THOMAS GENERAL CONTRACTORS, INC. | B= | C | 11/18/2016 | Retaining wall on separate permit // Building final complete per previous inspection notes | JEREMYA | JEREMYA | | B= | C | 5348150 |
THOMAS GENERAL CONTRACTORS, INC. | B= | P | 11/07/2016 | still need permit for retaining wall at northwest corner / all other items corrected / final OK pending permit for retaining wall -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | DANE | DANE | | B= | P | 5338411 |
THOMAS GENERAL CONTRACTORS, INC. | BSP | P | 10/28/2016 | Discussed on the phone with Dan of Thomas General Contractors the need to pull permit for retaining wall at northwest corner of building. There is a detail for the construction of the retaining wall on these prints on page S5.1 but the retaining wall is not attached to the building nor is in on the foundation layout plan for this permit therefore the retaining wall needs to have its own address and permit. | DANE | DANE | | BSP | P | 5330304 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | C | 10/28/2016 | all framing items completed | DANE | DANE | | BFR | C | 5330303 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 10/19/2016 | engineer observation report for welding and bolting on file | DANE | DANE | | BFR | P | 5322017 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | R | 10/17/2016 | need a copy of welding and bolting observations that is stamped by a licensed design professional / copy provided is not stamped by a licensed design professional | DANE | DANE | | BFR | R | 5319684 |
THOMAS GENERAL CONTRACTORS, INC. | BFN | C | 10/17/2016 | open hole on file | DANE | DANE | | BFN | C | 5319680 |
THOMAS GENERAL CONTRACTORS, INC. | BFT | C | 10/17/2016 | Engineers observation Letter on file / Soils report on file | DANE | DANE | | BFT | C | 5319679 |
THOMAS GENERAL CONTRACTORS, INC. | BFT | P | 10/13/2016 | still need open hole / no paperwork on site and not uploaded to inspection | DANE | DANE | | BFT | P | 5318075 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | P | 10/13/2016 | engineer observation report for slip track at top wall on file / still need engineer observation report for all welding and bolting | DANE | DANE | | BFR | P | 5317444 |
THOMAS GENERAL CONTRACTORS, INC. | BFN | P | 10/12/2016 | engineer observation report on file for footing and foundation / still need open hole | DANE | DANE | | BFN | P | 5316249 |
THOMAS GENERAL CONTRACTORS, INC. | BSP | T | 10/11/2016 | PAID (REC#1370714) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Trusses | MICHAELA | MICHAELA | | BSP | T | 5315083 |
THOMAS GENERAL CONTRACTORS, INC. | B= | R | 08/31/2016 | retaining wall at west side of building is not attached to the building or on foundation design and needs its own permit / need rails at walking surfaces with a fall greater than 30" within 36" need openings no greater than 4" / stairs at north side by the riser room need graspable rails on both sides / install all down spouts and replace walking surfaces cut out of concrete / need to complete all finals / need to complete BFT BFN BFR. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | DANE | DANE | | B= | R | 5282340 |
THOMAS GENERAL CONTRACTORS, INC. | BIN | P | 08/31/2016 | insulation OK | DANE | DANE | | BIN | P | 5282339 |
