GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 08/19/2016 | Colorado State Electrical final inspection report from Curt Elliott, 303-869-3444, on file for building "A" and "E" . Colorado State Plumbing final inspection report on file from Dennis Medina 303-896-3443 on file for buildings "A" and "E". | DAN | DAN | | B= | C | 5274110 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/06/2016 | 1) need State documentation for completion of electrical and plumbing inspections to complete RBD permit J77712. CS Fire has partial permit. | DAN | DAN | | BSP | P | 5263363 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/03/2016 | Walked roof area "E" and "A" OK. | DAN | DAN | | BSP | P | 5261252 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BBB | C | 08/03/2016 | Kumar letter for file for elevator bond beams. | DAN | DAN | | BBB | C | 5260304 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | C | 08/03/2016 | Kumar letter of observation from Duane Craft, #37553 on file, for structural steel, and light gauge framing completes the framing for permit J77712. | DAN | DAN | | BFR | C | 5260255 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFN | C | 08/03/2016 | Kumar letter of observation for foundation footer and wall steel at the link on file and completes the foundation for permit J77712, Duane Craft, #37553. | DAN | DAN | | BFN | C | 5260252 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | C | 07/29/2016 | link lath completes lath for permit. | DAN | DAN | | BLA | C | 5257997 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | C | 07/29/2016 | insulation at link OK. Completes insulation inspection | DAN | DAN | | BIN | C | 5257996 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/21/2016 | framing at link 2hr OK to complete rocking around doors. recall | DAN | DAN | | BFR | P | 5250870 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/21/2016 | Roof Parapet between area "A" and "B" OK to cover. | DAN | DAN | | BSP | P | 5250234 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 07/12/2016 | lath at link exterior wall west side OK; lathe east side lath at A2-7. line OK | DAN | DAN | | BLA | P | 5242577 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/08/2016 | 30" parapet at link OK to cover. | DAN | DAN | | BSP | P | 5241214 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/07/2016 | Hard lid framing in rooms A253, A254, 255, And A256. Hard lid framing rooms A164, A165, 166, and 167. Still need plumbing floor penetration protection completed and inspected. Need inspection of duct Framing at 90 minute door at link. | DAN | DAN | | BSP | P | 5239298 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 07/07/2016 | exterior wall wall R19 insulation at link OK. Reviewed needed parapet framing inspection with Rob and Lupe, drywall framing. | DAN | DAN | | BIN | P | 5239292 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/06/2016 | need to complete framing and rating for parapet wall at link. | DAN | DAN | | BSP | P | 5238768 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | R | 07/06/2016 | exterior wall insulation at link; missing insulation behind electrical boxes. Insulation not sandwiched between black iron and electrical conduit. Recall | DAN | DAN | | BIN | R | 5238762 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/24/2016 | exterior wall framing at link, A2C.2 and A2-B, grid A2-7 to A2-8; West wall stud welding still in progress. | DAN | DAN | | BFR | P | 5231099 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/15/2016 | Shaft liner at A2-7 between A2-B and A2C.2. Just below upper roof joists. floor level 121 Detail Grid A2-7 | DAN | DAN | | BFR | P | 5223412 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/25/2016 | Walked job with Ben Schlick. CAFCO Blaze-Shield II spray protection completed at building step, Kumar will be providing stamped letter to verify product, coverage, pull test, and density. Reviewed rated walls fire caulking still in progress. Walked smoke partitions rooms to be completed and called for next Tuesday. Looked at accessibility for staff bathrooms and break room. Bathroom vanity does not have clear space for knees or side approach and and encroaches into side wall requirements. 2hr wall at link to be changed by architect per Ben. Link foundation is completed. | DAN | DAN | | BSP | P | 5208458 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 05/13/2016 | PAID (REC#1335439): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Substitute spray applied fire-proofing at stepped building where 1-hr. hard lid was designed | MICHAELA | MICHAELA | | BSP | T | 5199536 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 05/05/2016 | Room H100 (Band Room) exterior wall R19 installation OK. | DAN | DAN | | BIN | P | 5192415 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 05/05/2016 | Upper roof wall lath at G-2 line,G-1 line, and G-J line OK. | DAN | DAN | | BLA | P | 5192410 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/03/2016 | Met with Ben Schlick, Superintendent, regarding permit for score board on ball field. Permit for field retaining wall 90% finished and will be called in when completed. Fire spray 1hr protection and structural members protection detail will need to be spliced into approved plans. 