ALEXANDHER BUILDING CO, INC. | B= | C | 08/25/2015 | All other required Final inspections are complete. (This is a computer generated result) | BRIANB | BRIANB | | B= | C | 5021307 |
ALEXANDHER BUILDING CO, INC. | B= | P | 08/18/2015 | all corrections completed from previous inspection. Additional Inspections Required (computer generated): External Agency Inspection Z= by WOODLAND PARK is not Completed yet (Contact: Deidra Arnold at 719-687-5202 or Lisa Parnell at 719-687-5209). | BRIANB | BRIANB | | B= | P | 5016692 |
ALEXANDHER BUILDING CO, INC. | B= | P | 08/17/2015 | still need ANSI striping at parking spaces / all other corrections okay / pending MEP inspections -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet, External Agency Inspection Z= by WOODLAND PARK is not Completed yet (Contact: Deidra Arnold at 719-687-5202 or Lisa Parnell at 719-687-5209), AIR TECH MECHANICAL INC Mechanical Final Inspection is not Completed yet. | BRIANB | BRIANB | | B= | P | 5015852 |
ALEXANDHER BUILDING CO, INC. | B= | P | 08/14/2015 | missing signage posted at entry-exit doors THESE DOORS TO REMAIN UNLOCKED WHILE BUILDING OCCUPIED / need ANSI required signage at parking spaces / door hardware incomplete at rear entry- exit doors / need plan revision and inspection to inspect canopy bolting / need to complete MEP and external inspections | BRIANB | BRIANB | | B= | P | 5015068 |
ALEXANDHER BUILDING CO, INC. | BSP | P | 08/13/2015 | PLAN SPLICE FEE: $50 by: JIMA for Construction: splice added door at room 108 only | JIMA | JIMA | | BSP | P | 5013967 |
AIRTECH MECHANICAL, INC. | BSP | T | 08/13/2015 | PAID (REC#1280739) PLAN SPLICE FEE: $50 by: DALEH for Mechanical | DALEH | DALEH | | BSP | T | 5013955 |
ALEXANDHER BUILDING CO, INC. | BSP | T | 08/13/2015 | PAID (REC#1280738) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: New splice change water heater , moved water heater and floor drain. | TCRIPPEN | TCRIPPEN | | BSP | T | 5013886 |
ALEXANDHER BUILDING CO, INC. | BFR | P | 07/10/2015 | interior shear walls OK; letter on file for 1" thick plywood revised to 5/8" plywood; need other roughs completed | DAN | DAN | | BFR | P | 4990606 |
ALEXANDHER BUILDING CO, INC. | BSP | P | 07/07/2015 | additional framing on soffit per Architect on file. | DAN | DAN | | BSP | P | 4987902 |
ALEXANDHER BUILDING CO, INC. | BLA | C | 07/02/2015 | | DAN | DAN | | BLA | C | 4985962 |
ALEXANDHER BUILDING CO, INC. | BFR | P | 07/01/2015 | soffet, furred and bathroom wall framing OK pending MEPs; need shear walls completed; need revised details for soffits sheet A-1.1 and letter to OK 5/8" plywood at top into bottom cord of ceiling joists, revised hold down hardware,
| DAN | DAN | | BFR | P | 4984742 |
ALEXANDHER BUILDING CO, INC. | BLA | P | 07/01/2015 | OK except south side tower floor roof area. not ready. recall | DAN | DAN | | BLA | P | 4984733 |
ALEXANDHER BUILDING CO, INC. | BFT | C | 06/24/2015 | strip footers/pads for interior shear walls OK | DAN | DAN | | BFT | C | 4979528 |
ALEXANDHER BUILDING CO, INC. | BSP | T | 06/09/2015 | PAID (REC#1266790) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: shear wall detail | SHELLEY | SHELLEY | | BSP | T | 4969654 |
EL PASO ELECTRIC, LLC. | E= | C | 08/17/2015 | | MIKEC | MIKEC | | E= | C | 5015846 |
EL PASO ELECTRIC, LLC. | E= | P | 08/11/2015 | COOLERS NOT IN YET | MIKEC | MIKEC | | E= | P | 5012061 |
EL PASO ELECTRIC, LLC. | ER | C | 07/30/2015 | CEILINGS | MIKEC | MIKEC | | ER | C | 5004136 |
EL PASO ELECTRIC, LLC. | ER | P | 07/09/2015 | REST OF WALLS | MIKEC | MIKEC | | ER | P | 4989415 |
EL PASO ELECTRIC, LLC. | ER | P | 06/26/2015 | ENTRY AND DINING ROOM WALLS | MIKEC | MIKEC | | ER | P | 4981348 |
EL PASO ELECTRIC, LLC. | ER | P | 06/25/2015 | WEST SIDE HARDLID | MIKEC | MIKEC | | ER | P | 4980233 |
AIRTECH MECHANICAL, INC. | H= | C | 08/17/2015 | Corrections made. | STEVEC | STEVEC | | H= | C | 5015953 |
DRUMMOND PLUMBING LLC | H= | C | 08/07/2015 | NEED GAS PLAN REVISED SHOWING NEW LOCATION - NEED B VENT BRACED AT WATER HEATER | JERRYF | JERRYF | | H= | C | 5009950 |
AIRTECH MECHANICAL, INC. | H= | P | 08/07/2015 | NEED COOLER COMPLETED - B VENT BRACED AT WH - REVIEW ALL PREVIOUS NOTES | JERRYF | JERRYF | | H= | P | 5009938 |
AIRTECH MECHANICAL, INC. | H= | P | 08/06/2015 | TAB REPORT RECEIVED - NEED OTHER NOTES ADDRESSED FOR FINAL | JERRYF | JERRYF | | H= | P | 5008921 |
AIRTECH MECHANICAL, INC. | H= | P | 07/31/2015 | NEED THE FOLLOWING FOR FINAL - SCREEN RESTROOM EXHAUST CAP ON ROOF - SOMEONE TO CLAIM WATER HEATER VENT ON PERMIT ALSO EXTEND B VENT ABOVE PARAPET ON ROOF AND VENT COMPLETED AT WATER HEATER - COOLER COMPLETED AND INSPECTED - NEED STAMPED APPROVED REVISED PLAN FOR WATER HEATER LOCATION AND CO2 TANK RELOCATED - REST OK | JERRYF | JERRYF | | H= | P | 5005311 |
AIRTECH MECHANICAL, INC. | HD | P | 07/29/2015 | ABOVE CEILING OK - NOTES REMOTE INDICATORS AND SMOKE SHUTDOWN HAVE BEEN INSTALLED - BY FINAL REVISE PLAN SHOWING NEW WATER HEATER AND CO2 TANK RELOCATION - TAB REPORT | JERRYF | JERRYF | | HD | P | 5003266 |
DRUMMOND PLUMBING LLC | HI | C | 07/10/2015 | 1" to water heater in lieu of 3/4" ok. | DICK | DICK | | HI | C | 4990666 |
DRUMMOND PLUMBING LLC | P= | C | 08/07/2015 | | DICK | DICK | | P= | C | 5010188 |
DRUMMOND PLUMBING LLC | PTO | C | 07/10/2015 | per plan. | DICK | DICK | | PTO | C | 4990671 |
DRUMMOND PLUMBING LLC | PB | C | 06/18/2015 | remodel | TED | TED | | PB | C | 4975796 |