ASPEN VIEW HOMES, LLC | B= | C | 10/03/2016 | | SCOTTS | SCOTTS | | B= | C | 5309009 |
ASPEN VIEW HOMES, LLC | B= | R | 09/30/2016 | no insulation at attic / seal penetrations by water heater | DALE | DALE | | B= | R | 5307934 |
ASPEN VIEW HOMES, LLC | BIN | C | 07/26/2016 | | SCOTTS | SCOTTS | | BIN | C | 5253761 |
ASPEN VIEW HOMES, LLC | BFR | C | 07/21/2016 | | DALE | DALE | | BFR | C | 5250342 |
ASPEN VIEW HOMES, LLC | BFR | R | 07/19/2016 | brace strong back every 4ft / missing anchors at splices / block garage door bracket / can not have knee wall at rim at water heater / garage ceiling 16" oc with living above | DALE | DALE | | BFR | R | 5248136 |
ASPEN VIEW HOMES, LLC | BSP | P | 06/21/2016 | Insulation in common wall at mech room and at attic OK | NICK | NICK | | BSP | P | 5226933 |
ASPEN VIEW HOMES, LLC | BSP | P | 06/20/2016 | Porch lid and posts OK | NICK | NICK | | BSP | P | 5225869 |
ASPEN VIEW HOMES, LLC | BFN | C | 06/17/2016 | Foundation modification design on file / all paper work on file | BRIANB | BRIANB | | BFN | C | 5224722 |
ASPEN VIEW HOMES, LLC | BFT | C | 06/17/2016 | Engineers observation Letter on file / all paper work on file | BRIANB | BRIANB | | BFT | C | 5224721 |
ASPEN VIEW HOMES, LLC | BSP | R | 06/16/2016 | front porch and common wall inspection requested / cancelled onsite by super / need correct plans for inspection / met with Jose, went over inspection history and need to complete foundation inspections prior to further inspections / still need engineer observation letters for repairs done to the foundation and need the design for the repairs / still need engineer observation letters for the the footing and foundation walls as well | BRIANB | BRIANB | | BSP | R | 5224038 |
ASPEN VIEW HOMES, LLC | BFN | R | 06/07/2016 | letter for foundation modification from RMG does not include inspection for repairs / need observation letter from engineer to include inspection of foundation modifications / still need foundation modification design | BRIANB | BRIANB | | BFN | R | 5216151 |
ASPEN VIEW HOMES, LLC | BFT | R | 06/07/2016 | letter for foundation modification from RMG does not include inspection for repairs / need observation letter from engineer to include inspection of foundation modifications / still need foundation modification design | BRIANB | BRIANB | | BFT | R | 5216148 |
ASPEN VIEW HOMES, LLC | BFI | C | 04/22/2016 | need observation letter including design for repairs around top of foundation completed prior to inspection / still need observation letters for foundation footing and wall to complete BFT and BFN inspections / spoke with site rep Tim on phone, all observations letters from RMG will be uploaded with inspection request next week / 2" R10 added at foundation repair okay / updated 6/17 - all paper work on file | BRIANB | BRIANB | | BFI | C | 5182635 |
ASPEN VIEW HOMES, LLC | BFI | P | 03/10/2016 | need to complete foundation inspection prior to next inspection / still need to complete drain inspection / updated 4/22 - no drain required per soils letter okay | BRIANB | BRIANB | | BFI | P | 5151900 |
ASPEN VIEW HOMES, LLC | BFD | C | 03/10/2016 | still need to complete foundation inspection / no drain installed - soils letter requires drain at crawl space areas / updated 4/22 - no drain required per soils letter okay - pending completion of foundation inspections / changed inspection from reject to partial / updated 6/17 - all paper work on file | BRIANB | BRIANB | | BFD | C | 5151897 |
