BRYAN CONSTRUCTION, INC. | B= | C | 10/03/2018 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 5983768 |
BRYAN CONSTRUCTION, INC. | B= | P | 04/04/2018 | items in phase 7 and 8 corrected / this completes all finals on all phases / final OK pending completion of all other finals. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, HEATING & PLUMBING ENGINEERS, INC Mechanical Final Inspection is not Completed yet, HEATING & PLUMBING ENGINEERS, INC Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5807375 |
BRYAN CONSTRUCTION, INC. | B= | P | 03/19/2018 | need knee protection at disposal at break room in west corridor in phase 8 / vanities are too high in bathrooms at northeast restrooms in phase 7 / all knee protection in phases 1 2 3 and 4 now OK / listing for multiple penetrations at fore barrier at exit corridor received and installed OK / this completes the finals at phases 1 2 3 4 5 and 6 pending other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, HEATING & PLUMBING ENGINEERS, INC Mechanical Final Inspection is not Completed yet, HEATING & PLUMBING ENGINEERS, INC Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5792320 |
BRYAN CONSTRUCTION, INC. | BFR | P | 02/07/2018 | framing at building A level 1 at facilities (west of servery) OK pending other rough inspections | DANE | DANE | | BFR | P | 5759503 |
BRYAN CONSTRUCTION, INC. | BFR | P | 07/25/2017 | framing at building B first floor at servery, dining and multi purpose rooms OK pending other roughs | DANE | DANE | | BFR | P | 5575027 |
BRYAN CONSTRUCTION, INC. | BSP | T | 07/21/2017 | PAID (REC#1441175) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise scope of work | MICHAELA | MICHAELA | | BSP | T | 5571413 |
BRYAN CONSTRUCTION, INC. | BFR | R | 06/02/2017 | still need listings for multiple conduit penetrations using Hilti FS1 and listing for individual conduit penetrations using Hilti FS1 / need to splice in Hilti listing for jacketed conduit penetrations | DANE | DANE | | BFR | R | 5523947 |
BRYAN CONSTRUCTION, INC. | BFR | R | 05/31/2017 | all listed assemblies that are on prints are for Spec Seal fire caulk and Hilti products have been used / need listings for all penetrations in rated walls for the Hilti products used / still need to splice in the shaft liner wall type and all listed assemblies for the penetrations / need to inspect both sides od the walls once correct listings have been found / met with contractor and discussed how to find the correct listings for the correct products used | DANE | DANE | | BFR | R | 5521362 |
BRYAN CONSTRUCTION, INC. | BFR | P | 05/26/2017 | exit enclosure walls at 2nd floor of building B are being built pe UL U415 system B the shaft liner portion of this assembly has been built correctly / still need listed assemblies to repair the penetrations through these walls / still need to splice into plans the design change to use the UL L415 | DANE | DANE | | BFR | P | 5518580 |
BRYAN CONSTRUCTION, INC. | BFR | R | 05/09/2017 | still need UL listed wall assembly spliced into plans for wall S13R / still need listed assemblies for head of wall that go to precast concrete floor above not to a fluted steel floor / still need lidted assemblies for all new penetrations in all fire barriers in the exit enclosure from previous inspection | DANE | DANE | | BFR | R | 5500557 |
BRYAN CONSTRUCTION, INC. | BSP | P | 04/26/2017 | Training with Dane on B occupancies, Type IB construction -- Reviewed exit enclosures and listing required in rated walls, reviewed reading plans and checking details within the plans | DAKOTAB | DAKOTAB | | BSP | P | 5487685 |
BRYAN CONSTRUCTION, INC. | BFR | R | 04/26/2017 | need listed wall detail for 2 hour wall listed at S13R on page A0.1 for exit enclosure on second floor building B on page A1.2B - also need ul listed assemblies for all penetrations through fire barriers (both S12R and S13R) and need head of wall details for all fire barriers / training with Dakota B. | DANE | DANE | | BFR | R | 5487488 |
BIBLE ELECTRIC, INC. | BSP | T | 04/04/2017 | PAID (REC#1414683) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Multiple lighting and power revisions. Major splice. | BERTHA | BERTHA | | BSP | T | 5464177 |
BRYAN CONSTRUCTION, INC. | BSP | T | 03/30/2017 | PAID (REC#1414682) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Major splice | MICHAELA | MICHAELA | | BSP | T | 5459861 |
BRYAN CONSTRUCTION, INC. | BFR | P | 03/28/2017 | interior light gauge framing at phase 7A ( 2nd floor building A south end ) OK pending other rough inspections / wall on south end of this phase is a rated exit enclosure 2 HR fire barrier (UL425) framing of wall OK pending inspections by mechanical inspector at dampers - discussed with Pat of Bryan Construction about the need for listed assemblies for all different types of penetrations through fire barrier | DANE | DANE | | BFR | P | 5457617 |
BRYAN CONSTRUCTION, INC. | B= | P | 03/15/2017 | finals on phases 5 and 6 OK pending other finals / still need knee protection at break rooms at disposals at phases 1, 2, 3 and 4 -- Schedule a new Building Final when above items are complete. | DANE | DANE | | B= | P | 5441452 |
BRYAN CONSTRUCTION, INC. | BFR | P | 01/19/2017 | framing at phase 6 - 4th floor - building A (4th floor north end) OK pending other roughs | DANE | DANE | | BFR | P | 5392862 |
BRYAN CONSTRUCTION, INC. | BFR | P | 12/23/2016 | framing at phase 6 1A north (first floor northwest corner) OK pending other rough inspections | DANE | DANE | | BFR | P | 5376506 |
HEATING & PLUMBING ENGINEERS, INC | BSP | T | 12/19/2016 | PAID (REC#1390184) PLAN SPLICE FEE: $75 by: TCRIPPEN for Plumbing: plumbing splice 12-19-16 | TCRIPPEN | TCRIPPEN | | BSP | T | 5371214 |
HEATING & PLUMBING ENGINEERS, INC | BSP | T | 12/15/2016 | PAID (REC#1390184) PLAN SPLICE FEE: $75 by: JUSTINC for Mechanical | JUSTINC | JUSTINC | | BSP | T | 5369341 |
BRYAN CONSTRUCTION, INC. | BSP | T | 12/06/2016 | PAID (REC#1390182) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Plan revisions - as- builts | MICHAELA | MICHAELA | | BSP | T | 5361045 |
BRYAN CONSTRUCTION, INC. | BSP | T | 12/01/2016 | PAID (REC#1386219) ADDITIONAL PLAN REVIEW TIME: $50 From: SHELBY Revise power pole locations E 2.2b, E2.2C, E2.3A revise transformer feeder schedule E 5.1------Revise lighting E 1.0b, 1.0c, 1.1a, 1.1b, 1.1c, 1.2a, 1.2b, 1.2c, 1.3a, 1.3b, 1.3c, 1.4b, 10.4c, 2.0b, 2.1a, 2.1b, 2.1c, 2.3b, 2.3c, 2.4a, 2.4b, 2.4c, 3.0c, 3.1a, 3.1b | SHELBY | SHELBY | | BSP | T | 5357332 |
BRYAN CONSTRUCTION, INC. | BFR | P | 10/28/2016 | remainder of 3rd floor phase 5 framing OK pending other roughs | DANE | DANE | | BFR | P | 5330547 |
BRYAN CONSTRUCTION, INC. | B= | P | 10/21/2016 | still need knee protection at all disposals under all break room sinks in phases 1, 2, 3, and 4 / all other items from Phases 1, 2, 3, and 4 corrected -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, BIBLE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, HEATING & PLUMBING ENGRS, INC Mechanical Final Inspection is not Completed yet, HEATING & PLUMBING ENGRS, INC Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5324779 |
BRYAN CONSTRUCTION, INC. | BFR | P | 10/21/2016 | need to frame both sets of bathrooms at 3rd floor in phase 5 / all other phase 5 framing OK | DANE | DANE | | BFR | P | 5324774 |
