NEW VISION CUSTOM BUILDERS | B= | C | 02/04/2016 | All other required Final inspections are complete. (This is a computer generated result) | GEORGEG | GEORGEG | | B= | C | 5128285 |
NEW VISION CUSTOM BUILDERS | B= | P | 02/03/2016 | address posted. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | GEORGEG | GEORGEG | | B= | P | 5127576 |
NEW VISION CUSTOM BUILDERS | BSP | P | 01/14/2016 | deck frame with posts okay | BOBF | BOBF | | BSP | P | 5116731 |
NEW VISION CUSTOM BUILDERS | B= | P | 12/14/2015 | patio door and rear door has barricades / eng. on file for LVL -- / install house # on house Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection HD= by HEALTHDEPT is not Completed yet. | DALE | DALE | | B= | P | 5098554 |
NEW VISION CUSTOM BUILDERS | BFR | P | 10/16/2015 | need to complete LVL support at stairs per eng letter / okay to drywall main level | BOBF | BOBF | | BFR | P | 5060024 |
NEW VISION CUSTOM BUILDERS | BIN | C | 10/16/2015 | | BOBF | BOBF | | BIN | C | 5060023 |
NEW VISION CUSTOM BUILDERS | BFR | R | 10/09/2015 | brace west gable end / 2k at bath / plans do not show hangers at stair / foam low volt holes / ok to insulate | DALE | DALE | | BFR | R | 5054758 |
NEW VISION CUSTOM BUILDERS | BLA | C | 10/06/2015 | | BOBF | BOBF | | BLA | C | 5051978 |
NEW VISION CUSTOM BUILDERS | BFT | P | 09/15/2015 | 2 piers for front landing and 4 piers for deck on west side okay | BOBF | BOBF | | BFT | P | 5036826 |
NEW VISION CUSTOM BUILDERS | BFI | P | 07/16/2015 | 2 layers of R10 ok at walkout | ED | ED | | BFI | P | 4994250 |
NEW VISION CUSTOM BUILDERS | BFD | P | 07/15/2015 | drain ok, need foundation insulation installed at walkout, drain daylights to the west | ED | ED | | BFD | P | 4994144 |
NEW VISION CUSTOM BUILDERS | BFN | C | 07/10/2015 | eufer ground ok, foundation design and soils on file, (drain at entire), interior pads ok | ED | ED | | BFN | C | 4991122 |
NEW VISION CUSTOM BUILDERS | BFT | P | 06/26/2015 | 1500 psf, interior pads at foundation wall inspection | ED | ED | | BFT | P | 4981515 |
HIGH MOUNTAIN ELECTRIC INC. | E= | C | 12/07/2015 | | CRAIG | CRAIG | | E= | C | 5093469 |
HIGH MOUNTAIN ELECTRIC INC. | E= | R | 12/02/2015 | install smoke in living room -------- need ladder to check back porch outlet ( no deck ) ---------- a/c pre wire | CRAIG | CRAIG | | E= | R | 5090438 |
HIGH MOUNTAIN ELECTRIC INC. | ES | C | 12/02/2015 | Residential Underground: 200 amp 3/w new res seal meter | CRAIG | CRAIG | | ES | C | 5090427 |
HIGH MOUNTAIN ELECTRIC INC. | ES | R | 10/09/2015 | attach to ufer | MATTHEW | MATTHEW | | ES | R | 5054671 |
HIGH MOUNTAIN ELECTRIC INC. | ER | C | 09/23/2015 | no mcc 10/3 to dryer unfinished basement no cen vac | CRAIG | CRAIG | | ER | C | 5042977 |
HIGH MOUNTAIN ELECTRIC INC. | EUG | C | 08/26/2015 | service lateral from ped to home | MATTHEW | MATTHEW | | EUG | C | 5022887 |
HIGH MOUNTAIN ELECTRIC INC. | EUG | L | 08/25/2015 | canceled by contractor | MATTHEW | MATTHEW | | EUG | L | 5021669 |
PREMIER MECHANICAL | H= | C | 12/14/2015 | Change letter received, heat final ok. | MARK | MARK | | H= | C | 5097817 |
PREMIER MECHANICAL | H= | P | 12/08/2015 | I can't find an equipment change letter. Rest of the corrections have been completed. Plans call for a 75K furn and a 90K has been installed. | MARK | MARK | | H= | P | 5094072 |
