SKYLINE CONSTRUCTION COMPANY, INC. | B= | C | 10/27/2015 | corrections from previous inspection okay | BRIANB | BRIANB | | B= | C | 5066212 |
SKYLINE CONSTRUCTION COMPANY, INC. | B= | P | 10/21/2015 | need single action level type hardware on bathroom doors. -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | DAN | DAN | | B= | P | 5062806 |
SKYLINE CONSTRUCTION COMPANY, INC. | BFR | P | 09/28/2015 | interior wall framing for new rear restroom okay / pending other rough inspections / STILL NEED TO ATTACH MECHANICAL TO PERMIT AND COMPLETE INSPECTIONS | BRIANB | BRIANB | | BFR | P | 5045490 |
SKYLINE CONSTRUCTION COMPANY, INC. | BFR | P | 09/18/2015 | partial frame inspection / interior wall frame okay for front restroom only / pending other rough inspections / need to attach mechanical to permit | BRIANB | BRIANB | | BFR | P | 5039295 |
BOULTON ELECTRICAL SERVICES | E= | C | 10/15/2015 | | MIKEC | MIKEC | | E= | C | 5058772 |
BOULTON ELECTRICAL SERVICES | ER | P | 09/16/2015 | WALLS BATHROOM | MIKEC | MIKEC | | ER | P | 5037834 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 10/20/2015 | OK DOOR IS UNDERCUT | JERRYF | JERRYF | | H= | C | 5061288 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | R | 10/16/2015 | COULD NOT GET CEILING TILES OUT TO SEE WHERE DUCT RAN AT NEW BATH ROOM. | JON | JON | | H= | R | 5059332 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 09/29/2015 | HAD CONSULT WITH MECH CONTRACTOR ON EXHAUST FAN OUTLET LOCATION | JERRYF | JERRYF | | HD | P | 5046615 |
PIPE RITE PLUMBING AND HEATING LLC | P= | C | 10/14/2015 | correction made, grease interceptor ok. | TAYLOR | TAYLOR | | P= | C | 5057681 |
PIPE RITE PLUMBING AND HEATING LLC | P= | P | 10/13/2015 | need installation instructions for grease interceptor, rest ok. | TAYLOR | TAYLOR | | P= | P | 5056293 |
PIPE RITE PLUMBING AND HEATING LLC | PTO | C | 09/28/2015 | aav's at 3 comp sink, mop sink, hand sink, and above ceiling in new bathroom, note- check grease interceptor and tie in's at final. | TAYLOR | TAYLOR | | PTO | C | 5045694 |
PIPE RITE PLUMBING AND HEATING LLC | PTO | P | 09/18/2015 | wall ok in existing bathroom. | TAYLOR | TAYLOR | | PTO | P | 5039658 |