C & S DEVELOPMENT SERVICES, LLC. | B= | C | 07/17/2015 | All other required Final inspections are complete. (This is a computer generated result) | TOMG | TOMG | | B= | C | 4995475 |
C & S DEVELOPMENT SERVICES, LLC. | B= | P | 07/17/2015 | Received open hole report. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | TOMG | TOMG | | B= | P | 4995264 |
C & S DEVELOPMENT SERVICES, LLC. | B= | P | 07/16/2015 | All items addressed except previously requested open hole report. Additional Inspections Required (computer generated): External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977). | TOMG | TOMG | | B= | P | 4995030 |
C & S DEVELOPMENT SERVICES, LLC. | B= | P | 06/10/2015 | Temp CO: All partials ( Expires: 7/10/2015 12:00:00 AM) | JANE | JANE | | B= | P | 4970249 |
C & S DEVELOPMENT SERVICES, LLC. | BSP | P | 06/09/2015 | On site with Inspector Anderson. Missing vertical grab bars/ need compliant exit lights. Need stamped open hole report. Sinks encroach in clear floor space in restrooms. Still need approved fire final. | TOMG | TOMG | | BSP | P | 4970185 |
C & S DEVELOPMENT SERVICES, LLC. | B= | P | 06/09/2015 | Missing vert grab bars in restrooms / fix exit signs so that arrows lead to exits / Need stamped open hole / Sinks in restrooms encroach into clear floor space adjacent to toilet / Complete all other final inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection N= by ENGINEERING is not Completed yet (Contact: City Engineering Inspections 719-385-5977), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, HAWKINS COMMERCIAL APPLIANCE SERVICE Mechanical Final Inspection is not Completed yet, HERRON ELECTRIC Electrical Final Inspection is not Completed yet, HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet, PLATINUM PLUMBING Mechanical Final Inspection is not Completed yet, PLATINUM PLUMBING Plumbing Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 4970184 |
C & S DEVELOPMENT SERVICES, LLC. | BIN | C | 05/14/2015 | Exterior thermal OK | JEREMYA | JEREMYA | | BIN | C | 4954998 |
C & S DEVELOPMENT SERVICES, LLC. | BFR | P | 05/13/2015 | Framing OK / Partial pending other rough inspections | JEREMYA | JEREMYA | | BFR | P | 4954217 |
C & S DEVELOPMENT SERVICES, LLC. | BFN | P | 04/10/2015 | BFT and BFN will remain partial until I have received a stamped open hole observation from a Colorado Registered Engineer / Foundation OK | JEREMYA | JEREMYA | | BFN | P | 4933957 |
C & S DEVELOPMENT SERVICES, LLC. | BSP | T | 04/09/2015 | PAID (REC#1255496) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: TRUSSES | SHELLEY | SHELLEY | | BSP | T | 4932288 |
C & S DEVELOPMENT SERVICES, LLC. | BFT | P | 04/07/2015 | Footings OK pending receipt of stamped open hole / TRUSSES PENDING | JEREMYA | JEREMYA | | BFT | P | 4931332 |
