COMMERCIAL INTERIOR SPECIALISTS, LLC. | B= | C | 05/19/2016 | | JOHN | JOHN | | B= | C | 5203869 |
COMMERCIAL INTERIOR SPECIALISTS, LLC. | BE | L | 03/21/2016 | Renewed at 3/21/2016 3:33:58 PM | RITA | RITA | | BE | L | 5159576 |
HIGH MOUNTAIN ELECTRIC INC. | BSP | P | 02/11/2016 | PLAN SPLICE: (No Fee) by: SHELBY for Electrical: as builts to address inspector comments | SHELBY | SHELBY | | BSP | P | 5132399 |
COMMERCIAL INTERIOR SPECIALISTS, LLC. | B= | P | 08/21/2015 | met with mike 339-2911- need all other inspections completed -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), A.S.A.P HEATING AND COOLING Mechanical Final Inspection is not Completed yet, HIGH MOUNTAIN ELECTRIC INC. Electrical Final Inspection is not Completed yet, M.D. SERVICE PLUMBING Plumbing Final Inspection is not Completed yet. | BLAKE | BLAKE | | B= | P | 5020183 |
HIGH MOUNTAIN ELECTRIC INC. | BSP | T | 07/23/2015 | PAID (REC#1282335): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Change of 1 RTU to 2 Furnaces | SHELBY | SHELBY | | BSP | T | 4999191 |
COMMERCIAL INTERIOR SPECIALISTS, LLC. | BFR | P | 06/25/2015 | wall and ceiling framing okay at restroom / still need fire stop / still need to inspect north end of wall frame between yoga rooms / reviewed min 60" of clearance at toilet to sink in restroom with site rep / need to finish other rough inspections | BRIANB | BRIANB | | BFR | P | 4980381 |
COMMERCIAL INTERIOR SPECIALISTS, LLC. | BFR | R | 06/24/2015 | need to finish wall framing between yoga rooms / need to finish wall framing and frame for lid in hall bath / fire stop / need min. 60" clearance at hall bath toilet / need to finish other rough insp. | BRIANB | BRIANB | | BFR | R | 4979618 |
HIGH MOUNTAIN ELECTRIC INC. | E= | C | 02/12/2016 | | BRET | BRET | | E= | C | 5133159 |
HIGH MOUNTAIN ELECTRIC INC. | E= | P | 08/25/2015 | re-submit plans with radiant heat and 2 air handling units. no rtu, 100 amp breaker for panel R1 . 80 amp indicated on plans. | BRET | BRET | | E= | P | 5021528 |
HIGH MOUNTAIN ELECTRIC INC. | E= | R | 08/21/2015 | need approved plans on site, open box above door yoga 2, heaters do not have definite off switch install disconnects. loose receptacle bathroom, need access to air handle ceiling of yoga room and to new equipment on roof, e re-install gec to ground rods removed please re-install and protect with pvc, label voltage and fault current on new panel plug and and switch cover on handi box side of existing panel complete re-inspect | BRET | BRET | | E= | R | 5019474 |
HIGH MOUNTAIN ELECTRIC INC. | ER | P | 07/02/2015 | yoga walls | BRET | BRET | | ER | P | 4985402 |
HIGH MOUNTAIN ELECTRIC INC. | ER | P | 06/23/2015 | walls partial see plans hard lid ok in same area as walls | BRET | BRET | | ER | P | 4978500 |
A.S.A.P HEATING AND COOLING | H= | C | 04/19/2016 | CORRECTIONS VERIFIED BY PICTURE ALL OK | JERRYF | JERRYF | | H= | C | 5179514 |
A.S.A.P HEATING AND COOLING | H= | P | 04/13/2016 | TAB REPORT RECEIVED STILL NEED OTHER ITEMS ADDRESSED PER PREVIOUS NOTES | JERRYF | JERRYF | | H= | P | 5175659 |
A.S.A.P HEATING AND COOLING | HE | C | 02/03/2016 | | KENYATTA | KENYATTA | | HE | C | 5127377 |
A.S.A.P HEATING AND COOLING | H= | P | 08/28/2015 | NEED THE FOLLOWING FOR FINAL COMPLETION - INSULATION SHIELD ON WH FLUE - TAG CONDENSER WITH UNIT NUMBER - TAB REPORT SHOWING ALL CFM REQUIREMENTS AND OSA READINGS | JERRYF | JERRYF | | H= | P | 5024613 |
DAVIS GAS SHOP INC | H= | C | 08/20/2015 | gas line to water heaters ok | DICK | DICK | | H= | C | 5018571 |
DAVIS GAS SHOP INC | HI | C | 08/20/2015 | private gas meter, new gas line to water heaters ok. | DICK | DICK | | HI | C | 5018569 |
DAVIS GAS SHOP INC | HI | R | 08/18/2015 | GC not on site, could not find revised plan showing pipe sizes that are shown on approved plan, also question where 1 1/2" X 1" tee is located, 1st two fittings after meter belong to CSPU. | DICK | DICK | | HI | R | 5016981 |
DAVIS GAS SHOP INC | HI | P | 08/17/2015 | need approved plan on site. 10 psi ok on 1" line from 1 1/2" line at meter. | DICK | DICK | | HI | P | 5016023 |
A.S.A.P HEATING AND COOLING | HD | P | 08/11/2015 | ABOVE CEILING SUPPLY DUCT ON F1 OK TO WRAP ONLY | JERRYF | JERRYF | | HD | P | 5011942 |
MD SERVICE PLUMBING, INC. | P= | C | 08/25/2015 | remodel | TED | TED | | P= | C | 5021397 |
MD SERVICE PLUMBING, INC. | PTO | C | 07/09/2015 | water and dwv ok in walls, will check vent through roof and aav at laundry room sink at final | TED | TED | | PTO | C | 4989446 |
MD SERVICE PLUMBING, INC. | PB | C | 06/23/2015 | per plan. | DICK | DICK | | PB | C | 4978680 |