THOMAS GENERAL CONTRACTORS, INC. | BFR | R | 08/31/2016 | need all engineer observation reports for welding, bolting, and all structural components / still have trusses pending - need to splice in all truss engineering / interior non-bearing unit demising wall framing OK / interior non-bearing demising wall at riser room - plan calls for slip track at top. Either instal slip track or need engineering to delete it | DANE | DANE | | BFR | R | 5282338 |
THOMAS GENERAL CONTRACTORS, INC. | BFN | R | 08/31/2016 | need engineer observation report / need open hole | DANE | DANE | | BFN | R | 5282336 |
THOMAS GENERAL CONTRACTORS, INC. | BFT | R | 08/31/2016 | need engineer observation report / need open hole | DANE | DANE | | BFT | R | 5282266 |
THOMAS GENERAL CONTRACTORS, INC. | BSP | P | 05/17/2016 | PLAN SPLICE: (No Fee) by: DANM for Construction: Revised COMcheck showing revised insulation levels | DANM | DANM | | BSP | P | 5201242 |
LANDMARK PLUMBING AND HEATING, INC. | BSP | T | 05/17/2016 | PAID (REC#1330039) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 5-17-16 | TCRIPPEN | TCRIPPEN | | BSP | T | 5201188 |
THOMAS GENERAL CONTRACTORS, INC. | BLA | C | 04/12/2016 | stucco lath from grid lines J to A on north side of northeast end OK / this completes stucco lath | DANE | DANE | | BLA | C | 5175048 |
THOMAS GENERAL CONTRACTORS, INC. | BLA | P | 04/07/2016 | stucco lath OK at street side (west) of building from grid lines T to J and all walls on roof OK | DANE | DANE | | BLA | P | 5172187 |
THOMAS GENERAL CONTRACTORS, INC. | BLA | P | 04/04/2016 | balance of lath on inside radius facing parking lot okay | BOBF | BOBF | | BLA | P | 5168702 |
THOMAS GENERAL CONTRACTORS, INC. | BSP | P | 03/29/2016 | met with Dan and discussed needing engineering for footing and foundation and all heavy gauge steel bolting and welding / discussed needing to expose foundation insulation that was not inspected / discussed the need for R11 foundation insulation or changing the Comcheck to match what is installed | DANE | DANE | | BSP | P | 5165031 |
THOMAS GENERAL CONTRACTORS, INC. | BLA | P | 03/29/2016 | lath OK grid lines G to A on south side of east wing and grid lines 1 to 7 on east end of east wing | DANE | DANE | | BLA | P | 5165006 |
THOMAS GENERAL CONTRACTORS, INC. | BLA | P | 03/23/2016 | lath above the store front roofs on east side OK from grid line S to the south corner / south end OK / lath above store front roofs OK at west side from grid line T to south corner / need all footing and foundation engineering | DANE | DANE | | BLA | P | 5161098 |
THOMAS GENERAL CONTRACTORS, INC. | BSP | T | 12/14/2015 | PAID (REC#1312119) ADDITIONAL PLAN REVIEW TIME: $50 From: MICHAELA Revise exterior wall at Mech. Rm - new ComCheck | MICHAELA | MICHAELA | | BSP | T | 5098330 |
THOMAS GENERAL CONTRACTORS, INC. | BFT | P | 10/20/2015 | met with Dan, reviewed current scope of work / ok for RMG to do footing and foundation wall inspections | BOBF | BOBF | | BFT | P | 5061185 |
MATRIX ELECTRIC, INC. | E= | C | 08/10/2016 | | BRET | BRET | | E= | C | 5266291 |
MATRIX ELECTRIC, INC. | E= | R | 08/09/2016 | heaters missing end plates, install plaque that list the procedure to adjust switches on breaker to comply with 240.87. ( maintenance bypass) it must also state what the breakers should be set at after maintenance. | BRET | BRET | | E= | R | 5264627 |