HERRON ELECTRIC COMPANY | E= | C | 06/17/2015 | All the signs had been inspected, was waiting for sign company | GARYL | GARYL | | E= | C | 4975454 |
HERRON ELECTRIC COMPANY | E= | P | 06/12/2015 | need signs called in | GARYL | GARYL | | E= | P | 4972753 |
HERRON ELECTRIC COMPANY | ES | C | 06/10/2015 | Commercial Service: 600 AMP 4/W OK TO ENERGIZE | TIMA | TIMA | | ES | C | 4970238 |
HERRON ELECTRIC COMPANY | E= | P | 06/09/2015 | OK to train employees, most of interrior complete, clean up l/v on ceiling in panel room, will check with Dean on some issues, RTU's identified | GARYL | GARYL | | E= | P | 4969615 |
HERRON ELECTRIC COMPANY | E= | P | 06/08/2015 | PAID (REC#1266639): gfci protect all receptacles in the kitchen ------ dead front gfc the monitor receptacles off the ups -- label roof top units with panel and circuit #--- 20 amp breaker max for the star pro max cookers --- NOTE : dining room , rest rooms , cooler/ freezer --- OK---- the General contractor needs a am inspection tomorrow --- paralleled 350 cu from the transformer to the ct can | CRAIGS | CRAIGS | | E= | P | 4969207 |
HERRON ELECTRIC COMPANY | E= | T | 06/08/2015 | PAID (REC#1266585) | DEAN | DEAN | | E= | T | 4968905 |
HERRON ELECTRIC COMPANY | EUG | P | 06/05/2015 | south east sde og building | BRET | BRET | | EUG | P | 4967915 |
HERRON ELECTRIC COMPANY | ER | P | 06/04/2015 | ceilings ok, leave ceiling above gear open for final to see j-box for contactor, note! west end trenching ok to cover | GARYL | GARYL | | ER | P | 4967287 |
HERRON ELECTRIC COMPANY | ES | R | 06/01/2015 | Need service lateral installed from xfrm to CT cabinet | GARYL | GARYL | | ES | R | 4964372 |
HERRON ELECTRIC COMPANY | ER | P | 04/29/2015 | walls and lid ok, unclear on bath fans may need ladder for fan inspection. | BRET | BRET | | ER | P | 4945675 |
HERRON ELECTRIC COMPANY | ESL | P | 04/07/2015 | slab and re-bar for ufer---- note! no conductor ran to ufer-only rebar | GARYL | GARYL | | ESL | P | 4930887 |
HVAC SOLUTIONS, INC. | H= | C | 06/30/2015 | MECHANICAL FINAL OK. TEST AND BALANCE REPORT RECEIVED AND SCANNED, | NANCY | NANCY | | H= | C | 4984313 |
HVAC SOLUTIONS, INC. | H= | P | 06/15/2015 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4973117 |
HVAC SOLUTIONS, INC. | H= | P | 06/15/2015 | PROPERLY INSTALL EQUIPMENT UNDER HOOD. SECURE SIDE PANEL ON HOOD. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4972846 |
PLATINUM PLUMBING INC | H= | C | 06/11/2015 | GAS/WATER HEATER VENT FINAL OK. | NANCY | NANCY | | H= | C | 4971367 |
HAWKINS COMMERCIAL APPLIANCE SERVICE INC. | H= | C | 06/11/2015 | REFRIGERATION FINAL OK. | NANCY | NANCY | | H= | C | 4971365 |
HVAC SOLUTIONS, INC. | H= | P | 06/11/2015 | PERMANENTLY LABEL ALL EQUIPMENT ON ROOF. INTERLOCKS? SMOKE DETECTORS? REMOTE INDICATORS? PROVIDE TEST AND BALANCE REPORT. GREASE WRAP OK. | NANCY | NANCY | | H= | P | 4971363 |
