BOB MCGRATH CONSTRUCTION LLC | B= | C | 01/31/2018 | corrected | NATHAN | NATHAN | | B= | C | 5752989 |
BOB MCGRATH CONSTRUCTION LLC | BE | L | 01/25/2018 | Renewed at 1/25/2018 9:20:23 PM. Last free ext. | REBECCA | REBECCA | | BE | L | 5748322 |
BOB MCGRATH CONSTRUCTION LLC | B= | R | 03/17/2017 | homeowner states not ready smoke and CO removed / recall when ready | NATHAN | NATHAN | | B= | R | 5444201 |
BOB MCGRATH CONSTRUCTION LLC | BE | L | 01/24/2017 | Renewed at 1/24/2017 2:14:55 PM | MINDY | MINDY | | BE | L | 5397271 |
BOB MCGRATH CONSTRUCTION LLC | B= | R | 05/17/2016 | Need to install smoke detectors for all upstairs bedrooms / Stairs isolated in basement per Brian B comments | NICK | NICK | | B= | R | 5201265 |
BOB MCGRATH CONSTRUCTION LLC | BFR | P | 09/29/2015 | corrections from previous inspection okay / framing okay / pending completion of other rough inspections / isolate non floating & non bearing wall at bottom of new stairs - check at final inspection | BRIANB | BRIANB | | BFR | P | 5046757 |
BOB MCGRATH CONSTRUCTION LLC | BFT | C | 09/24/2015 | interior pad at family room okay | BRIANB | BRIANB | | BFT | C | 5043786 |
BOB MCGRATH CONSTRUCTION LLC | BSP | T | 09/23/2015 | PAID (REC#1288963) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELLEY added stair and removed walls in kitchen | SHELLEY | SHELLEY | | BSP | T | 5042735 |
BOB MCGRATH CONSTRUCTION LLC | BFR | P | 09/03/2015 | infill framing at stairwell inspection only / need min. 3" of bearing at east masonry wall for new LVL beams installed / other infill framing at stairwell okay only / still need to inspect all other framing for remodel / also need to revise plans to include all new work in home by next inspection / pending other rough inspections | BRIANB | BRIANB | | BFR | P | 5029993 |
THE CORE ELECTRIC GROUP, LLC | E= | C | 02/08/2016 | CORRECTIONS MADE----- | BRIAN | BRIAN | | E= | C | 5129819 |
THE CORE ELECTRIC GROUP, LLC | E= | R | 01/25/2016 | NEED AFCI AND GFCI ON KITCHEN ISLAND ---WET BAR------2 KO PLUGS IN SUB PANEL----50 AMP AC --OK--30 AMP AC --OK | BRIAN | BRIAN | | E= | R | 5122835 |
THE CORE ELECTRIC GROUP, LLC | ES | C | 01/25/2016 | Residential Underground: 200 AMP 3-W EXST RES------OK NO ACTION NEEDED--- | BRIAN | BRIAN | | ES | C | 5122826 |
THE CORE ELECTRIC GROUP, LLC | ES | P | 10/16/2015 | Residential Underground: PRE RELEASE ONLY----- | BRIAN | BRIAN | | ES | P | 5058972 |
THE CORE ELECTRIC GROUP, LLC | ER | P | 09/28/2015 | KITCHEN AND DINING AREA---J BOX IN WALL AT THE POWDER ROOM NEEDS TO DEMO OR RELOCATE---VERIFY ON NEXT INSP------ | BRIAN | BRIAN | | ER | P | 5045887 |
THE FIREPLACE DOCTOR, INC. | H= | C | 05/13/2016 | Mantle clearance OK | MARKB | MARKB | | H= | C | 5199052 |
GENE'S HEATING AND AIR LLC | H= | C | 05/13/2016 | No door to laundry and boiler room has electric heat | MARKB | MARKB | | H= | C | 5199041 |
ADEPT PLUMBING & HEATING LLC | H= | C | 05/12/2016 | | MARKB | MARKB | | H= | C | 5197633 |
GENE'S HEATING AND AIR LLC | H16 | C | 05/12/2016 | Homeowner has verified mech room drain goes to sewer | MARKB | MARKB | | H16 | C | 5197628 |
GENE'S HEATING AND AIR LLC | H= | P | 01/26/2016 | Condensate for basement furnace needs to go to an approved building drain, Old mech room with water heater in it needs a permanent heat source (old boilers that heated room are now off line) and upstairs laundry needs makeup air. Note: 12" damper OSA to return, 1025 CFM range hood and gas to old boilers disconnected | MARKB | MARKB | | H= | P | 5123374 |
THE FIREPLACE DOCTOR, INC. | HV | C | 11/19/2015 | Fireplace and vent in dining room OK. | MARKB | MARKB | | HV | C | 5082492 |
THE FIREPLACE DOCTOR, INC. | HV | L | 11/18/2015 | Left message at 12:28. Waited at home until 1:00 | MARKB | MARKB | | HV | L | 5081282 |
GENE'S HEATING AND AIR LLC | HRP | C | 10/09/2015 | At final - condensate removal | MARKB | MARKB | | HRP | C | 5054342 |
GENE'S HEATING AND AIR LLC | HRR | C | 10/09/2015 | Further research required for makeup air for 1025 kitchen range hood. By final - combustion air for basement furnace and makeup air for range hood and dryer. | MARKB | MARKB | | HRR | C | 5054341 |
ADEPT PLUMBING & HEATING LLC | HI | P | 10/06/2015 | Still need to inspect gas line to master fireplace. Pressure test OK on whole house repipe. Note: 2" blk - 617k @ 200' - stub at main floor and tee in attic for future fireplaces | MARKB | MARKB | | HI | P | 5051625 |
GENE'S HEATING AND AIR LLC | HRP | R | 09/23/2015 | Basement lineset does not run to the outside. Upstairs lineset: needs nail protection and repair all tears in lineset insulation. Pressure test OK. | MARKB | MARKB | | HRP | R | 5042458 |
GENE'S HEATING AND AIR LLC | H= | R | 09/23/2015 | Not ready. | MARKB | MARKB | | H= | R | 5042456 |
GENE'S HEATING AND AIR LLC | HRR | T | 09/23/2015 | PAID (REC#1289109): Not ready - No partial inspections on residential permits( call when all rough work has been completed) Basement furnace and duct work not installed yet. What is the CFM of kitchen range hood? Is outside air being installed to furnace returns? Basement furnace, A/C and mini-split need to be permitted. No gas inspection, piping or permit. Remodel needs electrical permit attached. Will need duct leakage report by final. Where is dryer vent? | MARKB | MARKB | | HRR | T | 5042451 |
ADEPT PLUMBING & HEATING LLC | P= | C | 01/26/2016 | ok | DICK | DICK | | P= | C | 5123086 |
ADEPT PLUMBING & HEATING LLC | PTO | C | 09/08/2015 | correction made. need AAV at lav for final. washer and water heater on permit J82732. | DICK | DICK | | PTO | C | 5031616 |
ADEPT PLUMBING & HEATING LLC | PTO | P | 08/28/2015 | need isolation valve for pot filler, can not wet vent toilet through kitchen, add 1 washer to scope of work, need permits for water heater and vent, rest ok. | TAYLOR | TAYLOR | | PTO | P | 5025007 |