T.N. PARKER CONSTRUCTION, LLC | B= | C | 12/02/2016 | All other required Final inspections are complete. (This is a computer generated result) | NICK | NICK | | B= | C | 5358870 |
T.N. PARKER CONSTRUCTION, LLC | B= | P | 12/02/2016 | Building final OK pending mechanical final complete. Additional Inspections Required (computer generated): COLORADO COMMERCIAL REFRIG. Mechanical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 5358727 |
T.N. PARKER CONSTRUCTION, LLC | BFN | C | 12/02/2016 | Eng observation report for elevator foundation wall on file / Open hole on file | NICK | NICK | | BFN | C | 5358465 |
T.N. PARKER CONSTRUCTION, LLC | B= | P | 11/29/2016 | Need self closing door for access to grease duck / Need observation report for elevator footing and foundation / Need open hole report -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): COLORADO COMMERCIAL REFRIG. Mechanical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 5355259 |
T.N. PARKER CONSTRUCTION, LLC | BFR | C | 11/29/2016 | | NICK | NICK | | BFR | C | 5355252 |
T.N. PARKER CONSTRUCTION, LLC | BSP | P | 11/01/2016 | Letter for mechanical inspector Nancy / Refrigeration coolant amount | NICK | NICK | | BSP | P | 5332654 |
FRONTIER MECHANICAL SYSTEMS INC | BSP | T | 10/04/2016 | PAID (REC#1368023) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised schedules | JUSTINC | JUSTINC | | BSP | T | 5309284 |
T.N. PARKER CONSTRUCTION, LLC | BLA | C | 09/22/2016 | Lath for new chaise, door and window on west side OK | NICK | NICK | | BLA | C | 5300189 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 09/14/2016 | Soffit frame at exterior chase OK | NICK | NICK | | BFR | P | 5292909 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 09/08/2016 | Frame for exterior shafts OK | NICK | NICK | | BFR | P | 5287894 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 08/12/2016 | Frame for lid in kitchen OK | NICK | NICK | | BFR | P | 5268193 |
T.N. PARKER CONSTRUCTION, LLC | BFN | P | 08/11/2016 | New pads for exterior shaft liner OK / Design for pads on file / Still need all Eng for trash enclosure per Dan's comments on Feb 10th 2016 | NICK | NICK | | BFN | P | 5267330 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 08/01/2016 | Gas pipe penetrations through shaft OK | NICK | NICK | | BFR | P | 5258966 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 07/29/2016 | Frame and shaft for U415 at upper level in dining area OK / Need listings for through penetrations in shaft | NICK | NICK | | BFR | P | 5257255 |
T.N. PARKER CONSTRUCTION, LLC | BSP | P | 07/27/2016 | Walked job site with Steve / Reviewed requirements for U415 shaft construction for grease duct / New partition wall in kitchen OK / Post in kitchen wrapped with 5/8 OK in kitchen / 5/8 rock in over cooler OK / Upstairs dinner areas OK | NICK | NICK | | BSP | P | 5255839 |
FRONTIER MECHANICAL SYSTEMS INC | BSP | T | 06/09/2016 | PAID (REC#1334442) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: splice to relocated duct | DALEH | DALEH | | BSP | T | 5218880 |