BRYAN CONSTRUCTION, INC. | BSP | P | 10/06/2016 | Training with Dane S -- For phase 4, reviewed IB construction in type B occupancies, Reviewed building final inspection requirements including path of egress, exits signs, and requirements for door hardware along the accessible route -- Reviewed accessible restroom requirements including sink height, grab bar location and height requirements, partition width requirements as well as other accessible requirements -- Reviewed break room requirements including sink height and appliance height requirements -- For phase 5, reviewed IB construction in type B occupancies, Reviewed steel stud framing requirements, as well as restroom framing requirements including backing needed at accessible restrooms | DAKOTAB | DAKOTAB | | BSP | P | 5312281 |
BRYAN CONSTRUCTION, INC. | B= | P | 10/06/2016 | phase 4 / need knee protection at both break rooms for disposals under sinks / training with Dakota B on IB construction type B occ on final inspections and path of egress and accessible route and accessibility issues -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, BIBLE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, HEATING & PLUMBING ENGRS, INC Mechanical Final Inspection is not Completed yet, HEATING & PLUMBING ENGRS, INC Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5312263 |
BRYAN CONSTRUCTION, INC. | BFR | P | 10/06/2016 | phase 5 framing at main entry and break room and bathrooms OK pending other rough inspections / training with Dakota B on IB construction in type B occ training | DANE | DANE | | BFR | P | 5312255 |
HEATING & PLUMBING ENGINEERS, INC | BSP | T | 09/07/2016 | PAID (REC#1367682) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Duct layout revisions, t-stats relocated, | JUSTINC | JUSTINC | | BSP | T | 5287088 |
BRYAN CONSTRUCTION, INC. | BFR | P | 08/11/2016 | phase 4 level 4 building B interior walls and soffit framing OK pending other roughs | DANE | DANE | | BFR | P | 5266782 |
BRYAN CONSTRUCTION, INC. | BFR | P | 08/04/2016 | Phase 4, 4th floor, Building C: All interior wall and soffit framing OK. Discussed accessible elements with Pat, Bryan Const. | JEREMYA | JEREMYA | | BFR | P | 5261648 |
BRYAN CONSTRUCTION, INC. | B= | P | 07/21/2016 | phase 3 / need parallel approach clear floor space at service counter at market / need knee protection under sink at break room at building 3 third floor west break room / rest of phase 3 OK pending other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, BIBLE ELECTRIC, INC. Electrical Final Inspection is not Completed yet, HEATING & PLUMBING ENGRS, INC Mechanical Final Inspection is not Completed yet, HEATING & PLUMBING ENGRS, INC Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5250632 |
HEATING & PLUMBING ENGINEERS, INC | BSP | T | 06/28/2016 | PAID (REC#1340000) PLAN SPLICE FEE: $150 by: TCRIPPEN for Plumbing: plumbing splice 3-27-16 | TCRIPPEN | TCRIPPEN | | BSP | T | 5232344 |
BRYAN CONSTRUCTION, INC. | BSP | T | 05/31/2016 | PAID (REC#1332343) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Revise floor plan - wall types | MICHAELA | MICHAELA | | BSP | T | 5210863 |
BRYAN CONSTRUCTION, INC. | B= | P | 05/24/2016 | Phase 1 final inspection - need knee protection at break room sink and paper towel dispenser lowered to 48" to bottom at service level building B break room -- need knee protection at sink in building C 1st floor break room -- in fitness center in phase 1 the laundry equipment is pre existing -- in mens and womens locker rooms the shelves in the coat nook must be between 40 and 48" above the floor per ANSI A117.1 803.5 -- need to lower one of the paper towel dispensers in the workout room to 48" above the floor -- the signs for the mens and womens locker rooms need to be 60" to the center / Phase 2 building B all beak room sinks need knee protection and paper towel dispensers lowered to 48" max. -- all restroom signs need to be raised to 60" to center of signs in both phase 1 and phase 2 / need listing for all cut in floor outlets at phase 2 -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Insp | DANE | DANE | | B= | P | 5206815 |
BRYAN CONSTRUCTION, INC. | BFR | P | 05/24/2016 | fire caulking for penetrations at grid lines C and 22 from previous inspection OK / spoke to Dan of Bible Electric and Pat of Bryan const. about still needing listing for rated floor boxes | DANE | DANE | | BFR | P | 5206769 |
BRYAN CONSTRUCTION, INC. | BFR | P | 05/16/2016 | framing OK pending other roughs at grid lines 26 to 19 and BB3 to H / still need to splice in removal of rated chase from previous inspection / will need to check fire caulk at penetrations behind south wall of market at grid line c and 22 / have product information for rated floor boxes but still need listing for them | DANE | DANE | | BFR | P | 5199864 |
BRYAN CONSTRUCTION, INC. | BFR | P | 05/04/2016 | wall framing at phase 3 at grid lines 26 to 37 and A to N OK pending other roughs / soffit framing at elevator bank at phase 3 grid lines 23 to 24 and f to d OK pending other rough inspections / still need to splice in change to plan deleting rated walls for planned exhaust chase that has been removed at grid lines E and between 33 ans 34 - plans now calling wall detail S13R 2 hour rated / still need listing for rated boxes that have been cored into the rated floor ceiling assemblies / construction super not on site - walked with Dan of Bible electric and discussed need for listings for rated floor boxes | DANE | DANE | | BFR | P | 5191548 |
BRYAN CONSTRUCTION, INC. | BFR | P | 02/18/2016 | soffit framing OK at both phase 2 break rooms and at stair 4 pending other rough inspections / reviewed accessibility with super | DANE | DANE | | BFR | P | 5137148 |
BRYAN CONSTRUCTION, INC. | BFR | P | 02/05/2016 | all wall framing at phase 2 OK pending other rough inspections / need to splice in change to plan deleting rated walls for planned exhaust chase that has been removed at grid lines E and between 33 ans 34 - plans now calling wall detail S13R 2 hour rated / need to check all hard lids and soffits still / will need to inspect all penetrations through rated floors and ceilings when ready | DANE | DANE | | BFR | P | 5129109 |
BIBLE ELECTRIC, INC. | BSP | T | 02/04/2016 | PAID (REC#1312100) PLAN SPLICE FEE: $100 by: SHELBY for Electrical: See E 1.0B through E1.4C---E 2.1A, 2.1C, 2.3A, 8.0CA, 8.0A many other sheets in this set of splice pages with no clouded items | SHELBY | SHELBY | | BSP | T | 5128264 |
HEATING & PLUMBING ENGINEERS, INC | BSP | P | 01/12/2016 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: minor changes to cfm's and vav's | JUSTINC | JUSTINC | | BSP | P | 5114527 |
HEATING & PLUMBING ENGINEERS, INC | BSP | T | 01/07/2016 | PAID (REC#1310429) PLAN SPLICE FEE: $125 by: TCRIPPEN for Plumbing: plumbing splice 1-7-16 | TCRIPPEN | TCRIPPEN | | BSP | T | 5112136 |
BRYAN CONSTRUCTION, INC. | BFR | P | 12/15/2015 | men's and women's shower rooms and workout rooms OK / Wall at break room with service elevator behind it patched OK from previous inspection / This concludes the framing in phase 1 | DANE | DANE | | BFR | P | 5099270 |
