MAHLER GC GENERAL CONTRACTING COMPANY | B= | C | 04/15/2016 | | DAN | DAN | | B= | C | 5178045 |
MAHLER GC GENERAL CONTRACTING COMPANY | B= | R | 03/24/2016 | Building OK need plumbing final completed. Additional Inspections Required (computer generated): Floodplain Final Inspection is not Completed yet, CASCADE PLUMBING & HEATING Plumbing Final Inspection is not Completed yet. | DAN | DAN | | B= | R | 5162011 |
MAHLER GC GENERAL CONTRACTING COMPANY | BSP | P | 03/02/2016 | PLAN SPLICE: (No Fee) by: DANM for Construction: Revisions to equipment platform on roof | DANM | DANM | | BSP | P | 5146564 |
PREMIER MECHANICAL | BSP | T | 03/02/2016 | PAID (REC#1317988) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice to add mechanical platform to pitched roof | DALEH | DALEH | | BSP | T | 5146490 |
MAHLER GC GENERAL CONTRACTING COMPANY | BSP | T | 03/01/2016 | PAID (REC#1316037) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: equipment platform on roof | SHELLEY | SHELLEY | | BSP | T | 5145075 |
MAHLER GC GENERAL CONTRACTING COMPANY | BIN | C | 09/30/2015 | R13 added in 2.5" furr metal studs west wall behind hood. still need mechanical rough completed. | DAN | DAN | | BIN | C | 5047458 |
MAHLER GC GENERAL CONTRACTING COMPANY | BFR | P | 09/28/2015 | framing OK pending other roughs completed. | DAN | DAN | | BFR | P | 5045549 |
INTERMOUNTAIN POWER SERVICES INC | E= | C | 03/15/2016 | | MIKEC | MIKEC | | E= | C | 5154820 |
INTERMOUNTAIN POWER SERVICES INC | E= | P | 03/10/2016 | gfi outlet behind fryer | MIKEC | MIKEC | | E= | P | 5152570 |
INTERMOUNTAIN POWER SERVICES INC | ER | P | 09/10/2015 | kitchen | MIKEC | MIKEC | | ER | P | 5033276 |
INTERMOUNTAIN POWER SERVICES INC | ER | L | 09/09/2015 | | MIKEC | MIKEC | | ER | L | 5032547 |
INTERMOUNTAIN POWER SERVICES INC | ESL | C | 08/20/2015 | KITCHEN SLAB | MIKEC | MIKEC | | ESL | C | 5019355 |
MAHLER GC GENERAL CONTRACTING COMPANY | FP= | C | 04/13/2016 | | KEITH | KEITH | BDA | FP= | C | 5175742 |
PREMIER MECHANICAL | H= | C | 03/22/2016 | OK -INTERLOCKS VERIFIED AND RAILING INSTALLED | JERRYF | JERRYF | | H= | C | 5159856 |
PREMIER MECHANICAL | H16 | C | 03/22/2016 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H16 | C | 5159753 |
PREMIER MECHANICAL | HD | P | 02/29/2016 | OK FOR WRAP BOTH LAYERS.. HAVE INSTRUCTIONS ON SITE NEXT INSPECTION AND TO BE TO INSTRUCTIONS ON WRAO. PLANS NEED REVISED FOR FAN ON PITCHED ROOF FOR ARCHITECTURAL AND MECHANICAL REVIEW FOR PLATFORMS AND RAILS, DUCT SIZE CHANGES ETC. | JON | JON | | HD | P | 5144786 |
PREMIER MECHANICAL | HD | P | 02/16/2016 | LIGHT TEST PERFORMED AT SHOP ON 6, GREASE DUCT - WILL NEED TEST ON CONNECTION AT HOOD AND OFFSET | JERRYF | JERRYF | | HD | P | 5134408 |