T.N. PARKER CONSTRUCTION, LLC | B= | P | 06/01/2016 | Final for salon area only / Building final OK for salon area / Need all other finals for this area -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection HD= by HEALTHDEPT is not Completed yet, BARE TUB & STOVE COMPANY Mechanical Final Inspection is not Completed yet, ELECTRIC SERVICE OF CO, LLC Electrical Final Inspection is not Completed yet, FRONTIER MECHANICAL SYSTEMS INC Mechanical Final Inspection is not Completed yet, FRONTIER MECHANICAL SYSTEMS INC Plumbing Final Inspection is not Completed yet, KONE, INC. Mechanical Final Inspection is not Completed yet, PEAK HEATING & AIR COND, INC. Mechanical Final Inspection is not Completed yet. | NICK | NICK | | B= | P | 5212289 |
T.N. PARKER CONSTRUCTION, LLC | BSP | P | 05/24/2016 | Reviewed construction for shaft of grease duct / Need Mechanical inspection for hood and grease duct / Still need letter for all welding and bolting of new beams and post | NICK | NICK | | BSP | P | 5206747 |
T.N. PARKER CONSTRUCTION, LLC | BSP | P | 04/29/2016 | Met with Steve of TN Parker and reviewed walk in cooler area / Need to maintain 5/8 lid through entire lid of cooler for VA construction type | NICK | NICK | | BSP | P | 5187931 |
T.N. PARKER CONSTRUCTION, LLC | BLA | P | 04/27/2016 | Lath for elevator shaft OK / Still need to see lath for exterior mechanical shaft at front of building / Need to have elevator inspection done with elevator permit | NICK | NICK | | BLA | P | 5185789 |
T.N. PARKER CONSTRUCTION, LLC | BSP | P | 04/21/2016 | inspection was for mechanical vent hood penetration in floor. Hood was not build as per spec to miss bar joists. Mechanical contractor is getting documentation from hood manufacture to make it a "0" clearance hood. Per Nancy needs to see documentation before approval. Once approved the can complete rated shaft. | DAN | DAN | | BSP | P | 5181614 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 04/15/2016 | Framing for elevator shaft OK / Need to splice into approved plans new steel beam and posts in elevator shaft / Reviewed with Steve insulation for shaft | NICK | NICK | | BFR | P | 5178147 |
T.N. PARKER CONSTRUCTION, LLC | BSP | P | 04/01/2016 | Mineral wool in 1st floor ceiling corridor for fire stop OK / 5/8 rock runs to deck in new corridor main level / Reviewed with Neal and Steve and mechanical inspector Nancy hood and ducks, will need Eng design spliced in to RBD | NICK | NICK | | BSP | P | 5167777 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 03/18/2016 | All letters for soffits, columns, and corridor on file / Saw rock in ceiling above ducks in basement / Reviewed accessibility with Steve / All 1st floor framing OK pending all roughs / Saw new metal studs in wall for hood / Saw double layer 5/8 on existing wood wall at hood wall / Will need to do penetration inspection | NICK | NICK | | BFR | P | 5158362 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 03/09/2016 | Posts for LVL's on upper floor OK, can wrap / Will need judgment for point loads in lower level / Spoke with Neil about getting detail for hood wall in kitchen | NICK | NICK | | BFR | P | 5151198 |
T.N. PARKER CONSTRUCTION, LLC | BSP | P | 03/09/2016 | Screw pattern for listed corridor walls OK | NICK | NICK | | BSP | P | 5151197 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 03/04/2016 | reviewed rated construction details on site/Met with Steve framing foreman all details are on site/lower level corridor walls and soffits in same area ok pending other roughs completed/reviewed salon area ducts through rated floor ceiling assemblies-need all framing and dampers inspected before any sheetrock in these areas | BERTW | BERTW | | BFR | P | 5148192 |
