents through roof. other vent tie-ins in ceiling ok. pharmacy, sushi, murray's cheese, meat department, deli and produce complete. need all new bathroom fixtures inspected. | DICK | DICK | | P= | P | 4966613 |
H2O PLUMBING & HEATING, INC. | PTO | P | 06/04/2015 | need vents through roof rest ok. | DICK | DICK | | PTO | P | 4966598 |
H2O PLUMBING & HEATING, INC. | PB | C | 05/06/2015 | meat and seafood area, meat and produce coolers ok, this completes the underground DWV. | DICK | DICK | | PB | C | 4949674 |
H2O PLUMBING & HEATING, INC. | PTO | P | 04/29/2015 | sushi area and murray's cheese area in walls DWV and water ok check tie ins above ceiling at final | DICK | DICK | | PTO | P | 4945501 |
H2O PLUMBING & HEATING, INC. | PTO | P | 04/24/2015 | deli prep area ok. | DICK | DICK | | PTO | P | 4942589 |
H2O PLUMBING & HEATING, INC. | PTO | L | 04/23/2015 | looked all around store could not find work area, put work area in coments. left phone number for plumber to call me on message | DICK | DICK | | PTO | L | 4941603 |
H2O PLUMBING & HEATING, INC. | PB | P | 04/17/2015 | DWV grease and sanitary shusi area ok. | DICK | DICK | | PB | P | 4938030 |
H2O PLUMBING & HEATING, INC. | PB | P | 04/10/2015 | deli area and murray's cheese area ok. | DICK | DICK | | PB | P | 4933266 |
H2O PLUMBING & HEATING, INC. | P= | P | 03/27/2015 | star bucks and janitor closet behind star bucks ok. | DICK | DICK | | P= | P | 4925242 |
H2O PLUMBING & HEATING, INC. | PB | P | 03/26/2015 | all floor sinks in freezer area. | DICK | DICK | | PB | P | 4924107 |
H2O PLUMBING & HEATING, INC. | PB | P | 03/20/2015 | 5 floor drains in produce area ok | DICK | DICK | | PB | P | 4920578 |
H2O PLUMBING & HEATING, INC. | P= | R | 03/10/2015 | nothing ready in pharmacy. waived trip fee | DICK | DICK | | P= | R | 4914614 |
H2O PLUMBING & HEATING, INC. | PTO | P | 03/03/2015 | grease trap needs flow control installed. water to eye wash and mop sink ok, dwv vents ok. star bucks area. | DICK | DICK | | PTO | P | 4910672 |
H2O PLUMBING & HEATING, INC. | PB | P | 02/19/2015 | star bucks area dwv test ok, need grease trap. NOTE, please include plumbers contact number for inspections. | DICK | DICK | | PB | P | 4905265 |
H2O PLUMBING & HEATING, INC. | PTO | P | 02/17/2015 | PHARMACY -- NEED ALL WRAPS EXPOSED -- SUPPORT OVERHEAD COPPER TO CODE -- NEED CLOSET FLANGE ANCHORED DOWN (MAY PROVIDE PICS AT FINAL) -- NEED CP-1 AT HAND SINK ON FINAL PER PLANS | TAYLOR | TAYLOR | | PTO | P | 4903889 |
H2O PLUMBING & HEATING, INC. | PB | P | 02/13/2015 | water closet, lav and floor drain in little clinic, 2 hand sinks in pharmacy ok | DICK | DICK | | PB | P | 4902237 |
H2O PLUMBING & HEATING, INC. | PB | P | 02/04/2015 | BASE AND RISERS IN TEMP PHARMACY OK ON TEST | GABE | GABE | | PB | P | 4896201 |