3rd party observation of spray for compliance to fire protection requirements to be provided. | DAN | DAN | | BSP | P | 5190445 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 05/03/2016 | lath at building entry and west wall of E1 area OK. | DAN | DAN | | BLA | P | 5190429 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 04/26/2016 | Upper roof parapet at E-1 line E-A through E-E. | DAN | DAN | | BLA | P | 5184483 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 04/21/2016 | lath at Grid A2-E lines A2-2 through A2-6 OK; Still need lath at foundation wall below. | DAN | DAN | | BLA | P | 5181440 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 04/21/2016 | grid A2-E lines A2-4 through A2-7 exterior east wall OK. | DAN | DAN | | BIN | P | 5181436 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/21/2016 | Level 107, Area A1-1 above grid ceiling OK. | DAN | DAN | | BSP | P | 5181432 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/19/2016 | Letter from Kumar and Associates, Inc. for structural steel and welded metal framing. Areas A and E excluding link. Duane Craft, #37553 Talked with Ben regarding roof 1hr fire protection for 10' back at glass wall building step up. He indicated a spray type protection to be used and detail of it to follow for RBD approval. | DAN | DAN | | BFR | P | 5179767 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 04/19/2016 | Aear A 2; West wall 2nd level; grid A2-B lines A2-7 through A1-6, OK. E-1 line upper roof parapet between E-A and E-E lines. OK. | DAN | DAN | | BIN | P | 5179760 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 04/15/2016 | East exterior wall, R19 A1-E grid lines A2-1 to A2-4 | DAN | DAN | | BIN | P | 5178472 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/15/2016 | CH studs and shaft liner; 2hr gym wall at level 107' , floor to deck. at G-2 line, G-J to G-P. | DAN | DAN | | BFR | P | 5178471 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 04/13/2016 | R19, Grid A2-B, line A1-7 at angle to line A2-B; Area 213 west wall and north temp wall. R19. | DAN | DAN | | BIN | P | 5176481 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 04/13/2016 | Grid A2-7, line A2-E to A2c.2 to link. Corner grid A2-E lines A2-6 to AA2.7 Atlas Enerty Shield PRO 2" foam board. | DAN | DAN | | BLA | P | 5176475 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 04/12/2016 | above roof lath at line E-A OK. | DAN | DAN | | BLA | P | 5174890 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/07/2016 | Met with Rob and Jason regarding 2hr wall at GridA2-7 with a "PK" wall type at an existing wall and how it could be built. | DAN | DAN | | BSP | P | 5171977 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 04/07/2016 | Area A-2 lower level east wall exterior wall insulation OK. Grid A2-E; A2-1 throughA2-7 and Grid A2-7 to A2-D | DAN | DAN | | BIN | P | 5171941 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 04/06/2016 | east wall lower level Grid A1-D line A1-1 through A1-5 missing insulation behind electrical boxes. Recall | DAN | DAN | | BIN | P | 5171396 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 04/06/2016 | East wall; Grid A1-D, lines A1-1 through A1-5 OK. | DAN | DAN | | BLA | P | 5171395 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/04/2016 | fire stop listed detail OK at electrical and sprinkler pipes through shaft liner at gym/kitchen wall and at E1 line at chase enclosures. Talked with Rob regarding an engineering judgment from fire protection engineer for studs into shaft liner at 2hr wall, above dbl doors, line F-S1D. | DAN | DAN | | BFR | P | 5169322 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 04/01/2016 | A1-A grid, lines A2-5 through A2-65 lath OK. | DAN | DAN | | BLA | P | 5168208 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/01/2016 | E1line 6 duct chases framing, "PM" wall types, and floor penetrations protection OK. Shaft liner at kitchen G1 line OK. | DAN | DAN | | BFR | P | 5168206 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/31/2016 | On site training with Inspector Dan,reviewed 2 hour firewall construction,rated assemblies | BERTW | BERTW | | BSP | P | 5167003 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 03/31/2016 | Lath inspection at line A2-B, A2-3 through A2-5 OK. | DAN | DAN | | BLA | P | 5166921 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/31/2016 | Received UL system W-L-5169 for metallic penetration through 2hr wall. Talked with Rob regarding roof studs penetration 2hr separation wall. Will require an engineering Judgment from approved fire protection engineer above doors in E213 area. In same area have pipe and ducts penetration through 1hr ceiling. Will need solution from architect. Walked site with Bert and reviewed 2hr walls at gym and floor penetration protection.