ASPEN VIEW HOMES, LLC | BFN | R | 03/10/2016 | still need engineering letter of inspection for foundation / soils letter uploaded with inspection request - soils letter already on file | BRIANB | BRIANB | | BFN | R | 5151894 |
ASPEN VIEW HOMES, LLC | BFT | R | 03/10/2016 | still need engineering letter of inspection | BRIANB | BRIANB | | BFT | R | 5151887 |
ASPEN VIEW HOMES, LLC | BFI | R | 03/08/2016 | need to complete foundation inspection prior to next inspection / still need to complete drain inspection / 2" R10 foam installed 24" deep okay after drain inspection completed | BRIANB | BRIANB | | BFI | R | 5149762 |
ASPEN VIEW HOMES, LLC | BFD | R | 03/08/2016 | need to complete foundation inspection / soils on file / 2000psf / no drain installed - soils letter requires drain at crawl space / damp proof okay | BRIANB | BRIANB | | BFD | R | 5149683 |
ASPEN VIEW HOMES, LLC | BFN | P | 03/08/2016 | need letter of inspection for foundation system / foundation design on file / 2000psf | BRIANB | BRIANB | | BFN | P | 5149682 |
ASPEN VIEW HOMES, LLC | BFT | P | 11/12/2015 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFT | P | 5078079 |
ASPEN VIEW HOMES, LLC | BFN | P | 11/12/2015 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFN | P | 5078078 |
PEAK ELECTRIC INC. | E= | C | 08/25/2016 | a/c installed--25 amp-- | TIMA | TIMA | | E= | C | 5277761 |
PEAK ELECTRIC INC. | E= | R | 08/24/2016 | light to close to shelf master closet,need recept 6' of master sink gfci-----a/c installed--25 amp-- | TIMA | TIMA | | E= | R | 5276678 |
PEAK ELECTRIC INC. | ER | C | 07/12/2016 | #6 al --#10 A/C --- no multi --- no central vac --- slab on grade --- need access to ufer --- slab on grade | CRAIGS | CRAIGS | | ER | C | 5242575 |
PEAK ELECTRIC INC. | ES | C | 07/11/2016 | Residential Underground: 200 amp 3w new res ------------UFER is ir. | JOSEPH | JOSEPH | | ES | C | 5241385 |
PEAK ELECTRIC INC. | ER | R | 07/11/2016 | Not ready | JOSEPH | JOSEPH | | ER | R | 5241383 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 09/29/2016 | Note: A/C installed | MARKB | MARKB | | H= | C | 5305942 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 07/11/2016 | RELEASE METER | LUKE | LUKE | | HC | C | 5241760 |
CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 07/11/2016 | SLAB ON GRADE. A/C ROUGH LINE SET AND COIL OUTSIDE AIR TO RETURN COMBUSTION AIR FROM OUTSIDE.. | LUKE | LUKE | | HRR | C | 5241756 |
MD SERVICE PLUMBING, INC. | HI | C | 07/01/2016 | No gas line to kitchen range | MARKB | MARKB | | HI | C | 5235795 |
MD SERVICE PLUMBING, INC. | HI | P | 06/29/2016 | 10 lb test ok, 1 inch main, 1 furnace, 1 water heater, note: need to delete range. | TAYLOR | TAYLOR | | HI | P | 5234339 |
MD SERVICE PLUMBING, INC. | P= | C | 09/28/2016 | ok | DICK | DICK | | P= | C | 5304449 |
MD SERVICE PLUMBING, INC. | PTO | C | 06/30/2016 | aav left side double lav and all sinks less pedestal lav | DICK | DICK | | PTO | C | 5235351 |
MD SERVICE PLUMBING, INC. | PTO | P | 06/28/2016 | low test dwv main bathroom upper level. need freeze protection for water service at garage. | DICK | DICK | | PTO | P | 5232609 |
MD SERVICE PLUMBING, INC. | PB | C | 05/05/2016 | ok | DICK | DICK | | PB | C | 5192763 |