PLATINUM PLUMBING INC | H= | P | 06/09/2015 | WATER HEATER VENT TO BE 3 FEET ABOVE RTU ECONOMIZER. VERIFY MANUFACTURERS INSTRUCTIONS REGARDING IF THE INTAKE PIPE WILL ALSO NEED TO BE RAISED. | NANCY | NANCY | | H= | P | 4969646 |
HAWKINS COMMERCIAL APPLIANCE SERVICE INC. | H= | P | 06/08/2015 | SECURE CONDENSATE DRAIN UNDER SINK. REFRIGERATION LEAKAGE ALARMS REQUIRED? REST OF REFRIGERATION OK. | NANCY | NANCY | | H= | P | 4968561 |
PLATINUM PLUMBING INC | H= | P | 06/08/2015 | TERMINATE WATER HEATER VENTS PER MANUFACTURERS INSTRUCTIONS. VENT TO BE 10 FEET AWAY OR 3 FEET ABOVE RTU ECONOMIZER. NOTE: GAS FLEX ON WATER HEATER OK. | NANCY | NANCY | | H= | P | 4968560 |
HVAC SOLUTIONS, INC. | H= | P | 06/08/2015 | PROVIDE GREASE WRAP INSTALLATION INSTRUCTIONS. PROPERLY INSTALL WRAP FOR ACCESS DOOR. THERE IS NO OVERLAP ON THE SECOND LAYER AT THE BOTTOM OF THE CURB. SEAL GREASE DUCT TO FAN CURB WITH HI TEMP SILICONE THEN INSTALL GASKET. LABEL ALL EQUIPMENT ON ROOF AS TO AREA SERVED. INSTALL EXTRA RUNG ON PARAPET WALL LADDER. REMOTE INDICATORS FOR SMOKE DETECTORS? CONTRACTOR TO PROVIDE PERSONNEL TO SHOW INSPECTOR THAT INTERLOCKS FUNCTION AS PER PRINTS. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 4968559 |
PLATINUM PLUMBING INC | HI | C | 06/05/2015 | GAS ON ROOF INSTALLED AS PER PRINTS. FOR FINAL STILL NEED REVISED/APPROVED PRINTS (SEE PREVIOUS HI NOTES), REPLACE GAS FLEX TO WATER HEATER WITH ONE SIZED FOR 199,000 BTU'S AND INSTALL ALL MISSING CLAMPS ON PIPE SUPPORTS ON ROOF. | NANCY | NANCY | | HI | C | 4967853 |
PLATINUM PLUMBING INC | HV | P | 06/05/2015 | SEE PAGE 12 NOTES 3, 5, 6 AND FIGURE 6 OF INSTALLATION MANUAL FOR PROPER TERMINATION OF WATER HEATER VENT PIPES ON ROOF. | NANCY | NANCY | | HV | P | 4967846 |
HVAC SOLUTIONS, INC. | HD | P | 06/05/2015 | GREASE DUCT OK, OK TO WRAP. STILL NEED TO SEE CONNECTION AT FAN CURB. ELECTRICAL ON EXHAUST FAN DOES NOT ALLOW IT TO OPEN. COMPLETE INSTALLATION OF EQUIPMENT ON ROOF. INSTALL EXTRA RUNGS ON ROOF SIDE OF LADDER OVER PARAPET WALL, CODE REQUIRES A MAXIMUM STEP OF 30 INCHES. PERMANENTLY LABEL ALL EQUIPMENT ON ROOF. WILL NEED TO SEE ALL INTERLOCKS FUNCTION AS PER EQUIPMENT SCHEDULE. | NANCY | NANCY | | HD | P | 4967842 |
HVAC SOLUTIONS, INC. | HD | P | 06/03/2015 | SEAL ALL HOLES IN GREASE DUCT. INSTALL A DAM INSIDE DUCT SO THAT NO AREA IS GOING TO TRAP ANY GREASE. THERE IS NOT THREE INCHES OF CLEARANCE FOR WRAP ON BACK SIDE OF GREASE DUCT ABOVE HOOD. FLEX AND DIFFUSERS ABOVE CEILING OK. SMOKE DETECTORS WILL NEED REMOTE INDICATORS. PLEASE, BETTER COORDINATION WOULD BE APPRECIATED. | NANCY | NANCY | | HD | P | 4965897 |