T.N. PARKER CONSTRUCTION, LLC | BSP | P | 03/04/2016 | Training with Bert W on 5A construction for I1, A2, and B occ / Training on horizontal assembly and reading details for them | NICK | NICK | | BSP | P | 5148170 |
T.N. PARKER CONSTRUCTION, LLC | BFR | P | 02/26/2016 | basement salon walls and lid only/need to continue sheetrock for rated floor ceiling assembly above ducts not as a soffit unless a detail is provided/lower level corridor as built not on plans compromised floor ceiling assembly by not prerocking before framing soffit-this occurs in the upper level den areas also-----no more inspections until this is corrected with a stamped detail from the designer/all rc channel needs to repaired at all rated floor ceiling assemblies,splices,screwing pieced etc.firestopping ok at top plate penetrations in den areas,fire blocking at soffits ok/restrooms reviewed accessible elements with Bert building rep/restroom walls and lid ok pending damper framing inspected/only approved framing at restrooms and salon areas/no sheetrock allowed to be installed anywhere else/pending other roughs completed | BERTW | BERTW | | BFR | P | 5143537 |
T.N. PARKER CONSTRUCTION, LLC | BSP | P | 02/25/2016 | additional comments from 2/18 framing inspection; Met with Ray Terrell. Vice President with RMT Architecture 303-332-2507. Went over concerns for the building Type VA; The need for listing for the different penetrations in the 1hr floor ceiling assembles. Also a detail for the rated soffit added in the lower level. | DAN | DAN | | BSP | P | 5142908 |
T.N. PARKER CONSTRUCTION, LLC | BFR | R | 02/18/2016 | dining room, #103 and Solon #001; Need electrical rough, mechanical rough, and plumbing. Missing listing for penetration through walls and floors. Missing fire stop; Need detail for lower level soffit rated membrane in new soffit. | DAN | DAN | | BFR | R | 5136903 |
T.N. PARKER CONSTRUCTION, LLC | BSP | P | 02/12/2016 | ok to use engineer to do footing and foundation inspections with letters to follow | BERTW | BERTW | | BSP | P | 5134091 |
T.N. PARKER CONSTRUCTION, LLC | BFT | P | 02/10/2016 | Open excavation observation on file for trash enclosure from EEC, Don Peach , #39595. Look at 2 3' sections of under pinning of footer at existing, per section #3 on sheet S0.1. OK to pour pending acceptable open hole observation. Talked with Neal Parker regarding having engineer doing foundation inspections in future. | DAN | DAN | | BFT | P | 5131967 |
FRONTIER MECHANICAL SYSTEMS INC | BSP | T | 02/08/2016 | PAID (REC#1316598) PLAN SPLICE FEE: $50 by: TCRIPPEN for Mechanical: gas layout, kitchen hoods updated, furnaces updated. | TCRIPPEN | TCRIPPEN | | BSP | T | 5130029 |
T.N. PARKER CONSTRUCTION, LLC | BFT | P | 02/05/2016 | trash enclosure footer and screen wall footer just west of new elevator OK pending acceptable open hole with psf of 1,500. | DAN | DAN | | BFT | P | 5129267 |
FRONTIER MECHANICAL SYSTEMS INC | BSP | P | 02/05/2016 | PLAN SPLICE: (No Fee) by: JUSTINC for Mechanical: revised duct at furnaces, gas revisions | JUSTINC | JUSTINC | | BSP | P | 5129033 |