PREMIER MECHANICAL | HD | P | 12/31/2015 | ONE HORIZONTAL SEAM ABOVE HOOD HAS BEEN CALUKED. QUESTION IF HOOD IS GOING TO BE DROPPED BACK DOWN TO FLOOR BECAUSE GREASE DUCT HAS NOT BEEN INSPECTED. THERE IS NOT ENOUGH ROOM BETWEEN CEILING AND HOOD FOR INSTALLATION OR INSPECTION? ALSO ELECTRICAL INSPECTOR MAY HAVE ISSUE WITH NO ACCESS TO JUCTION BOXES 0N TOP OF HOOD. | JON | JON | | HD | P | 5108751 |
PREMIER MECHANICAL | HI | R | 12/31/2015 | NOT READY FOR FINAL | JON | JON | | HI | R | 5108745 |
PREMIER MECHANICAL | HD | P | 12/11/2015 | BEFORE RAISING HOOD TO CEILING NEED TOP OF STAINLESS STEEL SEALED TO SHEET ROCK TO PREVENT GREASE ACCESS - REST OK - BACK DOOR LOCK BOX CODE IS 2580 | JERRYF | JERRYF | | HD | P | 5096809 |
PREMIER MECHANICAL | H16 | C | 10/05/2015 | SPOKE WITH JAKE FROM MAHLER OVER ROOF ACCESS FOR TYPE ONE EXHAUST FAN. DISCUSSED ROOF PITCH AT 3/12 AND 4/12 AND ASSOCIATED REQUIREMENTS. CAT WALKS AND PLATFORMS AND GUARD RAILS. ALSO DISCUSSED 40" REQUIREMENT ABOVE HIGH SIDE OF ROOF FOR FAN TERMINATION. THIS MAY REQUIRE DETAILS ON A SHEETS. MUST CHECK WITH BUILDING INSPECTOR. | JON | JON | | H16 | C | 5050390 |
PREMIER MECHANICAL | HI | P | 09/24/2015 | NEED RELEASE FOR 2 LB SYSTEM. GAS OK ON INSIDE PIPING.. NEED TO SEE ANZUL VALVE AND REGULATOR IN ATTIC, NEED TO SEE MAKEUP AIR UNIT PIPING AND REGULATOR. NEED TO SEE REST OF THE PIPING EXTERIOR OF WALL AT COOK LINE. THIS HOOD IS TO BE A ZERO CLEARANCE HOOD AT ALL SIDES. DISCUSSED ALL ISSUES WITH ROOF ACCESS FOR FAN ON ROOF WITH CONTRACTOR PRIOR TO THIS INSPECTION. | JON | JON | | HI | P | 5043878 |
CASCADE PLUMBING & HEATING | P= | C | 04/12/2016 | correction made. | TAYLOR | TAYLOR | | P= | C | 5175283 |
CASCADE PLUMBING & HEATING | P= | P | 03/25/2016 | need wraps/ insulation for water lines under 3 comp sink, rest ok. | TAYLOR | TAYLOR | | P= | P | 5162816 |
CASCADE PLUMBING & HEATING | P= | L | 03/24/2016 | left message at 12:00, nobody on site at 12:30. | TAYLOR | TAYLOR | | P= | L | 5161703 |
CASCADE PLUMBING & HEATING | P= | L | 03/23/2016 | unsafe road conditions, cancelled at call ahead. | TAYLOR | TAYLOR | | P= | L | 5161184 |
CASCADE PLUMBING & HEATING | PTO | C | 09/25/2015 | water lines in wall ok, note- check wrap/insulation for water lines under 3 comp sink by final. | TAYLOR | TAYLOR | | PTO | C | 5044499 |
CASCADE PLUMBING & HEATING | PTO | P | 09/24/2015 | need to expose wrap/insulation for water lines, rest ok, note- aav floor sink for dishwasher. | TAYLOR | TAYLOR | | PTO | P | 5043643 |
CASCADE PLUMBING & HEATING | PB | C | 09/02/2015 | | TAYLOR | TAYLOR | | PB | C | 5029020 |
CASCADE PLUMBING & HEATING | PB | L | 09/01/2015 | field cancelled. | TAYLOR | TAYLOR | | PB | L | 5027845 |