PREMIER MECHANICAL | H= | T | 12/04/2015 | PAID (REC#1303005) Still need to undercut b/r doors, still need make up air to laundry, still need equipment change letter. T&P drain pipe has been installed. Do not reschedule until all corrections have been made. | MARK | MARK | | H= | T | 5091719 |
PREMIER MECHANICAL | H= | P | 11/30/2015 | Need to undercut 2 ea. bedroom doors for return path, missing make up air to laundry rm, missing T&P valve drain pipe for water htr. need equip change letter, see previous inspection notes. Note: Unf. bsmnt, no a/c, has OSA to return. | MARK | MARK | | H= | P | 5088253 |
PREMIER MECHANICAL | HC | C | 10/08/2015 | RELEASE METER | MICHAELS | MICHAELS | | HC | C | 5053093 |
PREMIER MECHANICAL | HI | C | 10/08/2015 | 10# test ok. 1 1/4" main to furn, w/h, range, bbq, future fp. BY FINAL: need 2lb. letter, reg and labels. | MICHAELS | MICHAELS | | HI | C | 5053089 |
PREMIER MECHANICAL | HRR | C | 10/08/2015 | Rough ok. Note: unfinished basement, 6" osa, no a/c. BY FINAL: need furnace change letter. | MICHAELS | MICHAELS | | HRR | C | 5053088 |
PREMIER MECHANICAL | HRR | R | 10/06/2015 | Still not ready, supply missing transition, vent not complete to appliances, b-vent lacks clearance to framing, return not tied into furnace, Re-inspect all. Waived Trip Fee Jack | MICHAELS | MICHAELS | | HRR | R | 5051229 |
PREMIER MECHANICAL | HI | R | 10/01/2015 | Entire gas line is undersized with meter at road. | MICHAELS | MICHAELS | | HI | R | 5048510 |
PREMIER MECHANICAL | HRR | R | 10/01/2015 | Not ready, duct work not complete, trip fee waived. | MICHAELS | MICHAELS | | HRR | R | 5048509 |
PREMIER MECHANICAL | HO | C | 08/12/2015 | 10 lb test ok. Note: Replaced existing riser at rebuild (Home) Has 1 1/4" PE from house to meter at road. | MARK | MARK | | HO | C | 5012949 |
PREMIER MECHANICAL | HO | L | 08/10/2015 | CANCELED BY CONTRACTOR ON CALL AHEAD.. | LUKE | LUKE | | HO | L | 5011252 |
CASCADE PLUMBING & HEATING | P= | C | 12/10/2015 | | TIM | TIM | | P= | C | 5096352 |
CASCADE PLUMBING & HEATING | P= | P | 12/04/2015 | need proof of potable water install aav at kit....e-mail water cert and send pics of aav w/ re-call | TIM | TIM | | P= | P | 5092190 |
CASCADE PLUMBING & HEATING | PTO | C | 10/09/2015 | corrections made | TIM | TIM | | PTO | C | 5053876 |
CASCADE PLUMBING & HEATING | PTO | P | 10/07/2015 | low test h2o, adjust grade on shower drain | TIM | TIM | | PTO | P | 5052588 |
CASCADE PLUMBING & HEATING | PTO | R | 10/06/2015 | NOT READY , RE INSPECT ALL , DO NOT CALL IN UNLESS 100% READY AND ON TEST THROUGHOUT | GABE | GABE | | PTO | R | 5051726 |
CASCADE PLUMBING & HEATING | PTO | T | 10/01/2015 | PAID (REC#1291405) not ready finish dwv and h2o, also plumb to the 2012 ipc | TIM | TIM | | PTO | T | 5048660 |
CASCADE PLUMBING & HEATING | PTO | T | 09/18/2015 | PAID (REC#1290485) not ready....not even close | TIM | TIM | | PTO | T | 5039643 |
HOMEOWNER | PWO | P | 08/20/2015 | finish tracer wire...send pics w/ recall | TIM | TIM | | PWO | P | 5019188 |
CASCADE PLUMBING & HEATING | PB | C | 07/22/2015 | | TIM | TIM | | PB | C | 4998714 |
CASCADE PLUMBING & HEATING | PB | P | 07/20/2015 | NEED 30 INCHES FROM 3 INCH STACK TO NEXT DOWN STREAM FITTING , REST OK . NO WATER IN | GABE | GABE | | PB | P | 4996476 |