FRONTIER MECHANICAL SYSTEMS INC | BSP | T | 02/03/2016 | PAID (REC#1311396) PLAN SPLICE FEE: $50 by: TCRIPPEN for Plumbing: plumbing splice 2-3-16 | TCRIPPEN | TCRIPPEN | | BSP | T | 5127396 |
T.N. PARKER CONSTRUCTION, LLC | BSP | T | 01/27/2016 | PAID (REC#1311397) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: changes to one line and floor plan, added to east scope | SHELBY | SHELBY | | BSP | T | 5124758 |
T.N. PARKER CONSTRUCTION, LLC | BSP | T | 01/27/2016 | PAID (REC#1311397) PLAN SPLICE FEE: $50 by: SHELLEY for Construction: Various interior and structural changes | SHELLEY | SHELLEY | | BSP | T | 5124666 |
T.N. PARKER CONSTRUCTION, LLC | BSP | T | 12/02/2015 | PAID (REC#1301935) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Changing lightind sheet E 3.0 clouded areas | SHELBY | SHELBY | | BSP | T | 5089808 |
T.N. PARKER CONSTRUCTION, LLC | BSP | T | 11/25/2015 | PAID (REC#1301175) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: removing various electrical | SHELBY | SHELBY | | BSP | T | 5087706 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | C | 11/22/2016 | LIBRARY AND COMMON AREA-- | BRIAN | BRIAN | | E= | C | 5350970 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | C | 10/17/2016 | FIRE ALARM INSPECTION: power and fire alarm ok | JOHNN | JOHNN | | E= | C | 5320292 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 09/09/2016 | mc cables up the outside mech chase---ok | BRIAN | BRIAN | | ER | P | 5289108 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 07/12/2016 | KITCHEN WALLS | MIKEC | MIKEC | | ER | P | 5243244 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | R | 07/08/2016 | NO ONE ON SITE--NOT SURE WHAT YOU WANT-----KITCHEN LOOKS DONE??? | BRIAN | BRIAN | | ER | R | 5240632 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | P | 06/27/2016 | KITCHEN AND LIBRARY | MIKEC | MIKEC | | E= | P | 5231598 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | C | 06/24/2016 | FIRE ALARM INSPECTION: | MIKEC | MIKEC | | E= | C | 5230535 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | C | 06/24/2016 | FIRE ALARM INSPECTION: | MIKEC | MIKEC | | E= | C | 5230534 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | C | 06/24/2016 | FIRE ALARM INSPECTION: | MIKEC | MIKEC | | ER | C | 5230533 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 06/24/2016 | SEE PLANS | MIKEC | MIKEC | | ER | P | 5230532 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | P | 06/01/2016 | BEAUTY SALON | MIKEC | MIKEC | | E= | P | 5212733 |
ELECTRIC SERVICE OF COLORADO, LLC | E= | P | 06/01/2016 | FIRE ALARM INSPECTION: BEAUTY SALON | MIKEC | MIKEC | | E= | P | 5212614 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 03/25/2016 | FIRE ALARM INSPECTION: SEE PLANS | MIKEC | MIKEC | | ER | P | 5162384 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 03/25/2016 | | MIKEC | MIKEC | | ER | P | 5162383 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 03/04/2016 | SEE PLANS | MIKEC | MIKEC | | ER | P | 5147884 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 03/04/2016 | FIRE ALARM INSPECTION: SEE PLANS | MIKEC | MIKEC | | ER | P | 5147880 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 02/18/2016 | GROUND AND FIRST RLOOR------SEE PLANS-----PARTIAL WALLS AND HARD LIDS-----HALL PRE ROCK----- | BRIAN | BRIAN | | ER | P | 5137220 |