BRYAN CONSTRUCTION, INC. | BFR | P | 10/21/2015 | pending elec, plumb, fire and mech rough inspections, phase 1 service walls okay and phase 1 on first floor break room walls okay, will need to inspect shaft liner in break room prior to drywall | BOBF | BOBF | | BFR | P | 5062217 |
BRYAN CONSTRUCTION, INC. | BFR | P | 10/08/2015 | Met with Pat of Bryan construction. Discussed job phasing and accessible elements. Partial frame in phase 1 to grid line 28 pending electric, plumbing, and fire rough inspections. | TOMG | TOMG | | BFR | P | 5053688 |
BIBLE ELECTRIC, INC. | E= | C | 03/27/2018 | FIRE ALARM INSPECTION: John completed on 2.27.2018 / | ROB | ROB | | E= | C | 5799621 |
BIBLE ELECTRIC, INC. | E= | C | 03/27/2018 | FIRE ALARM INSPECTION: Johnn copleted on 2.27.2018 / | ROB | ROB | | E= | C | 5799613 |
BIBLE ELECTRIC, INC. | ER | C | 03/27/2018 | FIRE ALARM INSPECTION: Johnn completed on 2.27.2018 / | ROB | ROB | | ER | C | 5799611 |
BIBLE ELECTRIC, INC. | E= | C | 03/26/2018 | Electrical complete / | ROB | ROB | | E= | C | 5799400 |
BIBLE ELECTRIC, INC. | E= | C | 02/27/2018 | FIRE ALARM INSPECTION: | JOHNN | JOHNN | | E= | C | 5774980 |
BIBLE ELECTRIC, INC. | ER | C | 02/27/2018 | FIRE ALARM INSPECTION: | JOHNN | JOHNN | | ER | C | 5774979 |
BIBLE ELECTRIC, INC. | ER | P | 02/27/2018 | grid,see plans, all except electrical rm, | JOHNN | JOHNN | | ER | P | 5774976 |
BIBLE ELECTRIC, INC. | ER | P | 02/12/2018 | FIRE ALARM INSPECTION: Partial for ceiling and walls highlited and dated on prints / | ROB | ROB | | ER | P | 5763474 |
BIBLE ELECTRIC, INC. | ER | P | 02/05/2018 | marked/dated on small copy of prints, will enlarge at final | GARYL | GARYL | | ER | P | 5757415 |
BIBLE ELECTRIC, INC. | ER | P | 11/30/2017 | ceilings only, marked and dated on prints | GARYL | GARYL | | ER | P | 5698981 |
BIBLE ELECTRIC, INC. | ER | P | 11/30/2017 | FIRE ALARM INSPECTION: ceilings only, marked and dated on prints | GARYL | GARYL | | ER | P | 5698942 |
BIBLE ELECTRIC, INC. | ER | P | 11/16/2017 | FIRE ALARM INSPECTION: marked/dated on prints | GARYL | GARYL | | ER | P | 5687905 |
BIBLE ELECTRIC, INC. | ER | P | 10/19/2017 | marked/dated on prints, 7-lights in ceiling | GARYL | GARYL | | ER | P | 5661333 |
BIBLE ELECTRIC, INC. | ER | P | 09/29/2017 | FIRE ALARM INSPECTION: marked/dated on prints, ceilings only | GARYL | GARYL | | ER | P | 5641085 |
BIBLE ELECTRIC, INC. | ER | P | 09/29/2017 | marked/dated on prints, | GARYL | GARYL | | ER | P | 5641083 |
BIBLE ELECTRIC, INC. | E= | P | 09/14/2017 | marked and dated on prints ceilings only | GARYL | GARYL | | E= | P | 5626022 |
BIBLE ELECTRIC, INC. | ER | P | 09/13/2017 | marked and dated on prints, ceilings only | GARYL | GARYL | | ER | P | 5625139 |
BIBLE ELECTRIC, INC. | E= | P | 08/31/2017 | Marked/dated on prints rooms that have a partial final | GARYL | GARYL | | E= | P | 5613053 |
BIBLE ELECTRIC, INC. | ER | P | 08/30/2017 | ceilings only, marked and dated on prints, | GARYL | GARYL | | ER | P | 5612106 |
BIBLE ELECTRIC, INC. | ER | P | 08/30/2017 | FIRE ALARM INSPECTION: NOTE! Phase 7 B complete | GARYL | GARYL | | ER | P | 5612095 |
BIBLE ELECTRIC, INC. | ER | P | 08/16/2017 | marked/dated on prints, ceilings only | GARYL | GARYL | | ER | P | 5597960 |
BIBLE ELECTRIC, INC. | ER | P | 08/08/2017 | marked and dated on prints | GARYL | GARYL | | ER | P | 5589513 |
BIBLE ELECTRIC, INC. | ER | P | 08/03/2017 | marked and dated on prints, NOTE! Spencer has a dated sheet with 2 recept's on it and location, signed | GARYL | GARYL | | ER | P | 5585536 |
BIBLE ELECTRIC, INC. | ER | P | 07/19/2017 | marked/dated on prints | GARYL | GARYL | | ER | P | 5569866 |
BIBLE ELECTRIC, INC. | E= | P | 06/02/2017 | Partial final for 7 A | GARYL | GARYL | | E= | P | 5524684 |
BIBLE ELECTRIC, INC. | ER | P | 06/02/2017 | corridor, above ceiling, Partial final on 7 A | GARYL | GARYL | | ER | P | 5524681 |
BIBLE ELECTRIC, INC. | E= | P | 06/01/2017 | FIRE ALARM INSPECTION: this phase 7 A is okay to final | GARYL | GARYL | | E= | P | 5523346 |
BIBLE ELECTRIC, INC. | ER | P | 06/01/2017 | FIRE ALARM INSPECTION: Marked and dated on prints, ceilings only phase 7 "A" | GARYL | GARYL | | ER | P | 5523343 |
BIBLE ELECTRIC, INC. | ER | P | 05/18/2017 | WRONG PERMIT FOR WORK DONE,,,,,,, Note! the walls were looked at and are okay, they will call in correct permit number Monday??? NOTE! temporary walls for temp power for temporary kitchen | GARYL | GARYL | | ER | P | 5511063 |
BIBLE ELECTRIC, INC. | ER | P | 04/27/2017 | Mark and dated on prints | GARYL | GARYL | | ER | P | 5489640 |
BIBLE ELECTRIC, INC. | ER | P | 04/25/2017 | marked and dated on prints | GARYL | GARYL | | ER | P | 5486745 |
BIBLE ELECTRIC, INC. | ER | P | 04/25/2017 | FIRE ALARM INSPECTION: | GARYL | GARYL | | ER | P | 5486731 |
BIBLE ELECTRIC, INC. | ER | P | 04/24/2017 | ceilings only, marked and dated on prints | GARYL | GARYL | | ER | P | 5485828 |
BIBLE ELECTRIC, INC. | ER | P | 04/24/2017 | FIRE ALARM INSPECTION: marked and dated on prints | GARYL | GARYL | | ER | P | 5485818 |
BIBLE ELECTRIC, INC. | ER | P | 04/06/2017 | hard lids and cut in recept's in room co1.F360, marked and dated on prints | GARYL | GARYL | | ER | P | 5467167 |
BIBLE ELECTRIC, INC. | ER | P | 03/27/2017 | Walls only, marked and dated on prints | GARYL | GARYL | | ER | P | 5456948 |
BIBLE ELECTRIC, INC. | E= | P | 02/23/2017 | marked and dated on prints | GARYL | GARYL | | E= | P | 5423717 |
BIBLE ELECTRIC, INC. | E= | P | 02/23/2017 | marked/dated on prints, | GARYL | GARYL | | E= | P | 5423716 |
BIBLE ELECTRIC, INC. | ER | P | 02/21/2017 | ceilings only, marked and dated on prints | GARYL | GARYL | | ER | P | 5420871 |
BIBLE ELECTRIC, INC. | ER | P | 02/21/2017 | ceilings only, marked and dated on prints | GARYL | GARYL | | ER | P | 5420826 |
BIBLE ELECTRIC, INC. | ER | P | 02/14/2017 | ceilings only, marked/dated on prints | GARYL | GARYL | | ER | P | 5414940 |
BIBLE ELECTRIC, INC. | ER | P | 02/09/2017 | wrong phone number 719.323.3077 CEILINGS only, marked and dated on prints | GARYL | GARYL | | ER | P | 5411156 |
BIBLE ELECTRIC, INC. | ER | L | 02/08/2017 | called 2x's, left a message, went to construction office no one available | GARYL | GARYL | | ER | L | 5409911 |
BIBLE ELECTRIC, INC. | ER | P | 02/03/2017 | ceilings only, marked/dated on prints | GARYL | GARYL | | ER | P | 5406670 |
BIBLE ELECTRIC, INC. | ER | P | 02/03/2017 | marked and dated on prints---walls | GARYL | GARYL | | ER | P | 5406660 |
BIBLE ELECTRIC, INC. | ER | P | 01/24/2017 | ceilings only, marked/dated on prints | GARYL | GARYL | | ER | P | 5397347 |
BIBLE ELECTRIC, INC. | ER | P | 01/23/2017 | walls only, marked and dated on prints | GARYL | GARYL | | ER | P | 5395868 |
BIBLE ELECTRIC, INC. | ER | P | 01/18/2017 | partial 4th floor area a wals see plans for location | BRET | BRET | | ER | P | 5391873 |
BIBLE ELECTRIC, INC. | EUG | P | 01/06/2017 | ESL and walls, marked and dated on prints | GARYL | GARYL | | EUG | P | 5383894 |
BIBLE ELECTRIC, INC. | ER | P | 12/21/2016 | small area for walls only,,, marked and dated on prints | GARYL | GARYL | | ER | P | 5374235 |
BIBLE ELECTRIC, INC. | E= | P | 12/15/2016 | HIGH LIGHTED ON E 2.3A -----OK | BRIAN | BRIAN | | E= | P | 5369605 |