| DAN | DAN | | BFR | P | 5166913 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 03/29/2016 | Lath OK at A1-A line columns A1-6 to A2-2. 2" Atlas insulation board under lath. | DAN | DAN | | BLA | P | 5164429 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 03/28/2016 | Stud packs at overhead garage door on E2 line fill with DOW "Froth-pak" product for R of 5.97 per inch for R30 for cavity. Product info on file. Exterior fdn wall insulation on inside at A1.1 line between A1-2 and A1-4, 2" of CI Board, Atlas Wall for a R13.1. Product in formation on file. Safeing top of gym, kitchen wall OK. | DAN | DAN | | BIN | P | 5164160 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/24/2016 | Received stamped Kumar & Associates, Inc. observation for mill thickness of intumescent paint for gypsum/wood/OSB. ForceField Guard E-84. In lieu of Brian Risley letter of observation. | DAN | DAN | | BSP | P | 5162197 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/24/2016 | Shaft liner at 2hr gym wall "J" runner is 2" short of roof deck. Will require engineering judgment from fire protection engineer for fix. Revised comments on 3/26/16, after review of detail #29 on A8.7, shaft liner only required to extend a minimum of 36" above lower roof. No engineering judgment is required. | DAN | DAN | | BSP | P | 5161534 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 03/24/2016 | Area A2 mechanical room #A163, north exterior wall R19 insulation OK pending other rough inspections. | DAN | DAN | | BIN | P | 5161512 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 03/21/2016 | Area A-1, east wall 2nd level, grid line A1.D , lines A1.5 through A1.1 R19 6" studs OK. Area A1 lower level west exterior wall wall framing insulation. R19 OK. Rob to get RFI on insulation detail for FDN wall interior side. | DAN | DAN | | BIN | P | 5159626 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/17/2016 | Meeting at PPRBD with Ben Schlick, Bruce, Advantage Drywall, Bert Warchol and Dan Friedell. Meeting regarding 2hr wall at existing Gym, detail 29R on sheet 1A8.6 for compliance to E-84 protection. It was decided, either Holly Burns or Brian Risley would do a site visit to verify detail compliance and then provide a stamped letter of observation. Letter from Kumar and Associates for observation of product used and mill coverage is on file. | DAN | DAN | | BSP | P | 5157295 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 03/16/2016 | Cantilever rim Area A1 east wall, A1-1 through A1-D. E2 line E-E through E-G, kitchen south wall. | DAN | DAN | | BIN | P | 5156728 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/16/2016 | Entry lobby 4x4x1/4" angles attached at entry stud pack and entry lobby door framing per detail 11/S2.5 and 7/S4.3 OK. | DAN | DAN | | BFR | P | 5156720 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 03/16/2016 | Area A1 west wall line A-1 through A1-5 OK. | DAN | DAN | | BLA | P | 5156707 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 03/15/2016 | east exterior wall area A1 lower level OK up to grid ceiling. Still need cantilever insulation completed. | DAN | DAN | | BIN | P | 5155152 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/14/2016 | Met with Ben and Rob regarding 1hr ceiling assembly at stepped wall detail 11/18.6, sheet 1A6.3, of Core and Shell plans. Ben will submittal for ceiling type of assembly. Splice need for mechanical and electrical protected openings as well for protection of supporting elements to include beams, columns and columns in walls. | DAN | DAN | | BSP | P | 5154751 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 03/14/2016 | east exterior wall and cantilever area of area #127; missing insulation behind dbl boxes, missing insulation in dbl studs/king studs. insulation exterior rim of cantilever. Recall inspection. | DAN | DAN | | BIN | P | 5154670 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/11/2016 | Per phone conversation with Ben regarding the 3rd party observation of the application of the E-84 product; It will require the Assembly number to be used. Ben will get with Holly Burns, CRP Architects for the solution and provide in writing. 3rd party observation to include verification of the product used ie FireGuard E-84, and compliance to the approved Assembly from Holly Burns. Ben is also have written verification of the EXP board used for the wrap to meet type X requirements.
