ELITE PROPERTIES OF AMERICA, INC. | B= | C | 01/26/2016 | items corrected | DANE | DANE | | B= | C | 5123376 |
ELITE PROPERTIES OF AMERICA, INC. | B= | P | 01/22/2016 | seal penetrations in the ceiling of the garage / fix insulation in attic / graspable rail in garage is over 38" -- Schedule a new Building Final when above items are complete. | DANE | DANE | | B= | P | 5121588 |
ELITE PROPERTIES OF AMERICA, INC. | BLA | C | 11/23/2015 | | DANE | DANE | | BLA | C | 5085776 |
ELITE PROPERTIES OF AMERICA, INC. | BIN | C | 11/20/2015 | | BOBF | BOBF | | BIN | C | 5083061 |
ELITE PROPERTIES OF AMERICA, INC. | BTR | C | 11/16/2015 | | TOMG | TOMG | | BTR | C | 5080097 |
ELITE PROPERTIES OF AMERICA, INC. | BFR | C | 11/16/2015 | | TOMG | TOMG | | BFR | C | 5080096 |
ELITE PROPERTIES OF AMERICA, INC. | BSP | P | 10/13/2015 | Front porch framing ok | TOMG | TOMG | | BSP | P | 5056123 |
ELITE PROPERTIES OF AMERICA, INC. | BFD | C | 09/14/2015 | 2800 , entire perimeter, positive, 1.5 | TOMG | TOMG | | BFD | C | 5035750 |
ELITE PROPERTIES OF AMERICA, INC. | BFN | C | 09/04/2015 | Ufer observed | TOMG | TOMG | | BFN | C | 5030688 |
ELITE PROPERTIES OF AMERICA, INC. | BFT | C | 09/04/2015 | Received letter | TOMG | TOMG | | BFT | C | 5030686 |
ELITE PROPERTIES OF AMERICA, INC. | BFT | P | 08/31/2015 | Work is incomplete. Please have all forms installed and column pad steel constructed before next inspection. 11:15 am | TOMG | TOMG | | BFT | P | 5025626 |
J2D ELECTRIC, INC. | E= | C | 01/13/2016 | | BRET | BRET | | E= | C | 5115346 |
J2D ELECTRIC, INC. | E= | R | 01/12/2016 | install washer receptacle, install box extension on receptacle above fire place. note 30 amp a/c installed. | BRET | BRET | | E= | R | 5114253 |
J2D ELECTRIC, INC. | ER | C | 11/12/2015 | finished basement---no mcc--AL ser*2---no cv | SHELBY | SHELBY | | ER | C | 5077413 |
J2D ELECTRIC, INC. | ES | C | 11/12/2015 | Residential Underground: 200 amp | SHELBY | SHELBY | | ES | C | 5077393 |
REGIONAL HEATING AND AIR CONDITIONING, INC. | H= | C | 01/21/2016 | CORRECTION MADE. | LUKE | LUKE | | H= | C | 5120207 |
REGIONAL HEATING AND AIR CONDITIONING, INC. | H= | P | 01/20/2016 | Need to connect kit downdraft and install furn vent term. Rest ok. Note: Fin. bsmnt, has a/c, hi/lo grills, osa. | MARK | MARK | | H= | P | 5119087 |
REGIONAL HEATING AND AIR CONDITIONING, INC. | HC | C | 11/13/2015 | RELEASE METER | MICHAELS | MICHAELS | | HC | C | 5079180 |
REGIONAL HEATING AND AIR CONDITIONING, INC. | HRR | C | 11/13/2015 | Corrections made. | MICHAELS | MICHAELS | | HRR | C | 5079178 |
KAMPP-L ENTERPRISES, INC. | HI | C | 11/12/2015 | 10# test ok. 1 1/4" main to furn, w/h, 2-fp, c-top, bbq. | MICHAELS | MICHAELS | | HI | C | 5078001 |
REGIONAL HEATING AND AIR CONDITIONING, INC. | HRR | P | 11/12/2015 | Need back framing for dryer vent, 7" supply at patio door is crushed and not sealed at boot, rest ok. Note: finished basement, 6" osa, a/c rough(coil and lineset), direct vent furnace. | MICHAELS | MICHAELS | | HRR | P | 5077999 |
KAMPP-L ENTERPRISES, INC. | P= | C | 01/21/2016 | NOTE : FINISHED BASEMENT , PVB INSTALLED | GABE | GABE | | P= | C | 5120658 |
KAMPP-L ENTERPRISES, INC. | PTO | C | 11/10/2015 | NOTE : FINISHED BASEMENT , AAV AT BAR , IRRIGATION STUB | GABE | GABE | | PTO | C | 5076434 |
KAMPP-L ENTERPRISES, INC. | PB | C | 09/21/2015 | H2O RUN UNDER FOOTER | GABE | GABE | | PB | C | 5040668 |