BLATTNER ENERGY, INC. | B= | C | 04/05/2016 | All other required Final inspections are complete. (This is a computer generated result) | GEORGEG | GEORGEG | | B= | C | 5169713 |
BLATTNER ENERGY, INC. | B= | P | 04/04/2016 | #rd party engineering and observation. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 520-6300). | GEORGEG | GEORGEG | | B= | P | 5168504 |
LIMON PLUMBING & SUPPLY, INC. | BSP | T | 10/30/2015 | PAID (REC#1298957) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice | TCRIPPEN | TCRIPPEN | | BSP | T | 5069461 |
PLAINS HEATING AND AIR CONDITIONING, INC. | BSP | T | 10/02/2015 | PAID (REC#1293814): PLAN SPLICE FEE: $50 by: DALEH for Mechanical: changes to return air path | DALEH | DALEH | | BSP | T | 5049646 |
BLATTNER ENERGY, INC. | BFR | P | 09/21/2015 | Frame OK / Still need Eng for foundation / Need all MEP's complete | NICK | NICK | | BFR | P | 5040549 |
BLATTNER ENERGY, INC. | BFN | P | 08/07/2015 | East pads and wall bar OK / Need to complete west, north and south sides / Need Eng letter and open hole letter | NICK | NICK | | BFN | P | 5010270 |
SHIDELER ELECTRIC, INC. | E= | C | 10/22/2015 | | JOSEPH | JOSEPH | | E= | C | 5063608 |
SHIDELER ELECTRIC, INC. | E= | R | 10/21/2015 | Breaker for condenser too large Max is 45 min is 28------------------- ID hvac disconnects.------------Comply with model energy------------- Ceiling wires for fixtures and raceways---------------GFCI for all kitchen receptacles if 120 volt------------ARC flash stickers for panels ----------ID panel and where sub is fed from-----------------inter-system bonding terminal.------------- | JOSEPH | JOSEPH | | E= | R | 5062648 |
SHIDELER ELECTRIC, INC. | ES | C | 09/22/2015 | Commercial Service: 200 amp 3w commercial ----------- need meter set | JOSEPH | JOSEPH | | ES | C | 5041724 |
SHIDELER ELECTRIC, INC. | EUG | C | 09/22/2015 | From utility pedestal all in pvc | JOSEPH | JOSEPH | | EUG | C | 5041723 |
SHIDELER ELECTRIC, INC. | ER | P | 09/22/2015 | walls complete | JOSEPH | JOSEPH | | ER | P | 5041720 |
SHIDELER ELECTRIC, INC. | ER | R | 09/17/2015 | Need far side supports throughout. | JOSEPH | JOSEPH | | ER | R | 5038646 |
SHIDELER ELECTRIC, INC. | ESL | P | 08/11/2015 | Partial slab NE corner only | JOSEPH | JOSEPH | | ESL | P | 5012240 |
PLAINS HEATING AND AIR CONDITIONING, INC. | H= | C | 03/10/2016 | TAB REPORT RECEIVED | JERRYF | JERRYF | | H= | C | 5151782 |
PLAINS HEATING AND AIR CONDITIONING, INC. | H= | P | 10/26/2015 | NEED TEST AND BALANCE REPORT FOR FINAL | JON | JON | | H= | P | 5065902 |
PLAINS HEATING AND AIR CONDITIONING, INC. | HO | C | 10/26/2015 | UNDERGROUND LP GAS LINE COMPLETE | JON | JON | | HO | C | 5065901 |
PLAINS HEATING AND AIR CONDITIONING, INC. | HV | P | 10/19/2015 | NEED INSTALL MANUAL TO VERIFY VENTING ON TUBE HEATERS - NEED INSULATION SHIELDS INSTALLED ON FLUES | JERRYF | JERRYF | | HV | P | 5060940 |
PLAINS HEATING AND AIR CONDITIONING, INC. | HD | C | 10/19/2015 | ABOVE CEILING OK FOR TILE PENDING ALL OTHER INSPECTIONS -- FOR FINAL NEED THE FOLLOWING TAB REPORT - MINI SPLIT DRAIN COMPLETED - CONDENSERS INSTALLED AND LABELED - INSULATION SHIELDS AT TUBE HEATER VENTS - INSTALL MANUAL FOR TUBE HEATERS TO VERIFY VENTING - PLAN REVISION IS OK SHOWING CHANGING TO DUCTED RETURN FROM PLENUM RETURN - NOTES INTERLOCKS AT EXHAUST FAN AND LOUVER AT WAREHOUSE OK | JERRYF | JERRYF | | HD | C | 5060937 |
PLAINS HEATING AND AIR CONDITIONING, INC. | HC | C | 09/24/2015 | RELEASE METER | LUKE | LUKE | | HC | C | 5043496 |
PLAINS HEATING AND AIR CONDITIONING, INC. | HI | C | 09/24/2015 | 10# GAS TEST GOOD. GAS LINE INSTALLED PER PLANS. LP SYSTEM... | LUKE | LUKE | | HI | C | 5043494 |
PLAINS HEATING AND AIR CONDITIONING, INC. | HD | P | 09/24/2015 | NEED TO ISOLATE ALL MATERIALS IN PLENUM CEILING THAT DON'T MEET 25 FLAME SPREAD-50 SMOKE-DEVELOPED. DUCT OK.. NOTE: TEST AND BALANCE BY FINAL, LABEL ALL EQUIPMENT TO AREAS THEY SERVE.. | LUKE | LUKE | | HD | P | 5043491 |
LIMON PLUMBING & SUPPLY, INC. | P= | C | 12/08/2015 | RECEIVED WATER CERTIFICATION | JON | JON | | P= | C | 5093948 |
LIMON PLUMBING & SUPPLY, INC. | P= | P | 11/13/2015 | need certificate of potable water, rest ok | TED | TED | | P= | P | 5079494 |
LIMON PLUMBING & SUPPLY, INC. | PWO | C | 10/29/2015 | no hydrants | TIM | TIM | | PWO | C | 5068713 |
LIMON PLUMBING & SUPPLY, INC. | PTO | P | 09/24/2015 | all piping is per plan...have issues w/ pex and pvc in above ceiling r/a plenum | TIM | TIM | | PTO | P | 5043868 |
LIMON PLUMBING & SUPPLY, INC. | PB | C | 08/20/2015 | by final need revised plan (as builds) to show new location of trunk lines and sewer stub | TIM | TIM | | PB | C | 5019306 |
LIMON PLUMBING & SUPPLY, INC. | PB | R | 08/18/2015 | finish trunk and test | TIM | TIM | | PB | R | 5017463 |
LIMON PLUMBING & SUPPLY, INC. | PB | R | 08/14/2015 | no approved plan on site | TED | TED | | PB | R | 5015598 |
LIMON PLUMBING & SUPPLY, INC. | PB | P | 08/12/2015 | need approved plan label stacks need dry dirt for backfill | TIM | TIM | | PB | P | 5013413 |