| DAN | DAN | | BSP | P | 5153004 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/10/2016 | Walked with Chris Lalond, Olson plumbing supper regarding angular space around pipe penetrations in floor for compliance to section 714. Chris stated he was a ware the the requirement and will call for inspections when ready. | DAN | DAN | | BSP | P | 5152211 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/10/2016 | Exterior wall framing at east lobby, A1-D line and to east side. lower, middle and upper stud walls OK pending weld report and 4x4x1/4" angles installed at stud packs. recall. Per Rob, Kumar out yesterday and did observation of E-84 product. Letter of compliance to follow. | DAN | DAN | | BFR | P | 5152181 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/09/2016 | Walked with Jason, framing foremen. He will call in framing tomorrow. | DAN | DAN | | BSP | P | 5151411 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 03/09/2016 | lath north exterior wall at courtyard line E2, G-J to corner. | DAN | DAN | | BLA | P | 5151397 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/08/2016 | The 2 layers of rock used at top of CMU plywood and gym is National Gypsum, EXP sheating. Detail required TYPE "X". Contractor is to provide documentation for compliance meeting type "X" as per detail 29R sheet 1A1.8.6 Missing fire caulking at roof drain through Core Board above roller door. | DAN | DAN | | BFR | P | 5150229 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 03/08/2016 | Area "E-1"north wall and courtyard, E-2 line, E-A to G-J lath OK. | DAN | DAN | | BLA | P | 5150189 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/07/2016 | 1) 2 layers of 5/8 type "X" GYP installed over plywd top of existing CMU wall at GYM. Type of E-84 listing to be provide by Architect and approved 3rd party will do compliance observation. Framing for north column 1hr protection at "EA" line OK. Still need south collumn at "EA" line inspection. Upper 3 5/8" stud wall framing at roof, "E1" line between "EA" and "EE". Vestibule line at A1-D stud framing OK pending completion of welding and stiching of stud packs. Lobby framing north wall at line "A1-1" OK. | DAN | DAN | | BFR | P | 5149664 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | R | 03/07/2016 | Work still in progress. Will recall tomorrow. | DAN | DAN | | BIN | R | 5149559 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B=R | R | 02/25/2016 | Wrong inspection called in. | DAN | DAN | | B=R | R | 5142163 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 02/25/2016 | 2015 IECC, R19 installed upper soffit at E-A line. Upper roof R19 at E-2 line. still need insulation installed in stud packs at 3 garage doors. Roof insulation; 3" of ISO Guard, 1/2" dens deck. | DAN | DAN | | BIN | P | 5142158 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/24/2016 | Core board lower level electrical area, G-I to G-J. Soffit framing at grid E-A for protection of beam at 1hr lid; Will have steel pipes and ducts penetrating 1hr acustical ceiling. Will require fire stop details. Received listed fire stop detail for steel pipes in 2hr core board at E-1 line. W-L-502. need to verify application. Fire Guard E-84 specified for for plywood rim at gym. The E-84 application will require a 3rd party observation to confirm design application is met. Need to know what type of surface protection number is to be used. | DAN | DAN | | BFR | P | 5141596 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BLA | P | 02/23/2016 | Area "E" south elevation and area "H" east elevation; south side of kitchen wall and east side of band room wall. | DAN | DAN | | BLA | P | 5140051 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/23/2016 | Walked with Travis, adavange drywall, 720-376-2006. 2nd layer of 5/8 type X rock being installed at E1 line north side. Need listed detail for fire caulking of 10" insulated steel pipe. Have pipe penetrations at 6 different locations. | DAN | DAN | | BFR | P | 5140041 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | T | 02/23/2016 | PAID (REC#1314654): PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Update firewall construction | MICHAELA | MICHAELA | | BSP | T | 5139767 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/18/2016 | Interior wall framing Wall types PG, PQ and PH on sheet 1A1.3. 