GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 01/31/2020 | All other required Final inspections are complete. (This is a computer generated result) | SCOTTS | SCOTTS | | B= | C | 6470533 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 01/29/2020 | complete P=/rest ok. Additional Inspections Required (computer generated): OLSON PLUMBING & HEATING CO Plumbing Final Inspection is not Completed yet. | SCOTTS | SCOTTS | | B= | P | 6467570 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/07/2020 | verified all framing in scope of work is OK / need to patch inspection hole in IT room / need to remove spray foam in upper parts of walls in IT room / need to attach a plumbing permit and have inspections / can do B= at reinspection of above items / discussed need for fire final with contractor | DANE | DANE | | BFR | P | 6445402 |
DPR CONSTRUCTION, A GENERAL PARTNERSHIP | BSP | T | 08/02/2017 | PAID (REC#1443696) PLAN SPLICE FEE: $50 by: DANM for Construction: Minor revisions including removal of plumbing sheet and addition of details | DANM | DANM | | BSP | T | 5583465 |
DPR CONSTRUCTION, A GENERAL PARTNERSHIP | BE | L | 07/14/2017 | Renewed at 7/14/2017 1:21:49 PM | MINDY | MINDY | | BE | L | 5564781 |
DPR CONSTRUCTION, A GENERAL PARTNERSHIP | BFR | P | 12/19/2016 | revised detail ok on file per Bert W/need plumbing contractor attached to this permit and all other inspections completed.Spoke to Nathan contractor on all aspects of how to proceed forward to get final compliance inspection | BERTW | BERTW | | BFR | P | 5371739 |
DPR CONSTRUCTION, A GENERAL PARTNERSHIP | BE | L | 12/19/2016 | Renewed at 12/19/2016 2:27:30 PM | BERTW | BERTW | | BE | L | 5371735 |
DPR CONSTRUCTION, A GENERAL PARTNERSHIP | BE | L | 01/20/2016 | Renewed at 1/20/2016 9:58:20 AM | TERRI | TERRI | | BE | L | 5119161 |
DPR CONSTRUCTION, A GENERAL PARTNERSHIP | BFR | P | 06/11/2015 | Walls covered prior to inspection. Designer will provide letter. | TOMG | TOMG | | BFR | P | 4971964 |
DPR CONSTRUCTION, A GENERAL PARTNERSHIP | BFR | P | 05/05/2015 | need architect letter to revised wall type from #26 on Sheet A001. to non rated wall type. Need roughs completed | DAN | DAN | | BFR | P | 4948975 |
CLAYDEAN ELECTRIC COMPANY | E= | C | 02/26/2016 | | MIKEC | MIKEC | | E= | C | 5143694 |
CLAYDEAN ELECTRIC COMPANY | EE | L | 02/09/2016 | Renewed at 2/9/2016 3:15:49 PM | SABRINA | SABRINA | | EE | L | 5130985 |
CLAYDEAN ELECTRIC COMPANY | ER | P | 06/12/2015 | Panel MDF and transformer feeding MDF ok----need to check line side connection at panel feeding transformer----ceiling in lobby and reception ok | SHELBY | SHELBY | | ER | P | 4972369 |
CLAYDEAN ELECTRIC COMPANY | EP | P | 06/11/2015 | need to bond to building steel from transformer, | GARYL | GARYL | | EP | P | 4971833 |
MECHONE, INC. | H= | C | 01/07/2020 | MECH ONE MECHANICAL FINAL OK. | NANCY | NANCY | | H= | C | 6445594 |
PYRAMID MECHANICAL INC. | HE | L | 08/02/2017 | Renewed at 8/2/2017 11:14:04 AM | BECKYA | BECKYA | | HE | L | 5583472 |
PYRAMID MECHANICAL INC. | H= | P | 08/13/2015 | MECHANICAL FINAL OK PENDING REVISED PRINTS BEING APPROVED BY REGIONAL BUILDING. | NANCY | NANCY | | H= | P | 5014006 |
PYRAMID MECHANICAL INC. | H= | R | 07/30/2015 | PROVIDE CALL AHEAD NUMBER AND NAME OF SOMEONE THAT WILL BE ON SITE FOR NEXT INSPECTION. PROVIDE REVISED/APPROVED PRINTS AS REQUESTED ON ROUGH INSPECTION. PERMANENTLY LABEL ALL EQUIPMENT AS PER NOTE ON SHEET M2.1. CONDENSATE TERMINATES WHERE? CEILING ALL CLOSED UP, CAN NOT SEE DRAIN LINE ABOVE CEILING OR WHERE IT TERMINATES. | NANCY | NANCY | | H= | R | 5004373 |
PYRAMID MECHANICAL INC. | HRP | C | 06/10/2015 | 350 LB TEST OK ON LINES FOR AHU-1 AND AHU-2. OK TO INSULATE. NO ROOF YET. NEED REVISED/APPROVED PRINTS SHOWING LOCATION OF UNITS AND SUPPLY DUCTS WITH DIFFUSERS INSTALLED. | NANCY | NANCY | | HRP | C | 4970626 |
OLSON PLUMBING & HEATING COMPANY | P= | C | 01/31/2020 | Replaced fixtures only. | SAMH | SAMH | | P= | C | 6470532 |