RAINE BUILDING LLC. | B= | C | 09/01/2017 | item corrected | DANE | DANE | | B= | C | 5614223 |
RAINE BUILDING LLC. | B= | P | 04/27/2017 | side wall grab rail at east restroom must extend minimum 54" from back wall -- Schedule a new Building Final when above items are complete. | DANE | DANE | | B= | P | 5488882 |
RAINE BUILDING LLC. | BE | L | 04/27/2017 | Renewed at 4/27/2017 7:55:25 AM | TERRI | TERRI | | BE | L | 5488460 |
RAINE BUILDING LLC. | B= | P | 02/23/2016 | restrooms 119 and 120 need the vertical grab bars and accessible restroom signs / rest OK pending other finals -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), GREINER ELECTRIC, LLC Electrical Final Inspection is not Completed yet, JOHNSON BROTHERS PLUMBING & HEATING Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5140266 |
RAINE BUILDING LLC. | BSP | P | 01/26/2016 | PLAN SPLICE: (No Fee) by: DANM for Construction: Added ceiling cloud detail (per inspector) | DANM | DANM | | BSP | P | 5123184 |
RAINE BUILDING LLC. | BFR | P | 12/21/2015 | faming OK pending other rough inspections / discussed accessibility at 2 new bathrooms and break room with contractor / plan shows 36" tall sink at break room where 34" max will be required | DANE | DANE | | BFR | P | 5102670 |
GREINER ELECTRIC, LLC. | E= | C | 02/29/2016 | | BRET | BRET | | E= | C | 5144660 |
GREINER ELECTRIC, LLC. | E= | P | 02/24/2016 | gfci vending machine receptacles. lock-able switch in foyer for sign, 15 amp max on rtu 20 amp fuses and 20 amp breaker installed | BRET | BRET | | E= | P | 5141049 |
CINTAS FIRE PROTECTION | E= | C | 02/12/2016 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 5133725 |
GREINER ELECTRIC, LLC. | ER | P | 02/08/2016 | electrical ceiling rough ok pending f.a installation and inspection. | BRET | BRET | | ER | P | 5130239 |
GREINER ELECTRIC, LLC. | E= | P | 01/08/2016 | office' s 105 and 106 only ok | CRAIG | CRAIG | | E= | P | 5112476 |
GREINER ELECTRIC, LLC. | ER | P | 01/08/2016 | 5 lights in soffit for coffee bar area ok | CRAIG | CRAIG | | ER | P | 5112474 |
GREINER ELECTRIC, LLC. | ESL | C | 12/17/2015 | 7 floor boxes ok to cover | BRET | BRET | | ESL | C | 5101037 |
GREINER ELECTRIC, LLC. | ER | P | 12/17/2015 | walls ok no f.a | BRET | BRET | | ER | P | 5101036 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 02/19/2016 | MECHANICAL FINAL OK. | NANCY | NANCY | | H= | C | 5138188 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 02/19/2016 | TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | P | 5137670 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | H= | C | 02/10/2016 | GAS FINAL OK. | NANCY | NANCY | | H= | C | 5131910 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | HC | C | 02/10/2016 | 130,000 BTU'S ADDED TO EXISTING 2 LB METER. | NANCY | NANCY | | HC | C | 5131909 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | HI | C | 02/10/2016 | 10 LB TEST OK. INSTALLED AS PER PRINTS. | NANCY | NANCY | | HI | C | 5131908 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H16 | C | 01/20/2016 | LETTER FROM STRUCTURAL ENGINEER RECEIVED AND SCANNED. NO EXTRA FRAMING FOR NEW RTU-9 REQUIRED. | NANCY | NANCY | | H16 | C | 5119044 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 01/12/2016 | RELOCATED DIFFUSERS UP TO MATCH LINE OK EXCEPT COMPLETE SUPPLY IN CONFERENCE ROOM NEXT TO RECEPTION. COULD NOT GET INTO AREA PAST MATCH LINE. | NANCY | NANCY | | HD | P | 5114385 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | R | 01/11/2016 | NO CALL AHEAD NO ONE AT SECURITY OFFICE.. | LUKE | LUKE | | HD | R | 5113451 |
NIELSEN MECHANICAL CONTRACTORS, INC. | HD | P | 12/29/2015 | NEED GAS CONTRACTOR ADDED TO PERMIT FOR GAS TO NEW RTU-9. EXTRA STRUCTURAL SUPPORT REQUIRED FOR NEW UNIT? IF YES ENGINEER MUST PROVIDE DETAIL FOR EXTRA SUPPORT, BUILDING INSPECTOR WILL LOOK AT NEW SUPPORT. INSTALLING SMOKE DETECTOR FOR RTU-9? UNIT IS 2000 CFM BUT EQUIPMENT SCHEDULE SHOWS DETECTOR. RTU-9 TRUNK LINES, LATERALS, FLEX AND DIFFUSERS OK, OK TO WRAP LATERALS. REST OF MECHANICAL NOT LOOKED AT YET. | NANCY | NANCY | | HD | P | 5107194 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | P= | C | 04/25/2017 | CORRECTIONS MADE | GABE | GABE | | P= | C | 5485978 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | PE | L | 04/24/2017 | Renewed for Full Fee at 4/24/2017 2:58:42 PM (Receipt#1419475) | SABRINA | SABRINA | | PE | L | 5485566 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | P= | P | 02/23/2016 | FLUSH SHALL BE LOCATED ON OPEN SIDE OF WATER CLOSET , REST OK , NOTE : ALL LAVS ARE TEMPERED , CHECK VALVE AND HAMMER ARRESTERS INSTALLED | GABE | GABE | | P= | P | 5140289 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | PTO | C | 12/23/2015 | NOTE : DWV AND WATER ON TEST , ALL TO PLAN | GABE | GABE | | PTO | C | 5105056 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | PB | C | 12/22/2015 | BASE TO PLAN OK TO COVER , TRAP PRIMER INSTALLED , NEED TO SEE VENT TIE IN AT TOP OUT , AAV AT BREAK SINK BY FINAL | GABE | GABE | | PB | C | 5104301 |
JOHNSON BROTHER'S PLUMBING & HEATING LLC | PTO | P | 12/18/2015 | COPPER IN WALL , LEAVE ACCESS TO CHECK VALVE AT FINAL , HAMMER ARRESTERS AT WATER CONNECTED APPLIANCES , WALL ONLY | GABE | GABE | | PTO | P | 5102302 |