ELECTRIC SERVICE OF COLORADO, LLC | ER | P | 02/18/2016 | FIRE ALARM INSPECTION: SEE PLANS-----BOXES AND WIRE OK--- | BRIAN | BRIAN | | ER | P | 5137219 |
COLORADO COMMERCIAL REFRIGERATION, INC | H= | C | 12/02/2016 | CORRECTION MADE | JERRYF | JERRYF | | H= | C | 5358869 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | C | 11/16/2016 | MECHANICAL FINAL OK. | NANCY | NANCY | | H= | C | 5345763 |
COLORADO COMMERCIAL REFRIGERATION, INC | H= | P | 11/16/2016 | PERMANENTLY LABEL CONDENSERS. REST OK. | NANCY | NANCY | | H= | P | 5345756 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 11/15/2016 | TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | P | 5344279 |
COLORADO COMMERCIAL REFRIGERATION, INC | H16 | C | 11/04/2016 | FREEZER AND COOLER DO NOT REQUIRE REFRIGERATION LEAKAGE ALARMS. | NANCY | NANCY | | H16 | C | 5336280 |
COLORADO COMMERCIAL REFRIGERATION, INC | H= | P | 11/01/2016 | REFRIGERATION AMOUNTS FOR COOLER RECEIVED. CONTRACTOR MUST PROVIDE DIMENSIONS OF COOLER TO VERIFY IF LEAKAGE ALARM IS NEEDED. | NANCY | NANCY | | H= | P | 5332657 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 10/11/2016 | MUA LINE AND ALL DISCONNECTS AND TIE DOWNS AT COOK LINE ARE COMPLETE | JERRYF | JERRYF | | H= | C | 5315487 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 10/04/2016 | GREASE DUCT OK UP TO FAN FLANGE. OK TO WRAP. | NANCY | NANCY | | HD | P | 5309364 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 09/26/2016 | GREASE DUCT IN SOFFIT OK, OK TO WRAP. MAKE-UP AIR DUCT IN SOFFIT OK, OK TO WRAP. | NANCY | NANCY | | HD | P | 5302084 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 09/19/2016 | LIGHT TEST PERFORMED AT PEAK SHOP ON 9/19 3 - 4' DUCT AND 1 - 1' DUCT MARKED OK ON ALL SIDES WITH OK AND JF INITIALS | JERRYF | JERRYF | | HD | P | 5296269 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 09/13/2016 | GREASE WRAP IN OUTSIDE SHAFT OK. TWO LAYERS AND BANDING ARE COMPLETE... | LUKE | LUKE | | H= | P | 5292342 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 09/13/2016 | LIGHT TEST OK IN SHAFT OK TO FINISH GREASE WRAP. | LUKE | LUKE | | HD | P | 5291359 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 09/12/2016 | SEE HD NOTES.. | LUKE | LUKE | | H= | P | 5290232 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 09/12/2016 | NEED TO FIX HOLES IN GREASE DUCT LOCATED IN SHAFT, NEED ALL JOINTS AND PENETRATIONS OF GREASE DUCTS TO BE MADE WITH A CONTINUOUS LIQUID-TIGHT WELD. NEED TO GRIND DOWN ALL EXTRA SLAG ON WELDED JOINTS. NEED TO HAVE A WAY OF DARKENING TEST AREA. | LUKE | LUKE | | HD | P | 5290230 |
BARE TUB & STOVE | H= | C | 09/09/2016 | FIREPLACE FINAL OK. | NANCY | NANCY | | H= | C | 5288967 |
