CMG CORP | B= | C | 02/16/2016 | | BERTW | BERTW | | B= | C | 5134563 |
CMG CORP | B= | P | 02/08/2016 | Temp CO: pending bldg and mech finals ( Expires: 3/9/2016 12:00:00 AM) | MINDY | MINDY | | B= | P | 5130069 |
RIAL HEATING AND AIR CONDITIONING, INC. | BSP | P | 02/08/2016 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: revised to show relocated water heater with gas also to show B-vent | JUSTINC | JUSTINC | | BSP | P | 5129799 |
CMG CORP | B= | P | 02/05/2016 | Building final complete pending mech and plumbing finals. Additional Inspections Required (computer generated): LANDMARK PLUMBING & HEATING, INC. Plumbing Final Inspection is not Completed yet, RIAL HEATING & AIR COND, INC Mechanical Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 5129423 |
RIAL HEATING AND AIR CONDITIONING, INC. | BSP | T | 02/03/2016 | PAID (REC#1311278) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: revised ductwork | JUSTINC | JUSTINC | | BSP | T | 5127654 |
EL PASO ELECTRIC, LLC. | BSP | T | 01/27/2016 | PAID (REC#1310613) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: remove MAU from scope | SHELBY | SHELBY | | BSP | T | 5124620 |
RIAL HEATING AND AIR CONDITIONING, INC. | BSP | T | 01/27/2016 | PAID (REC#1310612) PLAN SPLICE FEE: $50 by: DALEH for Mechanical | DALEH | DALEH | | BSP | T | 5123938 |
EL PASO ELECTRIC, LLC. | BSP | T | 01/20/2016 | PAID (REC#1309777): PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Revise one line and equipment on E-3 | SHELBY | SHELBY | | BSP | T | 5119142 |
CMG CORP | BFR | P | 12/21/2015 | framing at 5' pass through OK. | DAN | DAN | | BFR | P | 5103306 |
EL PASO ELECTRIC, LLC. | E= | C | 02/05/2016 | | MIKEC | MIKEC | | E= | C | 5129124 |
EL PASO ELECTRIC, LLC. | ER | C | 02/04/2016 | | MIKEC | MIKEC | | ER | C | 5128562 |
EL PASO ELECTRIC, LLC. | ES | P | 01/25/2016 | Commercial Service: 125 AMP 4-W ---OK TO SET METER--------------------NOTES----NEED TO CHANGE DRAWINGS TO SHOW PANEL WHERE DISCONNECT IS WITH ADDED LOADS------NEED TO OPEN THE SPACE AROUND THE TRANSFORMER PER 450.13-B ----- | BRIAN | BRIAN | | ES | P | 5122211 |
EL PASO ELECTRIC, LLC. | ER | P | 01/25/2016 | HALL AND ENTRY CEILINGS------- | BRIAN | BRIAN | | ER | P | 5122194 |
EL PASO ELECTRIC, LLC. | ER | P | 12/22/2015 | WALLS | MIKEC | MIKEC | | ER | P | 5104204 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | C | 02/10/2016 | TAB REPORT RECEIVED AND VENT ADDED TO PERMIT | JERRYF | JERRYF | | H= | C | 5131175 |
RIAL HEATING AND AIR CONDITIONING, INC. | H= | P | 02/05/2016 | PENDING TEST AND BALANCE, AND STILL NEED SOMEONE TO CLAIM B-VENT FOR THE WATER HEATER.. | LUKE | LUKE | | H= | P | 5129435 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 02/05/2016 | GAS LINES COMPLETE.. | LUKE | LUKE | | H= | C | 5129380 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 02/04/2016 | OK TO FINISH GREASE WRAP. NOTE: STILL NEED SOMEONE TO CLAIM B-VENT FOR WATER HEATER.. OTHER CORRECTIONS MADE... | LUKE | LUKE | | HD | P | 5128366 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 02/03/2016 | IF WATER HEATER VENT IS NEW ADD VENT ONTO SCOPE OF WORK REPAIR THREE HOLES IN GREASE DUCT AT HOOD CONNECTION. REST OF GREASE DUCT OK. REPAIR OUTER SLEEVE OF MAKE-UP AIR FLEX DUCT. REMOVE SAG IN SUPPLY FLEX. | NANCY | NANCY | | HD | P | 5127355 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 01/29/2016 | USED EQUIPMENT IS BEING INSTALLED NEED TO SEE LISTING AND PAPER WORK ON TYPE ONE HOOD IN MAIN KITCHEN IT IS NOT SAME AS THE PRINTS CALL OUT FOR. NOTE: OK TO WRAP GREASE DUCT WITHIN TWO FEET FROM TOP SIDE OF THE HOOD STILL NEED TO SEE WELD AT HOOD. | LUKE | LUKE | | HD | P | 5126592 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 01/27/2016 | RELEASE METER | LUKE | LUKE | | HC | C | 5124520 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 01/27/2016 | 10 # GAS TEST GOOD ON NEW GAS LINES, RAN PER PLANS. NEED ALL CONNECTIONS MADE FOR FINAL.. | LUKE | LUKE | | HI | C | 5124519 |
RIAL HEATING AND AIR CONDITIONING, INC. | HD | P | 01/27/2016 | LIGHT TEST OK ON FLOOR FOR GREASE DUCT STILL NEED TO CHECK THREE WELDS AFTER DUCT IS INSTALLED ON TOP SIDE OF HOOD. NOTE: NEED TO SEE REVISED PLANS SHOWING IT'S OK TO USE EXISTING NONE TEMPERED MAKE UP AIR UNIT. | LUKE | LUKE | | HD | P | 5124517 |
LANDMARK PLUMBING AND HEATING, INC. | P= | C | 02/11/2016 | corrections made. | TAYLOR | TAYLOR | | P= | C | 5132201 |
LANDMARK PLUMBING AND HEATING, INC. | P= | P | 02/04/2016 | revise plans as previously noted for PB and PTO, rest ok. | TAYLOR | TAYLOR | | P= | P | 5128203 |
LANDMARK PLUMBING AND HEATING, INC. | PTO | P | 01/21/2016 | utility sink ok, by final revise plans to show existing 1 1/4 lines and sub meter. | TAYLOR | TAYLOR | | PTO | P | 5120189 |
LANDMARK PLUMBING AND HEATING, INC. | PB | C | 01/04/2016 | new base ok to cover, need plan revised to show grease trap existing out side of building | TED | TED | | PB | C | 5109281 |