LOEWEN CONSTRUCTION, INC. | B= | C | 03/15/2016 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 5154893 |
LOEWEN CONSTRUCTION, INC. | B= | P | 01/22/2016 | Building final OK pending mechanical complete / Verified 3 layer of sheetrock / Verified headwall fire caulk. Additional Inspections Required (computer generated): MECH ONE, INC. Mechanical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 5121282 |
LOEWEN CONSTRUCTION, INC. | BFR | C | 01/22/2016 | | BERTW | BERTW | | BFR | C | 5121056 |
LOEWEN CONSTRUCTION, INC. | BSP | P | 12/03/2015 | mineral wool ok /ok to start sheetrock/stagger 3 layers for inspection | BERTW | BERTW | | BSP | P | 5091272 |
LOEWEN CONSTRUCTION, INC. | BSP | R | 12/01/2015 | head of wall firecaulking needs to be re inspected when completed properly-detail on site for previous comments for east end of jamb needs all areas firesafed with rock wool and reinspected before any sheetrock can be installed/reviewed with Paul | BERTW | BERTW | | BSP | R | 5089246 |
LOEWEN CONSTRUCTION, INC. | BFR | P | 11/16/2015 | channels ok to beam flange per detail | BERTW | BERTW | | BFR | P | 5080046 |
LOEWEN CONSTRUCTION, INC. | BSP | P | 11/16/2015 | 3 layers of sheetrock ok/mineral wool ok at deck flutes ok-need fire caulk around all penetrations per architects detail/beam wrap inspection needed/_____need detail for east end of 1 hour wall where there is a void to turbine room occurs for some type of termination or firesafing detail/need door jamb details | BERTW | BERTW | | BSP | P | 5080043 |
LOEWEN CONSTRUCTION, INC. | BSP | T | 11/12/2015 | PAID (REC#1298952) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: fire rating details | SHELLEY | SHELLEY | | BSP | T | 5077828 |
LOEWEN CONSTRUCTION, INC. | BFR | P | 11/10/2015 | 2nd layer sheetrock ok at wall only/1 layer ok @ lid section over stairs-still need beam wrap detail and all other layers inspected/180 minute door frame sheetrock will not be able to slide into frame due to not wide enough-need letter for firesafing detail of 3 layers of sheetrock to jamb face/need to install electric box etensions for layers of sheetrock/need all previous comments addressed and all other rough inspections completed/contact Kyle | BERTW | BERTW | | BFR | P | 5076311 |
LOEWEN CONSTRUCTION, INC. | BFR | P | 11/06/2015 | putty packed boxes ok/1st layer sheetrock ok on listed wall assembly/need 2 new layers inspected separately for laps/will need head of wall detail for decking above rated wall/rock wool ok @ stair way head hard lid and framing ok-need to inspect all layers of sheetrock/detail for I-beam wrap for fire protection will not work on this application due to field conditions,need approved design for alternate methods and inspection on this item | BERTW | BERTW | | BFR | P | 5074543 |
LOEWEN CONSTRUCTION, INC. | BFR | P | 11/02/2015 | reviewed job with John job super/putty pack electric boxes >16 sq/in on 2 stud bays/call for first layer sheetrock inspection-leave box exposed/cut back demising wall @ reception window to allow for 3 layers of sheetrock to carry through/need through penetration firestopping detail for I-beams in 1 hr partition/still need beam and soffits inspected | BERTW | BERTW | | BFR | P | 5070397 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | C | 12/18/2015 | | BRIAN | BRIAN | | E= | C | 5101439 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | E= | R | 12/17/2015 | DOOR LOCKED NO ACCESS---NEED TO INSPECT CEILING MAKE SURE THERE IS NO TILE INSTALLED-------- | BRIAN | BRIAN | | E= | R | 5100577 |
GUARANTEE ELECTRICAL CONTRACTING, LLC | ER | P | 10/27/2015 | 2- OFFICES WALLS-----STILL NEED ENTRY AREA ADDED TO SCOPE OF WORK | BRIAN | BRIAN | | ER | P | 5066069 |
MECHONE, INC. | H= | C | 03/15/2016 | MECHANICAL FINAL OK. TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 5154892 |
MECHONE, INC. | H= | P | 12/17/2015 | PARTIAL PENDING TAB REPORT - REST OK - ALL F/SD DAMPER RETAINAGE AND ACCESS DOORS INSTALLED | JERRYF | JERRYF | | H= | P | 5100572 |
MECHONE, INC. | HD | P | 12/10/2015 | ABOVE CEILING OK IN THE FOLLOWING ROOMS 201 - 202 - 203 - F/SD DAMPER GAP OK STILL NEED EXHAUST IN RESTROOMS AND LOWER MECH. ROOM - NEED ALL DAMPER RETAINAGE VERIFIED AND ALL DUCT ACCESS DOORS INSTALLED NOTE TO INSPECTORS ACCESS IS NOW THROUGH SOUTH END GUARD SHACK | JERRYF | JERRYF | | HD | P | 5096125 |
MECHONE, INC. | HD | L | 12/09/2015 | CALLED AND LEFT MESSAGE WITH ROBERT. NO ACCESS TO SITE AT 9:25 AM. DOORS LOCKED. | NANCY | NANCY | | HD | L | 5094865 |
MECHONE, INC. | HD | P | 11/04/2015 | FRAMING FOR TWO FIRE/SMOKE DAMPERS OK. | NANCY | NANCY | | HD | P | 5072144 |
MECHONE, INC. | HD | P | 11/02/2015 | PROPERLY FRAME FIRE/SMOKE DAMPER OPENINGS. REMOVE SHEET ROCK ON ONE SIDE SO FRAMING CAN BE SEEN. | NANCY | NANCY | | HD | P | 5070123 |