MATRIX ELECTRIC, INC. | E= | R | 08/01/2016 | no power to gfci in mech room, missing heaters, heater that installed missing end piece. please call call regarding maintenance bypass labeling | BRET | BRET | | E= | R | 5258650 |
MATRIX ELECTRIC, INC. | E= | P | 07/20/2016 | need plaque stating steps to take to reduce trip rating and then back to factory setting | TOMC | TOMC | | E= | P | 5249568 |
MATRIX ELECTRIC, INC. | E= | R | 07/14/2016 | not ready for final need service energized for final, labeling incomplete, need info on arc energy reduction. procedure Plaque may be required. 240.87 | BRET | BRET | | E= | R | 5244931 |
MATRIX ELECTRIC, INC. | ES | C | 07/14/2016 | Commercial Service: need meter set for 200 amp house panel. | BRET | BRET | | ES | C | 5244917 |
MATRIX ELECTRIC, INC. | ES | P | 07/12/2016 | Commercial Service: 3000 amp service made to main only ok to energize note ufer must be accessible at final | BRET | BRET | | ES | P | 5242732 |
MATRIX ELECTRIC, INC. | EUG | C | 06/10/2016 | west side ballard lighting ug | BRET | BRET | | EUG | C | 5220244 |
MATRIX ELECTRIC, INC. | EUG | P | 06/06/2016 | s.e parking lot lighting and patio Ballard lighting conduits OK | BRET | BRET | | EUG | P | 5215871 |
MATRIX ELECTRIC, INC. | EUG | P | 05/26/2016 | n.e parking lot pole base eug | BRET | BRET | | EUG | P | 5209049 |
MATRIX ELECTRIC, INC. | EUG | P | 05/19/2016 | 3/4" pvc for site lights on north east corner of bldg ---------- 1" pvc for site lights on south end of bldg | CRAIG | CRAIG | | EUG | P | 5203742 |
MATRIX ELECTRIC, INC. | EUG | P | 04/22/2016 | 2 - 1" pvc to site lights and side walk lights only | CRAIG | CRAIG | | EUG | P | 5182681 |
MATRIX ELECTRIC, INC. | EUG | P | 11/20/2015 | 4" pvc for phone line from pedestal to column 7 inside building | CRAIG | CRAIG | | EUG | P | 5083068 |
MATRIX ELECTRIC, INC. | EST | R | 11/19/2015 | Commercial Service: need separate permit for temp power ----------- note 3/w 3/0 cu to 200 amp disconnect | CRAIG | CRAIG | | EST | R | 5081930 |
MATRIX ELECTRIC, INC. | EST | R | 09/04/2015 | Temporary Service: not ready ------ consultation with contractor | CRAIG | CRAIG | | EST | R | 5030406 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 08/04/2016 | GAS FINAL OK. ENGINEER LETTER APPROVING 1 INCH MEDIUM PRESSURE GAS LINES FOR ALL RTU'S RECEIVED AND SCANNED. SEE IMAGES FOR LETTER. | NANCY | NANCY | | H= | C | 5262240 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 07/13/2016 | GAS FINAL OK PENDING REVISED/APPROVED PRINTS SHOWING SIZE OF GAS LINES INSTALLED TO ALL RTU'S. NOTE: ALL GAS INSTALLED AT SHELL IS DESIGNED TO BE MEDIUM PRESSURE, REGULATORS ARE INSTALLED AT EVERY RTU. NO METERS SET AT SHELL. WILL NEED METER RELEASE AND LETTERS APPROVING MEDIUM PRESSURE FOR EACH TENANT FINISH AT THIS BUILDING. | NANCY | NANCY | | H= | P | 5244026 |