BARE TUB & STOVE | HV | C | 09/09/2016 | | NANCY | NANCY | | HV | C | 5288966 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 09/08/2016 | 10 LB TEST OK ON 2 INCH GAS LINE FOR MAKE-UP AIR UNIT. TEST ON GAS LINE FROM KITCHEN TO ROOF. STILL NEED TO SEE GAS LINE INSTALLED FROM SOFFIT AREA TO UNIT. INSTALLED AS PER PRINTS. | NANCY | NANCY | | HI | P | 5287845 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 09/07/2016 | EXTERIOR MAKE UP AIR DUCT COMPLETE AND WRAPPED UP TO SOFFIT ONLY. SEE PICTURE ON IMAGES | JON | JON | | HD | P | 5287282 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 09/07/2016 | GREASE DUCT INSPECTION AT PEAK HEATING LOCATION SEE PICTURE IN IMAGES DATED TODAY. 1- SECTION OF DUCT ANDS A 45 DEGREE FITTING, LIGHT TEST OK. | JON | JON | | HD | P | 5286678 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 09/02/2016 | LIGHT TEST OK PERFORMED AT PEAK SHOP ON 4' JOINT OF DUCT AND 1 OFFSET | JERRYF | JERRYF | | HD | P | 5284188 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 08/26/2016 | MAKE-UP AIR: ELBOW AND FOUR JOINTS OF DUCT UP OUTSIDE OF BUILDING OK, OK TO WRAP. NO GREASE WRAP INSPECTION TODAY. | NANCY | NANCY | | HD | P | 5278793 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 08/24/2016 | OK FOR WRAP ON VERTICAL EXTERIOR GREASE DUCT. PLANS SHOW A CLEAN OUT ON VERTICAL SECTION. NEED TO DISCUSS WITH CONTRACTOR FOR LOCATION AND ACCESS. QUESTION ROOF ACCESS FOR EQUIPMENT. ALSO NEED TO SEE LISTED GREASE CLEAN OUT AT 1ST FLOOR ENCLOSURE. | MARKB | MARKB | | HD | P | 5277128 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 08/19/2016 | LIGHT TEST PERFORMED AT SHOP ON 2 16 x16 WELDED DUCT - WELDS INSPECTED ARE CONNECTIONS TAGGED IN BLACK MARKER WITH JF DATED 8/19 | JERRYF | JERRYF | | HD | P | 5273298 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 08/18/2016 | GREASE LIGHT TEST GOOD FOR FOUR STRAIGHT PIECES AND ONE 45' FITTING. 16X16 | LUKE | LUKE | | HD | P | 5272169 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 08/11/2016 | MAKE-UP AIR DUCT BELOW RATED CEILING OK. COMPLETE SEALING OF JOINTS WHEN REGISTER OPENINGS ARE CUT IN. SUPPLY AIR TRUNK LINE IN SOFFIT OK,. | NANCY | NANCY | | HD | P | 5266766 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 08/05/2016 | KITCHEN MAKE-UP AIR CEILING RADIATION DAMPERS INSTALLATION OK. | NANCY | NANCY | | HD | P | 5262514 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 08/04/2016 | CANCELED BY CONTRACTOR. | NANCY | NANCY | | HD | P | 5261382 |
KONE, INC. | HE= | C | 08/01/2016 | CSFD INSPECTION FOR ELEVATOR FIRE SERVICE IS COMPLETE | ROBERTV | ROBERTV | | HE= | C | 5258224 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 07/29/2016 | GREASE WRAP IN SHAFT WALL ENCLOSURE OK. | NANCY | NANCY | | HD | P | 5257704 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 07/28/2016 | INSTALL GREASE WRAP BANDING PER MANUFACTURERS INSTRUCTIONS. | NANCY | NANCY | | HD | P | 5256431 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 07/27/2016 | GREASE DUCT IN SHAFT OUT THROUGH WALL OK, OK TO WRAP. NO ACCESS DOOR YET. | NANCY | NANCY | | HD | P | 5255198 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 07/27/2016 | 10 LB TEST OK ON 2 INCH GAS IN SHAFT WALL DOWN TO BALL VALVE AND OUT THROUGH WALL. | NANCY | NANCY | | HI | P | 5255197 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 07/26/2016 | PARTIAL GREASE WRAP ON PAIR OF PANTS OK. | NANCY | NANCY | | HD | P | 5253795 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 07/26/2016 | 10 LB TEST OK ON COOK LINE. INSTALLED AS PER PRINTS. | NANCY | NANCY | | HI | P | 5253794 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 07/25/2016 | SEE PICTURE IN IMAGES FOR LIGHT TEST AT TEE AND CONNECTIONS TO GREASE DUCT AT FLOOR