BIBLE ELECTRIC, INC. | ER | P | 11/29/2016 | FIRE ALARM INSPECTION: above ceiling ok marked on plans | CRAIG | CRAIG | | ER | P | 5354626 |
BIBLE ELECTRIC, INC. | ER | P | 11/29/2016 | above ceiling -------------- marked on plans | CRAIG | CRAIG | | ER | P | 5354616 |
BIBLE ELECTRIC, INC. | ER | P | 11/22/2016 | above ceiling ----------- marked on plans | CRAIG | CRAIG | | ER | P | 5350889 |
BIBLE ELECTRIC, INC. | ER | P | 11/21/2016 | 3rd floor "a" building north ceilings see plans for location | BRET | BRET | | ER | P | 5349845 |
BIBLE ELECTRIC, INC. | ER | P | 11/21/2016 | FIRE ALARM INSPECTION: 3rd floor a building north ceilings | BRET | BRET | | ER | P | 5349841 |
BIBLE ELECTRIC, INC. | ER | P | 11/16/2016 | ceilings only, marked and dated on prints | GARYL | GARYL | | ER | P | 5346667 |
BIBLE ELECTRIC, INC. | ER | P | 11/16/2016 | ceilings only, marked/dated FIRE ALARM | GARYL | GARYL | | ER | P | 5346642 |
BIBLE ELECTRIC, INC. | ER | P | 11/14/2016 | FIRE ALARM INSPECTION: marked and dated on prints,,,,, ceilings only | GARYL | GARYL | | ER | P | 5343199 |
BIBLE ELECTRIC, INC. | ER | P | 11/14/2016 | marked and dated on prints,,,,,ceilings only | GARYL | GARYL | | ER | P | 5343189 |
BIBLE ELECTRIC, INC. | ER | P | 10/31/2016 | marked and dated on prints--walls only 3rd floor | GARYL | GARYL | | ER | P | 5332283 |
BIBLE ELECTRIC, INC. | ER | P | 10/24/2016 | walls only, marked and dated on prints | GARYL | GARYL | | ER | P | 5326357 |
BIBLE ELECTRIC, INC. | ER | P | 10/18/2016 | walls only, marked and dated on prints | GARYL | GARYL | | ER | P | 5321947 |
BIBLE ELECTRIC, INC. | ER | P | 10/04/2016 | walls only, marked and dated on prints | GARYL | GARYL | | ER | P | 5309989 |
BIBLE ELECTRIC, INC. | E= | P | 09/21/2016 | marked and dated on prints, panels okay | GARYL | GARYL | | E= | P | 5299297 |
BIBLE ELECTRIC, INC. | E= | P | 09/20/2016 | need to see panels--room locked ran out of time to wait, signed and dated on prints | GARYL | GARYL | | E= | P | 5297936 |
BIBLE ELECTRIC, INC. | E= | P | 09/20/2016 | FIRE ALARM INSPECTION: signed card for phase 4 final | GARYL | GARYL | | E= | P | 5297934 |
BIBLE ELECTRIC, INC. | ER | P | 09/07/2016 | above ceiling -------------- marked on plans | CRAIG | CRAIG | | ER | P | 5286576 |
BIBLE ELECTRIC, INC. | ER | P | 09/07/2016 | FIRE ALARM INSPECTION: 14/2 fplp --------- 16/2 fplp shielded to speakers | CRAIG | CRAIG | | ER | P | 5286571 |
BIBLE ELECTRIC, INC. | ER | P | 08/25/2016 | ceilings ok marked on plans | RANDY | RANDY | | ER | P | 5277871 |
BIBLE ELECTRIC, INC. | ER | P | 08/25/2016 | FIRE ALARM INSPECTION: same as electrical ceiling rough marked on plans | RANDY | RANDY | | ER | P | 5277864 |
BIBLE ELECTRIC, INC. | ER | R | 08/24/2016 | NOT READY | MIKEC | MIKEC | | ER | R | 5277387 |
BIBLE ELECTRIC, INC. | ER | R | 08/24/2016 | FIRE ALARM INSPECTION: NOT READY | MIKEC | MIKEC | | ER | R | 5277345 |
BIBLE ELECTRIC, INC. | ER | P | 08/23/2016 | | MIKEC | MIKEC | | ER | P | 5276210 |
BIBLE ELECTRIC, INC. | ER | P | 08/23/2016 | FIRE ALARM INSPECTION: | MIKEC | MIKEC | | ER | P | 5276191 |
BIBLE ELECTRIC, INC. | ER | P | 08/11/2016 | see plans | MIKEC | MIKEC | | ER | P | 5267297 |
BIBLE ELECTRIC, INC. | ER | P | 08/09/2016 | SEE PLANS | MIKEC | MIKEC | | ER | P | 5264845 |
BIBLE ELECTRIC, INC. | ER | P | 08/03/2016 | SEE PLANS | MIKEC | MIKEC | | ER | P | 5261127 |
BIBLE ELECTRIC, INC. | E= | P | 07/07/2016 | 3rd floor building b see plans | BRET | BRET | | E= | P | 5239664 |
BIBLE ELECTRIC, INC. | EP | P | 07/07/2016 | transformer and panel 3b3 | BRET | BRET | | EP | P | 5239655 |
BIBLE ELECTRIC, INC. | E= | P | 06/22/2016 | building c 3rd | BRET | BRET | | E= | P | 5228416 |
BIBLE ELECTRIC, INC. | E= | P | 06/21/2016 | 3rd floor c see plans for locations. | BRET | BRET | | E= | P | 5227776 |
BIBLE ELECTRIC, INC. | ER | P | 06/13/2016 | CEILINGS SEE PLANS | MIKEC | MIKEC | | ER | P | 5221194 |
BIBLE ELECTRIC, INC. | ER | P | 06/13/2016 | FIRE ALARM INSPECTION: SEE CARD | MIKEC | MIKEC | | ER | P | 5221088 |
BIBLE ELECTRIC, INC. | ER | P | 06/07/2016 | FIRE ALARM INSPECTION: marked on plans same as electrical. | BRET | BRET | | ER | P | 5216271 |
BIBLE ELECTRIC, INC. | ER | P | 06/07/2016 | ceilings see plans for location marked 6-7-16 | BRET | BRET | | ER | P | 5216270 |
BIBLE ELECTRIC, INC. | ER | P | 05/26/2016 | ceilings only,,,, marked and dated on prints, bathrooms have LV wiring on ceiling tiles, janitors closet not ready | GARYL | GARYL | | ER | P | 5209584 |
BIBLE ELECTRIC, INC. | ER | P | 05/26/2016 | FIRE ALARM INSPECTION: marked and dated on prints,,,,,,,, ceilings only,, | GARYL | GARYL | | ER | P | 5209583 |
BIBLE ELECTRIC, INC. | ER | P | 05/25/2016 | FIRE ALARM INSPECTION: marked and dated on prints--ceilings only | GARYL | GARYL | | ER | P | 5208299 |
BIBLE ELECTRIC, INC. | ER | P | 05/25/2016 | marked and dated on prints,,, NOTE! need to remove L-V wiring on tiles,went over with Dan | GARYL | GARYL | | ER | P | 5208286 |
BIBLE ELECTRIC, INC. | ER | P | 05/23/2016 | ceilings only,, marked and dated on f/a prints | GARYL | GARYL | | ER | P | 5206287 |
BIBLE ELECTRIC, INC. | ER | P | 05/23/2016 | FIRE ALARM INSPECTION: ceilings only,, marked and dated on f/a prints | GARYL | GARYL | | ER | P | 5206281 |
BIBLE ELECTRIC, INC. | ER | P | 05/12/2016 | marked and dated on prints---walls only | GARYL | GARYL | | ER | P | 5198385 |
BIBLE ELECTRIC, INC. | ER | P | 05/10/2016 | marked and dated on prints | GARYL | GARYL | | ER | P | 5196140 |
BIBLE ELECTRIC, INC. | ER | P | 05/03/2016 | 3rd floor break room and center office area, marked on plans. | BRET | BRET | | ER | P | 5190816 |
BIBLE ELECTRIC, INC. | ER | P | 04/28/2016 | 3rd floor elevator lobby and "market" room walls only | GARYL | GARYL | | ER | P | 5187175 |
BIBLE ELECTRIC, INC. | E= | P | 04/11/2016 | 2 floor c building call center area. | BRET | BRET | | E= | P | 5174431 |
BIBLE ELECTRIC, INC. | E= | R | 04/08/2016 | canceled by Dan | BRET | BRET | | E= | R | 5173254 |
BIBLE ELECTRIC, INC. | E= | P | 04/07/2016 | marked and dated on prints | GARYL | GARYL | | E= | P | 5172626 |
BIBLE ELECTRIC, INC. | E= | P | 03/31/2016 | building b executive area see plans for location | BRET | BRET | | E= | P | 5166664 |
BIBLE ELECTRIC, INC. | ER | P | 03/18/2016 | B02.202 AND C02.F385 AND C202 ----------- MARK ON PLANS | CRAIG | CRAIG | | ER | P | 5158030 |
BIBLE ELECTRIC, INC. | ER | P | 03/18/2016 | FIRE ALARM INSPECTION: phase 2 only | CRAIG | CRAIG | | ER | P | 5158021 |
BIBLE ELECTRIC, INC. | ER | P | 03/16/2016 | ceilings,,, marked and dated on prints | GARYL | GARYL | | ER | P | 5156566 |
BIBLE ELECTRIC, INC. | ER | P | 03/16/2016 | FIRE ALARM INSPECTION: same ceilings as ER, marked and dated onprints | GARYL | GARYL | | ER | P | 5156548 |
BIBLE ELECTRIC, INC. | ER | P | 03/15/2016 | FIRE ALARM INSPECTION: areas same as electrical marked on plans dated 3-15 | BRET | BRET | | ER | P | 5155468 |
BIBLE ELECTRIC, INC. | ER | C | 03/15/2016 | ceilings see plans for locations, | BRET | BRET | | ER | C | 5155456 |
BIBLE ELECTRIC, INC. | ER | P | 03/14/2016 | FIRE ALARM INSPECTION: main floor south area ceilings ok see plans for locations. | BRET | BRET | | ER | P | 5154766 |
BIBLE ELECTRIC, INC. | ER | C | 03/14/2016 | partial main floor south area see plans. lacking furniture drops and vav work space. | BRET | BRET | | ER | C | 5154613 |