2nd level; Bathrooms A212 and A213 closet flanges OK, backing to be installed by GC. Rooms A216, A203, A211 and A218 wall framing OK. | DAN | DAN | | BFR | P | 5136824 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/16/2016 | Meeting with Mike A, RBD Ben, Rob GE Johnson, Advantage dry wall Jim, and CRP Architect Holly Burns. Reviewed proposed detail for 2 hr wall at gym wall, through expansion joint and E1 line and at glass step wall. Holly will have revised details submitted to Mike for his approved to be spliced into the approved plans. Additional comments 2/17/16, Revised existing gym wall will include detail on how the 2 hr wall will extend to roof deck from top of CMU wall. At E1 line 2hr wall, will provide framing detail for shaft liner to box out around column and beam for building on south side of the wall. Glass wall step up to west to have 1hr ceiling back 10' with protected supporting members and detail for 2x4 light penetrating the 1hr ceiling. | DAN | DAN | | BSP | P | 5134575 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/16/2016 | Shaft liner framing on E1 line, grids EA-EC pending fire stop completed at through penetrations and complete box out framing around penetrating columns and beams in two places. | DAN | DAN | | BFR | P | 5134564 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/12/2016 | Top of gym/ 2hr wall pics. | DAN | DAN | | BSP | P | 5133635 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/11/2016 | "H" studs cut at sprinkler lines at E1 line. DMS slotted top track used. | DAN | DAN | | BSP | P | 5132597 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/09/2016 | Walked 2hr lines with Nick and Scott and framing interior framer Reviewed Section 706.6 Vertical continuity IBC2015; detail still needed for areas involved. Framer is waiting for the approved. details. Also talked about Section 706.2 Structural stability. | DAN | DAN | | BSP | P | 5130642 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/09/2016 | Training with Dan F on interior framing and Fire wall construction per 706 in IBC | NICK | NICK | | BSP | P | 5130555 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/05/2016 | Attended meeting with Superintendent Ben Schlick, and CRP Architect Holly Burns. Reviewed proposed 2hr detail for E1 line at building step roof. Holly indicated she wanted to return to original detail with some modification. Also talked about the 2hr wall at the existing gym wall not being continious from foundation to roof deck and supported by non rated floor. She will bring the revised details to Plan Review for approval and have spliced into approved plans. Also wanted to use core board to block around 2 steel columns that supports roof beam on other side of 2hr wall. Again would need listing from manufacture for this application. | DAN | DAN | | BSP | P | 5129482 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/04/2016 | Met with Ben Schlick, Superintendent. Explained the need for a revised 2hr fire wall detail at the E1 line approved by an Fire Protection Engineer or a perscriptive method submitted to Plan Review for approval and spliced into plans of due to structural, changes before an inspection could be conducted. Talked about 2hr fire wall at Gym building resting on non rated floor structure. At E1 line have a roof beam penetration the shaft wall and need solution. Ben indicated he would be on his way to the architect's office. Per Ben's structural letter for the steel erection should be ready for pick-up in 2 weeks. Talked about increasing the mechanical scope of work to include what was noted on core and shell plansto the permit. | DAN | DAN | | BFR | P | 5128448 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 02/04/2016 | Training with Dan F on Fire wall continuity / Training on getting correct detail for work being done on job site / Help with inspection of interior framing / Went over items with Ben from GE | NICK | NICK | | BSP | P | 5128313 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/28/2016 | Exterior wall framing area A-1 west wall grid A1-A ; lines A1-1 through A2-2. lower level and floor above. Per details 1/S4.1 and 8/S4.1. pending