PENETRATIONS. THE ENTIRE FITTING IN THE PICTURE HAS BEEN LIGHT TESTED AND OK FOR WRAP. | JON | JON | | HD | P | 5253663 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 07/22/2016 | GREASE DUCT INSPECTED IN PEAK HEATING SHOP MARKED WITH BLUE "X" OK, OK TO INSTALL. | NANCY | NANCY | | HD | P | 5251430 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 07/21/2016 | REPAIR HOLES IN GREASE DUCT. | NANCY | NANCY | | HD | P | 5250721 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 07/18/2016 | KITCHEN: HOOD INSTALLATION OK. SEAL TOP OF METAL INSTALLED BEHIND HOOD TO WALL. EXISTING CEILING RADIATION DAMPERS BEING RELOCATED MANUFACTURED BY WHOM? NEED TO VERIFY THAT FIRE DAMPER CAN BE INSTALLED IN DISH WASHER HOOD EXHAUST DUCT. | NANCY | NANCY | | HD | P | 5247127 |
KONE, INC. | HE= | P | 07/12/2016 | ELEVATOR OK PENDING FIRE FINAL PORTION OF ELEVATOR -- NO PUBLIC USE. | ROBERTV | ROBERTV | | HE= | P | 5243370 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 07/07/2016 | UPSTAIRS DINING AND BATHROOMS: LABEL DAMPER ACCESS DOORS AT UNITS. SECURE CONDENSATE DRAINS AT UNITS. PROVIDE TEST AND BALANCE REPORT. REST OK IN THESE AREAS. | NANCY | NANCY | | H= | P | 5239206 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 07/07/2016 | WRAP ON TWO GREASE DUCTS AT TOP OF HOODS OK. OK TO HANG HOODS. | NANCY | NANCY | | HD | P | 5239205 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 07/06/2016 | OK FOR WRAP | JON | JON | | HD | P | 5238317 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 07/05/2016 | REPAIR TWO HOLES IN GREASE DUCT. MAKE-UP AIR DUCTS THROUGH FLOOR AND ABOVE KITCHEN CEILING 7 FEET OUT FROM WALL OK. | NANCY | NANCY | | HD | P | 5237029 |
COLORADO COMMERCIAL REFRIGERATION, INC | HRP | C | 06/09/2016 | 375 LB TEST OK. FOR FINAL PERMANENTLY LABEL CONDENSERS, INSTALL CONDENSATE DRAINS AND PROVIDE INFORMATION REGARDING WHETHER REFRIGERATION LEAKAGE ALARMS ARE REQUIRED. | NANCY | NANCY | | HRP | C | 5218506 |
PEAK HEATING & AIR CONDITIONING, INC. | H= | P | 06/01/2016 | BEAUTY SALON AND TWO OFFICES NEXT TO BEAUTY SALON OK. INSTALL GRILLS ON SUPPLY AND RETURN IN SMALL OFFICE. | NANCY | NANCY | | H= | P | 5211921 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 04/20/2016 | 10 LB TEST OK ON GAS LINES TO FIREPLACES AND RELOCATED GAS LINE ABOVE KITCHEN HOOD. | NANCY | NANCY | | HI | P | 5180977 |
BARE TUB & STOVE | HV | P | 04/15/2016 | LOWER: FIREPLACE VENT AND CLEARANCES OK. NEED TO SEE GAS TO FIREPLACE BEFORE SHEET ROCK IS INSTALLED. UPPER: VENT ALL OK. INSTALL FRAMING AROUND AND GAS TO FIREPLACE BEFORE SHEET ROCK IS INSTALLED. | NANCY | NANCY | | HV | P | 5178234 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 04/01/2016 | FURNACES 1, 2, 3, 4 AND 5: ATTACH DAMPER ANGLES TO WOOD TRUSS WITH MINIMUM OF 1 1/2 INCH SCREWS. REMOVE SCREWS AT BREAK AWAY CONNECTION PER OUR CONVERSATION. DUCTS ABOVE CEILING IN MECHANICAL ROOMS OK. KITCHEN. PROVIDE MORE INFORMATION ABOUT HALTON HOOD, NEED CLARIFICATION OF HOW HOOD IS TO BE INSTALLED TO GET ZERO CLEARANCE RATING. ENGINEER WILL HAVE TO PROVIDE DETAIL OF HOW GREASE DUCTS ARE TO BE INSTALLED AND PROTECTED TO MEET REQUIREMENTS OF IMC 506. | NANCY | NANCY | | HD | P | 5167807 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 03/24/2016 | HOOD WALL OK, OK TO COVER PER MECHANICAL ONLY. PRIVATE DINING, PREP/SERVING 104 AND DEN 108: ABOVE CEILING OK. | NANCY | NANCY | | HD | P | 5161673 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 03/16/2016 | DINING 103: TRUNK LINES IN SOFFITS, LATERALS AND CEILING RADIATION DAMPERS OK. BEAUTY SALON: EXHAUST DUCT AND FAN ABOVE OFFICE OK. BUILDING INSPECTOR NEEDS TO SHEET ROCK FAN ENCLOSURE BEFORE COVERING. | NANCY | NANCY | | HD | P | 5156826 |