BIBLE ELECTRIC, INC. | ER | P | 03/09/2016 | ceiling see plans for locations. | BRET | BRET | | ER | P | 5151246 |
BIBLE ELECTRIC, INC. | ER | P | 03/09/2016 | FIRE ALARM INSPECTION: ceiling see plans for location | BRET | BRET | | ER | P | 5151242 |
BIBLE ELECTRIC, INC. | ER | P | 03/08/2016 | FIRE ALARM INSPECTION: marked and dated on prints,,,, ceilings only | GARYL | GARYL | | ER | P | 5150392 |
BIBLE ELECTRIC, INC. | ER | P | 03/08/2016 | fav 's need identified, leave tiles out for same,,,,,,, ceilings only, marked and dated on prints | GARYL | GARYL | | ER | P | 5150390 |
BIBLE ELECTRIC, INC. | E= | L | 03/01/2016 | couldn't get into this section | GARYL | GARYL | | E= | L | 5145514 |
BIBLE ELECTRIC, INC. | EP | P | 03/01/2016 | panels p-1 and c-1, xfrm, okay for power, will need to see labeling and neutral ID | GARYL | GARYL | | EP | P | 5145513 |
BIBLE ELECTRIC, INC. | E= | P | 02/24/2016 | breaker room: gfci disposal, | GARYL | GARYL | | E= | P | 5141598 |
BIBLE ELECTRIC, INC. | ER | P | 02/24/2016 | 2nd floor, 4- recessed cans, 1- exit light, will mark on prints tuesday, basement: work out room and breaker room, need gfci protection on disposal in breaker room | GARYL | GARYL | | ER | P | 5141499 |
BIBLE ELECTRIC, INC. | ER | P | 02/17/2016 | walls and hard lids 2nd floor see plans for locations. | RANDY | RANDY | | ER | P | 5135694 |
BIBLE ELECTRIC, INC. | ER | P | 02/09/2016 | walls see plans for locations. | BRET | BRET | | ER | P | 5130816 |
BIBLE ELECTRIC, INC. | E= | P | 02/03/2016 | rough only not ready for final. | BRET | BRET | | E= | P | 5127704 |
BIBLE ELECTRIC, INC. | ER | P | 02/03/2016 | ceiling and walls see plans for locations. | BRET | BRET | | ER | P | 5127703 |
BIBLE ELECTRIC, INC. | ER | P | 01/19/2016 | aerobic room, storage room off fitness corridor ok . fitness corridor not ready lift low volt cables off suspended ceiling. | BRET | BRET | | ER | P | 5118595 |
BIBLE ELECTRIC, INC. | ER | P | 01/19/2016 | FIRE ALARM INSPECTION: aerobic room, storage, fitness corridor see plans for locations. | BRET | BRET | | ER | P | 5118589 |
BIBLE ELECTRIC, INC. | ER | P | 01/06/2016 | ceilings fitness room. | BRET | BRET | | ER | P | 5111361 |
BIBLE ELECTRIC, INC. | E= | P | 01/06/2016 | break room and corridor main floor, service area ok. see plans. pending vav working space issue | BRET | BRET | | E= | P | 5111358 |
BIBLE ELECTRIC, INC. | EP | P | 01/06/2016 | new panel transformer and disconnect see plans, install handle-tie existing panels new circuits, color code voltage labels new panels see plans | BRET | BRET | | EP | P | 5111350 |
BIBLE ELECTRIC, INC. | ER | P | 01/06/2016 | FIRE ALARM INSPECTION: fitness room ceiling, | BRET | BRET | | ER | P | 5111347 |
BIBLE ELECTRIC, INC. | E= | P | 12/28/2015 | FIRE ALARM INSPECTION: service area and first floor corridor same as electrical rough see plans for locations. | BRET | BRET | | E= | P | 5106352 |
BIBLE ELECTRIC, INC. | ER | P | 12/23/2015 | FIRE ALARM INSPECTION: service level, break room and corridor | BRET | BRET | | ER | P | 5105008 |
BIBLE ELECTRIC, INC. | ER | P | 12/23/2015 | locker room ceilings , service level electric room ceiling, | BRET | BRET | | ER | P | 5104998 |
BIBLE ELECTRIC, INC. | ER | P | 12/21/2015 | FIRE ALARM INSPECTION: ceiling area same as electrical see plans. | BRET | BRET | | ER | P | 5102520 |
BIBLE ELECTRIC, INC. | ER | P | 12/21/2015 | ceiling and walls see plans for locations | BRET | BRET | | ER | P | 5102512 |
BIBLE ELECTRIC, INC. | ER | P | 12/10/2015 | walls group x, storage and locker rooms | BRET | BRET | | ER | P | 5096300 |
BIBLE ELECTRIC, INC. | ER | P | 12/07/2015 | FIRE ALARM INSPECTION: same area as electrical rough see plans | BRET | BRET | | ER | P | 5092786 |
BIBLE ELECTRIC, INC. | ER | P | 12/07/2015 | leave tiles out at all vav, working space and o.c protection. will need to inspect projector receptacles in all training rooms. see plans for locations. | BRET | BRET | | ER | P | 5092785 |
BIBLE ELECTRIC, INC. | ER | P | 12/02/2015 | training area see plans for locations, | BRET | BRET | | ER | P | 5090122 |
BIBLE ELECTRIC, INC. | ER | P | 12/02/2015 | FIRE ALARM INSPECTION: see plans same area as electrical | BRET | BRET | | ER | P | 5090116 |
BIBLE ELECTRIC, INC. | ER | P | 10/28/2015 | basement break room c01.f 385 walls and soffit marked on plans- | BRET | BRET | | ER | P | 5067546 |
BIBLE ELECTRIC, INC. | ER | P | 10/20/2015 | walls and soffit see plans for locations | BRET | BRET | | ER | P | 5062019 |
BIBLE ELECTRIC, INC. | ER | P | 10/07/2015 | labs 277,204,334,310,259,234,303 marked on plans. | BRET | BRET | | ER | P | 5052723 |
HEATING & PLUMBING ENGINEERS, INC | H= | C | 10/03/2018 | SECONDARY PROTECTION FOR FCB-3 OK.THE REST OF THE REQUESTED SPLICES HAVE BEEN RECEIVED . | LIDO | LIDO | | H= | C | 5983767 |
HEATING & PLUMBING ENGINEERS, INC | HSP | P | 08/22/2018 | SPLICES STILL NEEDED- REFER TO NOTES FROM 11/3/15 M1.0 C (BDA201) FCU-C-00 HAS BEEN MOVED FROM THE CORRIDOR TO THE CEILING ABOVE TELECOM ROOM. REFER TO NOTES DATED 3/30/17 M1.2A (BDA205) NEED REVISED/APPROVED PRINTS FOR NEW CLINIC AREA ON SECOND LEVEL AREA "A". (NOTES DATED 6/15/2016 ( HWP )PHASE 3 THIRD FLOOR AREA B- NEED TO VERIFY IF SECONDARY SHUT OFF WAS INSTALLED FOR FCU B-3.) | LIDO | LIDO | | HSP | P | 5941710 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 06/12/2018 | TEST AND BALANCE REPORT RECEIVED ( SEE IMAGES ) There are missing revised and approved plans requested on previous inspections / Contractor will need to verify all requested revised and approved plans haves gone through plans and review . | LIDO | LIDO | | H= | P | 5871217 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 04/30/2018 | There are missing revised and approved plans requested on previous inspections / Contractor will need to verify all requested revised and approved plans haves gone through plans and review .TEST AND BALANCE REPORT IS MISSING OUTSIDE AIR READINGS / RFER TO PLAN # M4.2 ( BDA-215) | LIDO | LIDO | | H= | P | 5830581 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 03/06/2018 | BUILDING -A - M1.1A - RECEIVED IMAGES OF MISSING THERMOSTATS / SENSORS IN PLACE SEE IMAGES -SEE IMAGES . Building -A -Plans are in the process for being revised and approved for plan # M1.1A For column lines A-C / 16-19 . changes for the vav's and duct in this area .NEED TEST AND BALANCE REPORT BY FINAL . | LIDO | LIDO | | H= | P | 5780510 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 02/28/2018 | Added to notes 3/1/18 - Building -A -Plans are in the process for being revised and approved for plan # M1.1A For column lines A-C / 16-19 . changes for the vav's and duct in this area .BUILDING- A- COLUMN LINES 12 TO 19 AND A TO F -Missing thermostats and sensors in room that vav-AI-C-2821 supply's at south wall / room that VAV-A1-C2252 supply's at north wall . SUPPLY AIR FINAL CONNECTIONS TO GRD'S , SLOT DIFFUSERS AND RETURN AIR LAY IN GRILLS OK .NEED TEST AND BALANCE REPORT BY FINAL . | LIDO | LIDO | | H= | P | 5776406 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 02/09/2018 | BUILDING -A - Plans are in the process for being revised and approved for plan # M1.1A For column lines A-C / 16-19 . changes for the vav's and duct in this area .ABOVE CEILING DUCT ROUGH , TRANSFER AIR AND VAVS OK / STILL NEED TO SEE FINAL CONNECTION TO GRD'S ,ALL THERMOSTATS AND SENSORS AND BALANCE REPORT AT FINAL. | LIDO | LIDO | | HD | P | 5762195 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 01/29/2018 | BUILDING -A- 1st FLOOR COLUMNS A-C AND 12-16 ABOVE CEILING SUPPLY AIR MEDIUM AND LOW PRESSURE DUCT ROUGH OK / VAV'S OK .