SCHEINER COMMERCIAL GROUP, INC. | B= | C | 11/09/2015 | | BOBF | BOBF | | B= | C | 5075133 |
SCHEINER COMMERCIAL GROUP, INC. | B= | P | 08/28/2015 | Mens toilet room needs 42" grab bar -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), BARE TUB & STOVE COMPANY Mechanical Final Inspection is not Completed yet, HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet. | BERTW | BERTW | | B= | P | 5024865 |
SCHEINER COMMERCIAL GROUP, INC. | BIN | C | 08/25/2015 | | BERTW | BERTW | | BIN | C | 5021862 |
SCHEINER COMMERCIAL GROUP, INC. | BFR | C | 08/11/2015 | Balance of framing at front of store is complete. | TOMG | TOMG | | BFR | C | 5012273 |
SCHEINER COMMERCIAL GROUP, INC. | BIN | P | 08/04/2015 | Partial insulation at front entry | TOMG | TOMG | | BIN | P | 5007318 |
SCHEINER COMMERCIAL GROUP, INC. | BFR | P | 08/04/2015 | Partial frame at front entry | TOMG | TOMG | | BFR | P | 5007315 |
SCHEINER COMMERCIAL GROUP, INC. | BFR | P | 08/01/2015 | Front soffit and fireplace framing | TOMG | TOMG | | BFR | P | 5006084 |
SCHEINER COMMERCIAL GROUP, INC. | BFR | P | 07/29/2015 | Fireplace framing covered at time of inspection. Need fireplace permit and mechanical inspection also. | TOMG | TOMG | | BFR | P | 5003787 |
SCHEINER COMMERCIAL GROUP, INC. | BSP | P | 07/07/2015 | Front interior ceiling soffits ok pending other rough inspections. | TOMG | TOMG | | BSP | P | 4987853 |
SCHEINER COMMERCIAL GROUP, INC. | BFR | P | 07/01/2015 | Partial wall and ceiling frame . Fireplace framing , front soffits, and storefront not inspected. Do not install hard lids until the mechanical inspector has given approval. | TOMG | TOMG | | BFR | P | 4984878 |
BIBLE ELECTRIC, INC. | E= | C | 08/26/2015 | | BRET | BRET | | E= | C | 5023204 |
BIBLE ELECTRIC, INC. | ER | C | 08/05/2015 | | BRET | BRET | | ER | C | 5008877 |
BIBLE ELECTRIC, INC. | EP | C | 07/24/2015 | panels and transformer ok, handle ties by final | BRET | BRET | | EP | C | 5000744 |
BIBLE ELECTRIC, INC. | ER | P | 07/24/2015 | break room ceiling ok | BRET | BRET | | ER | P | 5000741 |
BIBLE ELECTRIC, INC. | ER | P | 07/02/2015 | hard lids ok, note 18x18 min for box above lid front of store. | BRET | BRET | | ER | P | 4985978 |
BIBLE ELECTRIC, INC. | ER | P | 06/26/2015 | walls only | GARYL | GARYL | | ER | P | 4981733 |
BIBLE ELECTRIC, INC. | ESL | P | 06/12/2015 | for cashwrap, feeders for panels, and L33 | SHELBY | SHELBY | | ESL | P | 4972523 |
HVAC SOLUTIONS, INC. | H= | C | 09/08/2015 | MECHANICAL FINAL OK. TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 5031352 |
BARE TUB & STOVE | H= | C | 08/28/2015 | FIREPLACE FINAL OK. PER BERT W. SCREEN IS IN PLACE. | NANCY | NANCY | | H= | C | 5024933 |
HVAC SOLUTIONS, INC. | H= | P | 08/26/2015 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5023110 |
HVAC SOLUTIONS, INC. | H= | P | 08/25/2015 | SCREEN RETURN AIR AS PER PRINTS. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5021839 |
BARE TUB & STOVE | H= | P | 08/25/2015 | INSTALL SCREEN OR DOOR PER NOTE 10 ON INSTALLATION DO'S AND DONT'S. | NANCY | NANCY | | H= | P | 5021828 |
HARMON - BONDED PLUMBING & HEATING, INC. | H= | C | 08/25/2015 | GAS FINAL OK. | NANCY | NANCY | | H= | C | 5021764 |
BARE TUB & STOVE | H= | P | 07/30/2015 | FIREBOX FOR FIREPLACE OK, OK TO COVER. NO INSERT YET. | NANCY | NANCY | | H= | P | 5004742 |
HARMON - BONDED PLUMBING & HEATING, INC. | H= | P | 07/23/2015 | GAS FINAL OK PENDING FIREPLACE CONTRACTOR BEING ATTACHED TO PERMIT. | NANCY | NANCY | | H= | P | 4999448 |
HARMON - BONDED PLUMBING & HEATING, INC. | HI | C | 07/23/2015 | 10 LB TEST OK TO FIREPLACE. INSTALLED AS PER PRINTS. | NANCY | NANCY | | HI | C | 4999444 |
HVAC SOLUTIONS, INC. | HD | P | 07/01/2015 | INSULATION ABOVE CEILING OK. | NANCY | NANCY | | HD | P | 4985194 |
HARMON - BONDED PLUMBING & HEATING, INC. | HI | P | 06/29/2015 | 10 LB TEST OK. INSTALLED AS PER PRINTS. NEED TO SEE CONNECTION AT FIREPLACE BEFORE SHEET ROCK IS INSTALLED. | NANCY | NANCY | | HI | P | 4982955 |
HVAC SOLUTIONS, INC. | H16 | C | 06/29/2015 | NEED WHOEVER IS INSTALLING THE FIREPLACE TO ATTACH TO PERMIT OR ADD TO SCOPE OF WORK. | NANCY | NANCY | | H16 | C | 4982233 |
HVAC SOLUTIONS, INC. | HD | P | 06/26/2015 | ROUGH DUCTS AND EXHAUST ABOVE CEILING OK. OK TO WRAP DUCTS. | NANCY | NANCY | | HD | P | 4981893 |
HARMON - BONDED PLUMBING & HEATING, INC. | P= | C | 08/26/2015 | ALL TO PLAN , TEMPERING AT PUBLIC LAVS | GABE | GABE | | P= | C | 5023054 |
HARMON - BONDED PLUMBING & HEATING, INC. | PTO | C | 06/29/2015 | TOP OUT TO PLAN , WATER HEATER IN . NEED TO SEE VENT TERMINATION BY FINAL | GABE | GABE | | PTO | C | 4983050 |
HARMON - BONDED PLUMBING & HEATING, INC. | PB | C | 06/10/2015 | DWV ON TEST . BASE COMPLETE | GABE | GABE | | PB | C | 4970300 |
HARMON - BONDED PLUMBING & HEATING, INC. | PB | P | 06/09/2015 | DESIGN OK , LOST TEST | GABE | GABE | | PB | P | 4970146 |