MERRITT GENERAL CONTRACTORS, INC. | B= | C | 04/15/2015 | | DAN | DAN | | B= | C | 4935948 |
MERRITT GENERAL CONTRACTORS, INC. | B= | P | 04/09/2015 | building OK. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, CONTRACT MECHANICAL SVC INC Plumbing Final Inspection is not Completed yet. | DAN | DAN | | B= | P | 4932581 |
MERRITT GENERAL CONTRACTORS, INC. | B= | P | 03/20/2015 | need other finals completed; fire final; door to remain unlocked sign above south most door -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, CONTRACT MECHANICAL SVC INC Plumbing Final Inspection is not Completed yet, FOSTER ELECTRIC CORP Electrical Final Inspection is not Completed yet, PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | DAN | DAN | | B= | P | 4921178 |
FOSTER ELECTRIC CORPORATION | E= | C | 03/23/2015 | | MIKEC | MIKEC | | E= | C | 4921925 |
FOSTER ELECTRIC CORPORATION | E= | R | 03/19/2015 | NOT READY | MIKEC | MIKEC | | E= | R | 4920122 |
FOSTER ELECTRIC CORPORATION | ES | R | 03/19/2015 | ALREADY COMPLETED | MIKEC | MIKEC | | ES | R | 4920119 |
FOSTER ELECTRIC CORPORATION | ES | C | 03/12/2015 | Commercial Service: NEW 200 AMP 3PH. NAN | MIKEC | MIKEC | | ES | C | 4916100 |
FOSTER ELECTRIC CORPORATION | ES | P | 03/04/2015 | Commercial Service: PRE RELEASE | MIKEC | MIKEC | | ES | P | 4911360 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 03/25/2015 | TEST AND BALANCE REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 4922969 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 03/24/2015 | TEST AND BALANCE REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 4922817 |
CONTRACT MECHANICAL SVC INC | H= | C | 03/20/2015 | GAS FINAL OK. | NANCY | NANCY | | H= | C | 4920751 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 03/20/2015 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4920749 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 03/12/2015 | GREASE DUCT ALL OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 4915744 |
CONTRACT MECHANICAL SVC INC | HC | C | 03/11/2015 | 838,000 BTU'S ADDED TO EXISTING 2 LB METER. | NANCY | NANCY | | HC | C | 4915035 |
CONTRACT MECHANICAL SVC INC | HI | C | 03/11/2015 | 10 LB TEST OK. INSTALLED AS PER PRINTS. | NANCY | NANCY | | HI | C | 4915034 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 03/11/2015 | REPAIR HOLES IN GREASE DUCT. | NANCY | NANCY | | HD | P | 4915032 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 03/09/2015 | GREASE DUCT INSPECTION PERFORMED AT PEAK HEATING SHOP - FAN DUCT FLUTE WITH 3' DUCT - 2 - 45 DEGREE ELBOWS AND TRANSITION TO HOOD SECTION - 12" DUCT CONNECTED TO ELBOWS | JERRYF | JERRYF | | HD | P | 4913645 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 03/06/2015 | HOOD WALL CONSTRUCTION OK - BY FINAL NEED WASH ABLE SURFACE TO 18" ABOVE HOOD | JERRYF | JERRYF | | HD | P | 4912866 |
CONTRACT MECHANICAL SVC INC | P= | C | 04/13/2015 | corrections made | DICK | DICK | | P= | C | 4934749 |
CONTRACT MECHANICAL SVC INC | P= | P | 03/20/2015 | NEED TO INSTALL TEMPERING AT HAND SINKS , REST OK | GABE | GABE | | P= | P | 4921141 |
CONTRACT MECHANICAL SVC INC | PTO | C | 03/03/2015 | NEED TO SEE VENT TIE IN AT FINAL | GABE | GABE | | PTO | C | 4911208 |