(Need to consult with senior inspector and building in the morning for 8" medium pressure penetrating corridor A-111 wall . Will add to notes in the morning .Added to notes on 1/31/18 Corridor wall is not rated ) | LIDO | LIDO | | HD | P | 5750520 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 09/28/2017 | BUILDING -A 1st LEVEL COLUMN LINES 7-14 AND N-F HEAT FINAL OK.( PHASE 8 VAV B1-D288P2, B1-D288P1,A1-C2751 CHANGE OUT OK.) | LIDO | LIDO | | H= | P | 5639631 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 09/12/2017 | BUILDING -A LEVEL 1 COLUMN LINES 7-14 / N-F ABOVE CEILING DUCT ROUGH OK /OK TO WRAP.VAV B-352-I , B-402-I, B-426-I CHANGE OUT OK.CORRIDOR A -105, A -106 ABOVE CEILING AND FINAL CONNECTIONS TO S/A GRILLS AND R/A REGISTERS IN PLACE OK | LIDO | LIDO | | HD | P | 5623052 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 08/31/2017 | PHASE -7 - BUILDING - C - LEVEL -1 COLUMN LINES 26-30 , A-H / PHASE -7 - BUILDING - B COLUMN LINES 19-26, D-F , HEAT FINAL OK . PARTIAL PENDING TEST AND BALANCE REPORT. | LIDO | LIDO | | H= | P | 5612870 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 08/16/2017 | 1-17-18 THE FOLLOWING INSPECTION NOTES WERE MEANT TO BE FOR PERMIT NUMBER L23871 AND HAVE BEEN ENTERED ON THAT PERMIT. PERMIT L23871 WAS NOT OBTAINED AND CUSTOMER NEEDED THIS INSPECTION FOR THIS AREA OF THE BUILDING. . FIRST LEVEL AREA - B . ((PLANS ON SITE ARE STILL NOT APPROVED BY RBD PROCEED AT OWN RISK )). CONTRACTOR INSTALLING KITCHEN TYPE 1 HOODS NEED TO ADD ALL HOODS TO THERE SCOPE OF WORK AND CALL FOR INSPECTIONS . INSPECTED WALL BEHIND HOOD-7 NO COMBUSTIBLES IN WALL. .DO NOT ENCLOSE WALL BEHIND HOOD-7 GAS IS WALL STILL NEEDS TO BE INSPECTED NEED APPROVED PRINTS TO INSPECT GAS. | LIDO | LIDO | | HD | P | 5598026 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 08/14/2017 | FIRST LEVEL AREA -B .Need revised and approved prints. 12 " Spins installed for D229I Per inspection on 8/3/17. MECHANICAL INSTALL FROM PRINT NOT APPROVED BY RBD YET ,PROCEED AT OWN RISK . VAV'S B-1 D2051 , B-1 D157I, B-1 D184I INSULATION ,SLOT REGISTER CONNECTIONS AND REMOTE DAMPERS ABOVE HARD LIDS OK. | LIDO | LIDO | | HD | P | 5594504 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 08/09/2017 | GREASE DUCT LIGHT TEST FOR OK FOR HOODS 15-A, 15-B ,15-C ,7,35-A, OK. STILL NEED TO LIGHT TEST CONNECTIONS AT HOODS. | LIDO | LIDO | | HD | P | 5590535 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 08/08/2017 | GREASE DUCT INSPECTION FOR HOODS # 7, 15-C, 35-A, FOUND MORE THAN 8 HOLES , STOPPED INSPECTION AT 22 X 14 TAP. | LIDO | LIDO | | HD | P | 5589114 |
HEATING & PLUMBING ENGINEERS, INC | HSP | P | 08/08/2017 | FIRST LEVEL AREA B , WENT OVER THE ISSUES WITH THE NEW GREASE DUCT TYING INTO THE EXISTING GREASE DUCT . THE EXISTING GREASE DUCT IS IN A SHAFT. THE REVISED PRINT ON THE JOB SITE , NOT YET APPROVED BY RBD , SHOWS GREASE DUCT WRAP ON NEW KITCHEN GREASE DUCT.THE CODE DOES NOT ALLOW FOR TWO DIFFERENT FORMS OF FIRE PROTECTION FOR THE GREASE DUCT REFER TO IMC CODE 506.3.10 THROUGH 506.3.10.3 | LIDO | LIDO | | HSP | P | 5588467 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 08/07/2017 | GREASE DUCT INSPECTION FOR HOOD 15 -A AND 15 - B, THREE HOLES FOUND , RE CALL INSPECTION FOR TOMORROW . | LIDO | LIDO | | HD | P | 5588405 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 08/03/2017 | BUILDING-B LEVEL 1 ABOVE CEILING DUCT ROUGH OK / OK TO WRAP . D233I NOT INSTALLED YET, MISSING 3 12" SPINS FOR D229I LOW PRESSURE BRANCHES, Need grease duct inspection , BY FINAL NEED APPROVED AND REVISED PRINTS | LIDO | LIDO | | HD | P | 5584633 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 07/07/2017 | ABOVE CEILING IN THE FOLLOWING AREA'S OK FOR WRAP - 1ST FLOOR AREA B AND C - ALL SA / RA AND TRANSFER OK | JERRYF | JERRYF | | HD | P | 5557487 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 05/04/2017 | PHASE 7 AREA "A" AND CLINIC. PROVIDE LETTER FROM RUSKIN REGARDING DAMPER OVER DOUBLE DOOR. STILL NEED REVISED/APPROVED PRINTS FOR MECHANICAL IN CLINIC AREA. LABEL ALL CEILING GRID AT DAMPERS. ABOVE CEILING ALL OK PENDING REVISED/APPROVED PRINTS. RETAINING ANGLES ON FOUR DAMPERS IN RATED CORRIDOR OK. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5496276 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 04/20/2017 | FRAMING ABOVE DOUBLE DOOR OK PENDING RECEIPT OF ENGINEER LETTER SHOWING FRAMING DETAIL. | NANCY | NANCY | | HD | P | 5482139 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 04/05/2017 | NEED REVISED/APPROVED PRINTS SHOWING ALL NEW MECHANICAL IN CLINIC AREA. NEED MECHANICAL ENGINEER TO PROVIDE DETAILED DRAWING FOR FIRE/SMOKE DAMPER FRAMING OVER DOUBLE WIDE DOOR. ENGINEER TO ALSO PROVIDE LETTER STATING FRAMING MEETS THE INTENT OF THE DAMPER MANUFACTURERS UL LISTING. PHASE 7, AREA "A", SECOND LEVEL: NO HOLES ALLOWED IN DAMPER FRAMING. ABOVE CEILING ALL OK EXCEPT FOR DAMPERS AND CORRIDOR. OK TO INSULATE | NANCY | NANCY | | HD | P | 5465714 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 03/30/2017 | NEED REVISED/APPROVED PRINTS FOR NEW CLINIC AREA ON SECOND LEVEL AREA "A". RBD STAMPED SET SHOWS THIS AREA AS NOT IN CONTRACT. 60 LB TEST OK ON CHILLED WATER SUPPLY/RETURN FROM HALLWAY TO CLINIC IDF ROOM. CONTRACTOR HAS SENT IN RFI REGARDING WHERE TO TIE IN LINES IN HALLWAY, NO ANSWER YET. OK TO INSULATE AND LABEL. CONDENSATE DRAIN IN WALL OK. | NANCY | NANCY | | HWP | P | 5460822 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 02/21/2017 | PHASE 6, AREA "A" FIRST AND FOURTH FLOORS. ABOVE CEILING ALL OK. PHASE 6 COMPLETE PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5420091 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 02/03/2017 | PHASE 6 AREA "A" SOC: ROUGH ABOVE CEILING OK. AREA "A" FOURTH FLOOR ROUGH ABOVE CEILING OK. OK TO WRAP. | NANCY | NANCY | | HD | P | 5406168 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 12/23/2016 | PHASE 6, BUILDING A, FIRST FLOOR NORTH: NEED REVISED/APPROVED PRINTS FOR AREA SHOWN AS NOT IN CONTRACT. ROUGH MEDIUM/LOW PRESSURE SUPPLY DUCTS OK, OK TO WRAP. NO SOC AREA YET. | NANCY | NANCY | | HD | P | 5375817 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 12/02/2016 | PHASE 5 BUILDING "A" SECOND AND THIRD FLOORS COMPLETE. PROVIDE TEST AND BALANCE REPORT BY FINAL | NANCY | NANCY | | H= | P | 5359032 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 11/15/2016 | PHASE 5, THIRD FLOOR, BUILDING "A": ROUGH ABOVE CEILING ALL OK. OK TO WRAP. NO FLEX OR DIFFUSERS YET. | NANCY | NANCY | | HD | P | 5344749 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 11/09/2016 | PHASE 5 SECOND FLOOR AREA "A", NORTH SIDE: VAV'S AND ROUGH DUCTS ABOVE CEILING OK. OK TO WRAP. | NANCY | NANCY | | HD | P | 5340304 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 10/25/2016 | PHASE 5, AREA "A" SECOND LEVEL (LOBBY). ROUGH