LANDMARK PLUMBING AND HEATING, INC. | H= | L | 06/29/2016 | PLEASE CALL ME TOMORROW MORNING. ROOF ACCESS LOCKED AT 4;25 PM. STILL NEED REVISED/APPROVED PRINTS. NO METERS SET? NO LETTER FROM CSU APPROVING MEDIUM PRESSURE. | NANCY | NANCY | | H= | L | 5234516 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 06/09/2016 | OK TO SET ALL 2 LB METERS. GENERAL CONTRACTOR TELLS ME YOU ARE SETTING METERS AT ROUGH INSTEAD OF TENANT FINISH ON THIS PROJECT. | NANCY | NANCY | | HC | C | 5219280 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 06/09/2016 | BY FINAL NEED REVISED/APPROVED PRINTS OR LETTER FROM ENGINEER SHOWING GAS LINE SIZING TO ALL UNITS. BY FINAL NEED LETTER FROM CSPU APPROVING MEDIUM PRESSURE GAS FOR ALL SUITES. GAS ON ROOF INSTALLED AS PER PRINTS. NO REGULATORS YET. | NANCY | NANCY | | HI | C | 5219279 |
AIRTECH MECHANICAL, INC. | H= | C | 06/09/2016 | MECHANICAL FINAL OK. FACTORY SMOKE DETECTORS INSTALLED IN UNITS. | NANCY | NANCY | | H= | C | 5219278 |
LANDMARK PLUMBING AND HEATING, INC. | HI | P | 06/01/2016 | ROOF ACCESS LOCATED WHERE? DID NOT SEE ON SHEET G-1 ANY SIZING FOR GAS LINES ON ISOMETRIC, HOW DID YOU KNOW TO INSTALL 1 INCH GAS LINE? IS THE CITY GOING TO SET METERS FOR THE SHELL OR WAIT TO SET METERS AT TENANT FINISH? HOW DID YOU KNOW THE SUITE NUMBERS, SHEET G-1 ONLY SHOWS RTU NUMBERS. 112 AND 142: LOST TEST. 100, 106, 118, 124, 130, 136, 148, 156, 162, 168, 174 AND 180: 10 LB TEST OK. NO ROOF INSPECTION YET, NEED ACCESS TO ROOF. | NANCY | NANCY | | HI | P | 5212723 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 07/07/2016 | NOTE : CORE/SHELL ONLY , ALL TO PLAN | GABE | GABE | | P= | C | 5239634 |
LANDMARK PLUMBING AND HEATING, INC. | P= | R | 06/29/2016 | NOT READY | GABE | GABE | | P= | R | 5234196 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 06/29/2016 | WATER MAIN AND ALL STUB TO PLAN NEED TO INSTALL HOSE BIBS AND TERMINATE ALL VENTS | GABE | GABE | | PTO | P | 5234166 |
LANDMARK PLUMBING AND HEATING, INC. | PB+ | P | 03/04/2016 | NEED TO REVISE PLANS TO SHOW RELOCATION OF MAINS AND WATER ENTRY , DWV AND COPPER MAIN ON TEST FOR WATER ENTRY/MECHANICAL ROOM | GABE | GABE | | PB+ | P | 5148372 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | C | 03/04/2016 | ALL TO PLAN , SPLICE COMPLETE , DWV ON TEST | GABE | GABE | | PRD | C | 5148367 |
LANDMARK PLUMBING AND HEATING, INC. | PB | R | 02/25/2016 | relocation of water service ok, add floor drain at water entry room, need PB+ to complete underground. | TAYLOR | TAYLOR | | PB | R | 5142651 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 01/13/2016 | GREASE AND SANITARY DWV TRUNKS AND RISERS FROM FIRE SPRINKLER TO NORTH EAST END , | GABE | GABE | | PB | C | 5115555 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 12/30/2015 | 4 4INCH STUBS ON SOUTH SIDE OF BUILDING ON TEST , | GABE | GABE | | PRD | P | 5107614 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 12/30/2015 | SANITARY AND GREASE FROM 102 TO SOUTH END OF BUILDING TO PLAN , HAVE PLANS REVISED TO SHOW RELOCATION OF PIPING EXITING BUILDING AND DELETION OF ROOF DRAINS | GABE | GABE | | PB | P | 5107607 |
LANDMARK PLUMBING AND HEATING, INC. | PB | P | 12/23/2015 | NOTE : SANITARY SEWER AND GREASE WASTE TO PLAN , FROM SPRINKLER ROOM TO SPACE 102 MAIN TRUNKS AND RISERS ONLY | GABE | GABE | | PB | P | 5104988 |
LANDMARK PLUMBING AND HEATING, INC. | PRD | P | 12/10/2015 | 4 4 INCH PRD STUBS ON NORTH SIDE OF BUILDING , NEED TO REVISE PLANS TO SHOW DELETION OF OTHER ROOF DRAINS | GABE | GABE | | PRD | P | 5096493 |