welding observation. | DAN | DAN | | BFR | P | 5125873 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/28/2016 | Walked site with Ben and Bert. Reviewed 2 hr walls at E1 line. Need mechanical inspection for dampers installed in lower level. Reviewing support of fire walls and top of walls at building steps. | DAN | DAN | | BSP | P | 5125872 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/28/2016 | Inspector training with Dan F/Reviewed with job super Ben S rated wall construction/firewalls/firebarriers/smoke barriers/supporting floor construction type 2B building/reviewed Dan's schedule for weekly inspections. | BERTW | BERTW | | BSP | P | 5125233 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 01/21/2016 | Roof parapet framing over band room per details 3/S4.2 and 12/S4.1 On E-1 line, need revised 2hr firewall detail at existing structure due to structural framing clearances. | DAN | DAN | | BSP | P | 5120256 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/15/2016 | Walked with Jason, framing foremen. Area E-1 south elevation, exterior wall framing, and west of line F-S1.3, completed per details 3/S4.2 and 5/S4.1; exterior wall OK at Grid E-1, lines E-G and E-E per details 12/S4.1 and 13/S5.2. Grid E-1 2hr fire barrier framing detail to be revised due to site structural steel issues. | DAN | DAN | | BFR | P | 5117396 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/07/2016 | Walked with Jason, cell 306-2933; east band room wall framing at Area E-2 line E1through E-D; High to low roof wall framing at line E-E and kitchen High to low roof wall framing OK pendng completion of welding and observation report. Craw space Smoke wall framing per detail 6/1A72 at line E-C line OK. Will need to complete rest of soffit framing in Craw space. | DAN | DAN | | BFR | P | 5111814 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 01/05/2016 | Walk site with Jason, foreman for Advantaged Drywall. reviewed wall framing (detail 14/S4.1) exterior wall at Area E-1, line E-2 grid E-A through E-F. OK pending welding oberservation from Richard Peters, CWI, cell 303-883-1284. framed stud packs are filled with insulation. Existing stud packs without insulation to be fill with an approved product.
| DAN | DAN | | BFR | P | 5109775 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BIN | P | 01/04/2016 | Per conversation with project Superintendent, Ben Schlick, framers are now installing high density insulation in stud pack cavities. Existing stud packs already framed and welded together will fill with a foam product. Type is still to be determined. | DAN | DAN | | BIN | P | 5109525 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFN | P | 01/04/2016 | Kumar and Associates, Inc. letter on file from Duane Craft, #37553 for open hole observation, foundation sub-grade preparations, foundation concrete and masonry for Areas "A", Excluding the link of Area "A" and "B" and Area "E". | DAN | DAN | | BFN | P | 5109506 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/23/2015 | Met with Rob Clough to walk site; Requested engineer letter of observation for foundation. Steel erection in progress in area "E2" and area "A1" and "A2". Exterior wall framing started in area "E2". Met Jason foreman for Advantage Drywall, 719-306-2933. Talked about 2hr fire wall and detail. Talked about insulation box beam headers and stud packs. Jason will talk with Architect next Tuesday meeting regarding stud pack insulation. Weld inspections being done by Kurmar, Richard, phone # when received. Rob will be calling in framing inspections first of January. | DAN | DAN | | BSP | P | 5105231 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 12/01/2015 | Met with Rob; Steel erection in progress "E2" area. Kumar letter for foundation still in works. | DAN | DAN | | BSP | P | 5088908 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/03/2015 | Walked with Rob Clough and Nick Martinell. Reviewed areas "E2" and "A2". Area "A2" foundation poured and slab ready to be poured. Area "E2" south wall to be poured This Friday. Kumar engineering to do elevator tower bond beams in "E2". November 16 steel will start being set. Per Rob in approx 30 days hopes to have Kumar letter for foundation compliance to approved