DUCTS AND VAV'S ABOVE CEILING OK. VERIFY WITH ELECTRICAL INSPECTOR THAT ALL REQUIRED CLEARANCES HAVE BEEN MET FOR ACCESS INTO SERVICE SIDE OF VAV'S. NO DIFFUSERS YET. | NANCY | NANCY | | HD | P | 5327165 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 09/08/2016 | PHASE FOUR, FOURTH FLOOR, AREA B: INSTALL MISSING RETURN AIR GRILLS. MEDIUM CONFERENCE D-204 LACKS RETURN AIR PATH. PROVIDE TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5288065 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 08/31/2016 | PHASE 4 AREA C: MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5282333 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 08/25/2016 | PHASE 4 AREA B. ROUGH DUCTS, VAV'S AND FLEX OK. OK TO WRAP. SLOT DIFFUSERS INSTALLED. STILL NEED TO SEE LAY-INS INSTALLED. | NANCY | NANCY | | HD | P | 5277844 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 08/19/2016 | PHASE 4 AREA C ROUGH DUCT OK. VAV'S AND FLEX ARE INSTALLED AT THIS TIME. OK TO FINISH DUCT WRAP.. | LUKE | LUKE | | HD | P | 5273237 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 06/15/2016 | PHASE 3 THIRD FLOOR AREA B. FCU B-03: PIPING TO FAN COIL UNDER WORKING PRESSURE, NO VISIBLE LEAKS. OK TO LABEL INSULATION. INSTALL SECONDARY SHUT OFF IN PAN. | NANCY | NANCY | | HWP | P | 5222823 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 06/15/2016 | PHASE 3 AREA B: ABOVE CEILING ALL OK. AREA B COMPLETE EXCEPT FOR INSTALLING SECONDARY SHUT OFF AT FCU B-03,, LABELING CHILLED WATER LINES AND RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5222818 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 05/31/2016 | PHASE 3 AREA C: ABOVE CEILING ALL OK. AREA C COMPLETE EXCEPT FOR TEST AND BALANCE REPORT. PHASE 3 AREA B: ROUGH ABOVE CEILING OK, OK TO WRAP. BY FINAL NEED REVISED/APPROVED PRINTS FOR GRID LINES 21 TO 25 AND BB3 TO B. | NANCY | NANCY | | HD | P | 5211025 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 05/16/2016 | PHASE 3 AREA C, GRID LINES 26 TO 30: ROUGH ABOVE CEILING OK. OK TO WRAP. OK TO INSTALL DIFFUSERS. | NANCY | NANCY | | HD | P | 5200229 |
HEATING & PLUMBING ENGINEERS, INC | HWP | P | 05/16/2016 | 100 LB TESTOK ON CHILLED WATER SUPPLY/RETURN IN WALL ENCLOSURE OVER TO FCU B-03 OK. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | P | 5200222 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 05/12/2016 | PHASE 3, AREA C, GRID LINES 30 TO 37: ROUGH ABOVE CEILING OK. OK TO WRAP. OK TO INSTALL DIFFUSERS. | NANCY | NANCY | | HD | P | 5197801 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 03/21/2016 | STILL NEED INSPECTION OF SAUNA IN FITNESS LEVEL ONE. PHASE TWO MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. PHASE TWO , AREA C, NORTH EAST QUADRANT ABOVE CEILING ALL OK. | NANCY | NANCY | | H= | P | 5159250 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 03/14/2016 | PHASE 2. AREA B: ABOVE CEILING ALL OK. AREA C: ROUGH DUCTS ALL COMPLETE. OK TO WRAP ALL. ABOVE CEILING, INCLUDING FLEX AND DIFFUSERS, ALL OK EXCEPT FOR THE NORTH EAST QUADRANT OF AREA C. | NANCY | NANCY | | HD | P | 5154404 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 02/25/2016 | AREA C: ALL FIRE/SMOKE DAMPERS THAT USED TO BE IN A RATED WALL MUST EITHER BE REMOVED OR INSTALLED PER MANUFACTURERS INSTRUCTIONS. WEST SIDE OK, OK TO WRAP. AREA B: OK TO WRAP. | NANCY | NANCY | | HD | P | 5142544 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 01/28/2016 | WHO IS PULLING A PERMIT ON SAUNAS IN LOCKER ROOMS? PHASE ONE LOCKER ROOMS AND FITNESS GRDS COMPLETE, OK TO CLOSE UP CEILING. NOTE: PENDING TEST AND BALANCE. | LUKE | LUKE | | H= | P | 5125456 |
HEATING & PLUMBING ENGINEERS, INC | H= | P | 12/03/2015 | SERVICE LEVEL B AND C: ABOVE CEILING ALL OK. NEED TEST AND BALANCE REPORT AND REVISED/APPROVED PRINTS BEFORE COMPLETION OF TOTAL PROJECT. | NANCY | NANCY | | H= | P | 5091436 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 11/03/2015 | M1.0C: ROUGH SUPPLY DUCTS AND LATERALS OK, OK TO WRAP. FCU-C-00 HAS BEEN MOVED FROM THE CORRIDOR TO THE CEILING ABOVE TELECOM ROOM. DRAIN PAN REQUIRED? ACCESS TO CONTROLS ON BOX? NEED REVISED PRINTS. M1.1C ADDENDUM 4: SUPPLY AIR OK, OK TO WRAP. EXHAUST OK. GENERAL CONTRACTOR MUST PROVIDE SERVICE ACCESS TO FAN, FIRE DAMPERS AND DRYER VENT CLEANOUTS ABOVE NEW SOFFIT IN BREAK ROOM. EXISTING LAUNDRY ROOM APPEARS TO LACK MAKE-UP AIR. | NANCY | NANCY | | HD | P | 5071868 |
HEATING & PLUMBING ENGINEERS, INC | HD | P | 10/09/2015 | SERVICE LEVEL. M1.0B: SUPPLY AIR OK, OK TO WRAP. M1.0C: SUPPLY AIR OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5054258 |
HEATING & PLUMBING ENGINEERS, INC | P= | C | 05/01/2018 | this was completed under permit # L23871 on 3/9/18 | JOHNS | JOHNS | | P= | C | 5831819 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 09/05/2017 | ok for womens 1b bathroom, @ mens bathroom urinal needs to be 15" minimum from partition wall, rest ok. | JOHNS | JOHNS | | P= | P | 5615631 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 08/29/2017 | ok for dwv, water, and hot loop @ rest room 1 A. note: vtr (existing), hammer aerestors installed with panel @ mens rest room | JOHNS | JOHNS | | PTO | P | 5610553 |
HEATING & PLUMBING ENGINEERS, INC | PTO | L | 08/17/2017 | contractor cancelled via email to inspector | JOHNS | JOHNS | | PTO | L | 5598897 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 08/08/2017 | Joel added note 8/9/17, Revise plans to show new work in servery areas. ok for domestic water in wall and above ceiling @ servery, dish wash room, bonus room, and janitor cloest, no approved plans found on site. note: 8 back flow preventors in dish wash room | JOHNS | JOHNS | | PTO | P | 5589467 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 08/02/2017 | NOTE : ALL DOMESTIC HOT AND COLD , TO INCLUDE DWV FROM LINE 2.0 TO LINE 24 ON TEST TO PLAN , PLAN PAGE SP 1.1 V FOR FUTURE REFERENCE | GABE | GABE | | PTO | P | 5584207 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 07/17/2017 | SERVEREY DWV AREA B , BETWEEN LINES A AND C5 LINE 26 THROUGH 23 OK | GABE | GABE | | PTO | P | 5565940 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 06/29/2017 | hot loop in men's and woman's rest room area 1 b , altered water for ada toilets , tempering in wall , will have access by final | GABE | GABE | | PTO | P | 5551593 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 05/11/2017 | 2 A CLINIC , ALL SINKS ARE TEMPERED , ALL TO PLAN | GABE | GABE | | P= | P | 5502844 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/27/2017 | walls and ceiling 2A clinic ok to cover | TED | TED | | PTO | P | 5457097 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 02/27/2017 | 1st floor break room, 4th floor A area break room, 2- men's and 2- woman's rooms | TED | TED | | P= | P | 5426379 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 02/15/2017 | DWV AND WATER IN WALL ON TEST TO PLAN , TEMPERING IN WALL , WILL HAVE ACCESS AT FINAL | GABE | GABE | | PTO | P | 5416603 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 01/26/2017 | 4A NORTH , MENS AND WOMANS BATH GROUPS AND BREAK ROOM , DWV AND WATER , HAMMER ARRESTERS AND TEMPERING IN WALL , WILL HAVE ACCESS AT FINAL | GABE | GABE | | PTO | P | 5399909 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 