FRONTIER MECHANICAL SYSTEMS INC | HI | P | 03/11/2016 | NEED FIREPLACE CONTRACTOR ADDED TO PERMIT. 10 LB TEST OK ON ALL GAS LINES ABOVE CEILING ON MAIN LEVEL AND IN BASEMENT. STILL NEED TO SEE GAS TO MAKE-UP AIR UNIT, COOK LINE AND INSTALLED THROUGH FIREPLACE CABINETS WHEN FIREPLACES ARE IN PLACE.. INSTALLED AS PER PRINTS. | NANCY | NANCY | | HI | P | 5153136 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 02/24/2016 | NEED MORE INFORMATION REGARDING ATTACHING CEILING RADIATION DAMPER TO METAL BOX AND ATTACHING ANGLES TO BOX. WILL NEED TO INSTALL A CURTAIN TYPE DAMPER ABOVE THE FURNACES, NOT A CEILING RADIATION STYLE. QUESTION REGARDING THE FIRE DAMPER IN MAKE-UP AIR DUCT, WHAT HAPPENS IF DAMPER CLOSES? | NANCY | NANCY | | HD | P | 5141171 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 02/04/2016 | ABOVE CEILING ON 1ST FLOOR OK ALL HIGH LIGHTED IN PINK ON PAGE M2 | JERRYF | JERRYF | | HD | P | 5128231 |
PEAK HEATING & AIR CONDITIONING, INC. | HD | P | 01/26/2016 | ABOVE CEILING ON BASEMENT LEVEL OK TO WRAP 6" SUPPLY - NEED MECH. TO ADDRESS ALL RATINGS AT DUCT AND DAMPERS | JERRYF | JERRYF | | HD | P | 5123597 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 10/13/2016 | corrections made, note: building inspector aware of clear floor space at womens restroom 107. | TAYLOR | TAYLOR | | P= | C | 5318226 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 10/11/2016 | main floor kitchen ok, need hammer arrestors at all quick closing valves for hand sink and ice maker in basement kitchen. | TAYLOR | TAYLOR | | P= | P | 5316110 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | C | 07/08/2016 | lower level kitchen and sump pit in elevator shaft ok. | TAYLOR | TAYLOR | | PTO | C | 5240978 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 06/28/2016 | cafe area ok, need in line check valve at bag & box and grates at floor sinks in kitchen area, need 60 inches from wall to edge of sink at restroom 107. | TAYLOR | TAYLOR | | P= | P | 5233199 |
FRONTIER MECHANICAL SYSTEMS INC | P= | P | 05/31/2016 | salon o.k | JOEL | JOEL | | P= | P | 5211209 |
FRONTIER MECHANICAL SYSTEMS INC | PB | C | 03/24/2016 | per plan. | TAYLOR | TAYLOR | | PB | C | 5161983 |
FRONTIER MECHANICAL SYSTEMS INC | PB | P | 03/16/2016 | G.W. tie in and floor drain ok. | TAYLOR | TAYLOR | | PB | P | 5156463 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 03/16/2016 | food waste grinder needs to connect to G.W. at 1st floor kitchen/ prep area. | TAYLOR | TAYLOR | | PTO | P | 5156460 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 01/15/2016 | undersized cold water piping for both restrooms on 1st floor, salon area above ceiling and walls ok, demo and re-piping ok on 1st floor, need to verify drain tie in for restroom 107, note: aav above ceiling at salon area by final. | TAYLOR | TAYLOR | | PTO | P | 5117611 |