plans. Review plans with Nick. RBD code review for occupancy. Went over area separation walls. Talked about need UL listed details. | DAN | DAN | | BSP | P | 5071201 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 11/03/2015 | Training with Dan F / Got safety sticker for job site / Walked site with Dan and Rob / Went over Fire walls with Dan F | NICK | NICK | | BSP | P | 5071170 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFN | P | 09/29/2015 | Walked site with Rob Clough. Area A-2 footers in and 33% of walls to be poured in 3 days. Area E-2, 50% completed with grade beams being installed for walls above. Kumar on site doing observations. Bob will provide copy of re-bar observations next trip out. Problem with comper today and could not provide. | DAN | DAN | | BFN | P | 5046173 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFN | P | 08/31/2015 | Walked site with Rob; looked a pier caps and grad beams; Kurmar doing observations. line E 1.5 pier caps; Line GG through GB grad beams and G through E-2. Placing concrete tomorrow. | DAN | DAN | | BFN | P | 5026768 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/20/2015 | Meeting at site construction office with Bert, and Rob Clough, job foreman. Reviewed procedures for future inspections and phasing of job. Rob will be calling in periodic inspection of foundation of next several weeks. Rob will start a 3 ring binder for RFIs, engineering letters. and need documentation for PPRBD records. | DAN | DAN | | BSP | P | 5018672 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/20/2015 | on site meeting with Inspector Dan,Foreman Rob reviewed job access,schedule,plan sets,binder for field changes in office,and other job requirements. | BERTW | BERTW | | BSP | P | 5018654 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFN | P | 08/13/2015 | ok to use Kumar to do Cassions,Footings and Foundations inspections/Engineer observations reports to be provided for inspector pickup per Bert W Senior Building Inspector | BERTW | BERTW | | BFN | P | 5014428 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFT | P | 08/13/2015 | ok to use Kumar to do Cassions,Footings and Foundations inspections/Engineer observations reports to be provided for inspector pickup per Bert W Senior Building Inspector | BERTW | BERTW | | BFT | P | 5014426 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/13/2015 | Met construction team.reviewed 3rd party inspections POC,Job Super Ben Schlick 491-5736 POC,Rob Clough Foreman 492-8126 | BERTW | BERTW | | BSP | P | 5014420 |
US ENGINEERING COMPANY | H= | C | 08/04/2016 | PERMIT DETAILS/SCOPE CORRECTED. | LUKE | LUKE | | H= | C | 5261409 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 08/04/2016 | PERMIT DETAILS/ SCOPE CORRECTED. | LUKE | LUKE | | H= | C | 5261408 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 08/04/2016 | | JON | JON | | H= | C | 5261377 |
US ENGINEERING COMPANY | H= | C | 08/04/2016 | | JON | JON | | H= | C | 5261374 |
OLSON PLUMBING & HEATING COMPANY | H16 | C | 08/02/2016 | Need computer room unit and condenser added to scope of work by licensed contractor. | JON | JON | | H16 | C | 5259106 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 08/02/2016 | UNDER GROUND PIPING AND CRAC PIPING OK - NEED TO ADD CARC UNIT TO PERMIT | JERRYF | JERRYF | | HWP | P | 5259101 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | C | 07/21/2016 | ELEVATOR COMPLETE--SEE PERMIT J99749 FOR INTERIOR FINISH | ERIC | ERIC | | HE= | C | 5250482 |
OLSON PLUMBING & HEATING COMPANY | H16 | C | 02/10/2016 | NEED PERMIT ATTACHMENT FOR CRAC UNIT AND INSPECTIONS, HAD CONVERSATION WITH STEVE O'DONNELL FROM US ENGINEERING | JON | JON | | H16 | C | 5132018 |
OLSON PLUMBING & HEATING COMPANY | H16 | C | 02/03/2016 | Need proper permits and inspections including computer room units and refrigeration piping | JON | JON | | H16 | C | 5127101 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 12/22/2015 | UNDER GROUND CONDENSER WATER OK - HIGH LIGHTED IN PINK ON PLANS | JERRYF | JERRYF | | HWP | P | 5103839 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 11/10/2015 | 60# OK ON 4 HWP UNDER GROUND LINES HIGH LIGHTED IN YELLOW ON PAGE 1M2.0 / AREA A1 / LEVEL 107 | JERRYF | JERRYF | | HWP | P | 5076199 |