01/23/2017 | 4A SOUTH , MENS AND WOMAN'S BATH , DWV AND WATER | GABE | GABE | | PTO | P | 5396259 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 01/06/2017 | 1ST FLOOR BREAK SINK , DWV AND WATER , ALL TO PLAN , NEED TO SEE WATER TIE IN AND HANGERS AT FINAL | GABE | GABE | | PB | P | 5384176 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 12/12/2016 | NOTE : 2A BREAK ROOM AND MEN'S AND WOMAN'S REST ROOM , ALL TEMPERED AND HAMMER ARRESTERS INSTALLED , 3A SAME ALL TO PLAN | GABE | GABE | | P= | P | 5366150 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 11/14/2016 | 3RD FLOOR MEN'S AND WOMAN'S REST ROOM DWV AND WATER ON TEST , HAMMER ARRESTER AND TEMPERING IN WALL , ACCESS AT FINAL | GABE | GABE | | PTO | P | 5344086 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 11/07/2016 | in walls DWV and H2O ok at 3rd floor area AB. | TAYLOR | TAYLOR | | PTO | P | 5337959 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 10/06/2016 | AREA A SECOND FLOOR HOT LOOP , ON TEST , TO PLAN | GABE | GABE | | PTO | P | 5311687 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 10/04/2016 | 2ND FLOOR AREA A REST ROOMS MEN'S AND WOMAN'S TOILET WALL ALL COLD ONLY , HAMMER ARRESTER IN WALL , ACCESS AT FINAL , TO PLAN | GABE | GABE | | PTO | P | 5309512 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 10/04/2016 | 4TH FLOOR AREA B AND C REST ROOMS , BREAK AREA , NURSES STATION , CLINICAL SINK OK , 3RD FLOOR AREA BAND C BREAK AREA , MENS AND WOMAN'S REST ROOM , AND MARKET , ALL TO PLAN | GABE | GABE | | P= | P | 5309507 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 08/16/2016 | NURSING STATION IN AREA B 4TH FLOOR DWV AND WATER , BREAK ROOM AREA B 4TH FLOOR ,DWV AND WATER , ON TEST TO PLAN , SINKS ARE TEMPERED , ACCESS BY FINAL | GABE | GABE | | PTO | P | 5269966 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 08/05/2016 | DWV ONLY ON TEST AT BREAK ROOM IN AREA C | GABE | GABE | | PTO | P | 5262375 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 08/04/2016 | HOT WATER LOOP AT AREA B AND AREA C , REST ROOMS , ALL SINKS ARE TEMPERED , HAMMER ARRESTER INSTALLED IN COLD SIDE , WILL HAVE ACCESS TO ALL AT FINAL | GABE | GABE | | PTO | P | 5262242 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/16/2016 | 3rd level at area B walls and above ceiling H2O/ DWV ok. | TAYLOR | TAYLOR | | PTO | P | 5199803 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/04/2016 | AREA C BREAK ROOM , TRAP PRIMER AND TEMPERING IN WALL , WILL HAVE ACCESS AT FINAL | GABE | GABE | | PTO | P | 5192192 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 05/02/2016 | HOT WATER RECIRC LOOP IN BATH AT 3RD FLOOR AREA B AND C , ALL LAVS ARE TEMPERED , HAMMER ARRESTER IN WALL , ALL WILL HAVE ACCESS BY FINAL | GABE | GABE | | PTO | P | 5190223 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 04/13/2016 | 2ND FLOOR AREA B REST ROOMS , ALL SINKS TEMPERED , HAMMER ARRESTERS INSTALLED , 2ND FLOOR AREA C BATH GROUPS AND BREAK ROOM , ALL SINKS TEMPERED , HAMMER ARRESTERS INSTALLED TO PLAN | GABE | GABE | | P= | P | 5175898 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 04/13/2016 | 3RD FLOOR MARKET DWV AND WATER COLD ONLY UNDER BELLY ON TEST TO PLAN | GABE | GABE | | PTO | P | 5175893 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 03/09/2016 | 1ST FLOOR MENS AND WOMANS REST ROOM AREA C OK , LOCKER ROOMS 1 ST FLOOR AREA C OK | GABE | GABE | | P= | P | 5150964 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/09/2016 | AREA C BREAK ROOM DWV OK | GABE | GABE | | PTO | P | 5150961 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 03/07/2016 | AREA B BREAK ROOM DWV AND H20 IN WALL OK , TO EXISTING VENT OTHER SIDE OF BREAK ROOM WALL . TEMPERING ADDED IN OTHER BREAK ROOM AREA B , AREA C BREAK ROOM ABOVE FLOOR VENT ONLY | GABE | GABE | | PTO | P | 5149643 |
HEATING & PLUMBING ENGINEERS, INC | P= | L | 03/02/2016 | no call ahead number, unknown area of inspection. | TAYLOR | TAYLOR | | P= | L | 5146609 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 02/19/2016 | HOT LOOP THROUGH BATH GROUP ON 2ND FLOOR AREA B AND C ALL LAVS TEMPERED , WILL HAVE ACCESS TO ALL AT FINAL | GABE | GABE | | PTO | P | 5137808 |
HEATING & PLUMBING ENGINEERS, INC | P= | P | 12/23/2015 | NOTE : SERVICE LEVEL BREAK SINK , RP INSTALLED FOR ICE MAKER , MENS AND WOMANS REST ROOMS COMPLETE TO INCLUDE MOP SINK , HAMMER ARRESTERS AND TRAP PRIMERS IN , TEMPERING AT ALL SINKS | GABE | GABE | | P= | P | 5105199 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 12/09/2015 | 1ST FLOOR LOCKER ROOMS DWV AND WATER , ALL SINKS TEMPERED | GABE | GABE | | PTO | P | 5095644 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 10/29/2015 | NOTE :MAIN BATH GROUPS IN AREA C COMPLETE , TEMPERING AT ALL LAVS , TO HAVE ACCESS AT FINAL | GABE | GABE | | PTO | P | 5068879 |
HEATING & PLUMBING ENGINEERS, INC | PTO | L | 10/27/2015 | canceled by contractor | GABE | GABE | | PTO | L | 5065924 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 10/21/2015 | AREA C 1ST FLOOR BREAK ROOM DWV AND WATER OK , FLOOR SINK AREA C CORRIDOR ,AND H20 OK | GABE | GABE | | PTO | P | 5062941 |
HEATING & PLUMBING ENGINEERS, INC | PTO | P | 10/19/2015 | WATER IN WALL FOR JANITOR CLOSET OK , MENS AND WOMANS BATH ROOMS WATER IN WALL , EXISTING TRAP PRIMER AND HAMMER ARRESTER INSTALLED | GABE | GABE | | PTO | P | 5060980 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 10/05/2015 | FLOOR SINK , JANITOR CLOSET DWV , AREA C SERVICE LEVEL | GABE | GABE | | PB | P | 5051021 |
HEATING & PLUMBING ENGINEERS, INC | PRD | C | 10/05/2015 | OK TO COVER , PRD ON TEST , SERVICE LEVEL AREA C | GABE | GABE | | PRD | C | 5051020 |
HEATING & PLUMBING ENGINEERS, INC | PB | P | 10/02/2015 | PHASE ONE BREAK ROOM AREA B DWV AND WATER OK , TRAP PRIMER AT FLOOR DRAIN , NEED TRAP GUARD AT FLOOR SINK , NO TEST ON ROOF DRAINS DUE TO WEATHER . RE INSPECT PRD | GABE | GABE | | PB | P | 5049251 |
HEATING & PLUMBING ENGINEERS, INC | XMS | T | 09/24/2018 | PAID (REC#1542341) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: clouded revision | DALEH | DALEH | | XMS | T | 5974792 |
BIBLE ELECTRIC, INC. | XES | T | 04/12/2018 | PAID (REC#1493751) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: As - built revisions. See summary. | BERTHA | BERTHA | | XES | T | 5815734 |
HEATING & PLUMBING ENGINEERS, INC | XPS | T | 04/05/2018 | PAID (REC#1493745) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 4-5-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5808667 |
HEATING & PLUMBING ENGINEERS, INC | XPS | T | 03/23/2018 | PAID (REC#1489275) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: mechanical splice 3-23-18 | TCRIPPEN | TCRIPPEN | | XPS | T | 5797387 |
HEATING & PLUMBING ENGINEERS, INC | XMS | P | 01/26/2018 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: Minor layout revisions | JUSTINC | JUSTINC | | XMS | P | 5748740 |
BIBLE ELECTRIC, INC. | XES | P | 01/26/2018 | PLAN SPLICE: (No Fee) by: BERTHA for Electrical: Revised lighting and power. Updated panel schedules. | BERTHA | BERTHA | | XES | P | 5748690 |
BRYAN CONSTRUCTION, INC. | XBS | T | 01/26/2018 | PAID (REC#1478551) PLAN SPLICE FEE: $50 by: MICHAELA for Construction: Minor architectural changes | MICHAELA | MICHAELA | | XBS | T | 5748658 |