HVAC SOLUTIONS, INC. | HD | P | 05/28/2015 | GREASE DUCT INSPECTION FROM DROP IN CURB TO ELBOW THROAT: REPAIR THREE HOLES IN GREASE DUCT. LIGHT TEST HORIZONTAL DUCT BEFORE CALLING FOR INSPECTION. THREE INCH MINIMUM CLEARANCE REQUIRED ALL THE WAY AROUND GREASE DUCT FOR TWO LAYERS OF WRAP. | NANCY | NANCY | | HD | P | 4962691 |
PLATINUM PLUMBING INC | HC | C | 05/12/2015 | OK TO SET METER. | NANCY | NANCY | | HC | C | 4952601 |
PLATINUM PLUMBING INC | HI | P | 05/12/2015 | NEED REVISED/APPROVED PRINTS SHOWING THE 1 1/2" LINE FOR WATER HEATER AND COOK LINE. ALSO DELETE COMMENT ABOUT METER BEING LOCATED 150 FEET FROM THE BUILDING, METER IS BEING SET AT BACK OF BUILDING. STILL NEED TO SEE GAS ON ROOF. | NANCY | NANCY | | HI | P | 4952600 |
PLATINUM PLUMBING INC | HI | P | 05/11/2015 | 60 LB TEST OK ON WELDED LINE IN WEST WALL AND ALL GAS INSIDE BUILDING UP TO AND INCLUDING COOK LINE. NEED REVISED/APPROVED PRINTS SHOWING 1 1/2 INSTEAD OF 2 INCH LINE TEEING OFF FOR INSIDE GAS. WHERE IS METER BEING SET, AT BUILDING? PRINTS HAVE A NOTE STATING EXISTING METER LOCATION IS APPROXIMATELY 150 FEET AWAY AND UNDERGROUND GAS LINE WILL BE INSTALLED? NO ACCESS TO ROOF TODAY, NO INSPECTION OF GAS ON ROOF. | NANCY | NANCY | | HI | P | 4952023 |
HVAC SOLUTIONS, INC. | HD | P | 05/07/2015 | RTU-1, RTU-2 AND MAKE-UP AIR ABOVE CEILING OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 4950729 |
PLATINUM PLUMBING INC | P= | C | 07/16/2015 | ALL CORRECTIONS MADE , BACK FLOW IN | GABE | GABE | | P= | C | 4995020 |
PLATINUM PLUMBING INC | P= | P | 06/12/2015 | CORRECTIONS MADE , WAITING ON DUAL CHECK VALVES . | GABE | GABE | | P= | P | 4972310 |
PLATINUM PLUMBING INC | P= | P | 06/10/2015 | CONTRACTOR CANCELED | GABE | GABE | | P= | P | 4970279 |
PLATINUM PLUMBING INC | P= | P | 06/09/2015 | NEED BACK FLOW ON ALL WATER CONNECTED APPLIANCES , 3 COMP SINK DRAIN IS FLAT AND BACK GRADED AT LEFT SIDE , SUPPORT EXPANSION TANK , INSTALL STRAINERS AT ALL FLOOR SINKS , REST OK | GABE | GABE | | P= | P | 4970168 |
PLATINUM PLUMBING INC | PTO | C | 05/12/2015 | | JOEL | JOEL | | PTO | C | 4953026 |
PLATINUM PLUMBING INC | PTO | P | 05/06/2015 | revise h2o plans to show new water service location, h2o undersized, need hdpe or copper for h2o service line | JOEL | JOEL | | PTO | P | 4950339 |
PLATINUM PLUMBING INC | PTO | R | 05/05/2015 | no plans on site, cannot verify tests due to all wet conditions, h2o needs proper freeze protection in attic and outside walls, set closet flanges. reinspect all | JOEL | JOEL | | PTO | R | 4949340 |
PLATINUM PLUMBING INC | PGI | R | 04/03/2015 | cancelled (csu inspection) | JOEL | JOEL | | PGI | R | 4929492 |
PLATINUM PLUMBING INC | PWO | C | 04/03/2015 | | JOEL | JOEL | | PWO | C | 4929441 |
PLATINUM PLUMBING INC | PB | C | 03/31/2015 | PIPING TO PLAN , BASE COMPLETE | GABE | GABE | | PB | C | 4926932 |