CHALLENGER HOMES, INC. | B= | C | 05/06/2016 | finished basement, no deck | DALE | DALE | | B= | C | 5194170 | CHALLENGER HOMES, INC. | BSP | T | 04/01/2016 | PAID (REC#1327894): 1st layer of sheetrock and mailing at main level ok | DALE | DALE | | BSP | T | 5168262 | CHALLENGER HOMES, INC. | BFR | R | 03/30/2016 | post not on pad by stairs | DALE | DALE | | BFR | R | 5166166 | CHALLENGER HOMES, INC. | BIN | P | 03/30/2016 | complete bfr | DALE | DALE | | BIN | P | 5166158 | CHALLENGER HOMES, INC. | BLA | C | 03/24/2016 | | DALE | DALE | | BLA | C | 5162092 | CHALLENGER HOMES, INC. | BIN | P | 03/24/2016 | complete bfr | DALE | DALE | | BIN | P | 5162091 | CHALLENGER HOMES, INC. | BFR | R | 03/24/2016 | lap truss bracing / drill down along post by stairs to varify pad | DALE | DALE | | BFR | R | 5162089 | CHALLENGER HOMES, INC. | BSP | P | 03/17/2016 | narrow braced wall ok | DALE | DALE | | BSP | P | 5157565 | CHALLENGER HOMES, INC. | BSP | P | 03/17/2016 | eng. letter | DALE | DALE | | BSP | P | 5156921 | CHALLENGER HOMES, INC. | BSP | P | 03/16/2016 | eng. for holdowns | DALE | DALE | | BSP | P | 5155974 | CHALLENGER HOMES, INC. | BSP | P | 03/08/2016 | 2nd layer of sheetrock and nailing at trusses and rim ok | DALE | DALE | | BSP | P | 5150628 | CHALLENGER HOMES, INC. | BSP | P | 03/04/2016 | 1st layer of sheetrock and nailing at trusses and rim ok | DALE | DALE | | BSP | P | 5148559 | CHALLENGER HOMES, INC. | BFD | C | 01/22/2016 | | DALE | DALE | | BFD | C | 5121659 | CHALLENGER HOMES, INC. | BFN | C | 01/22/2016 | ok per eng. | DALE | DALE | | BFN | C | 5120957 | CHALLENGER HOMES, INC. | BSP | P | 01/22/2016 | soils | DALE | DALE | | BSP | P | 5120955 | CHALLENGER HOMES, INC. | BFT | C | 01/22/2016 | ok per eng. | DALE | DALE | | BFT | C | 5120953 | CHALLENGER HOMES, INC. | BFT | P | 12/15/2015 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFT | P | 5099463 | CHALLENGER HOMES, INC. | BFN | P | 12/15/2015 | AUTHORIZED INSPECTION BY ENGINEER | NELIDA | NELIDA | NELIDA | BFN | P | 5099462 | J2D ELECTRIC, INC. | E= | C | 05/04/2016 | 25 amp a/c | RANDY | RANDY | | E= | C | 5191702 | J2D ELECTRIC, INC. | ER | C | 03/21/2016 | 1-#6al, 1-10, 1-14 irreversible ufer, no vac, finished basement, a/c pre wire | RANDY | RANDY | | ER | C | 5158975 | J2D ELECTRIC, INC. | ES | C | 03/21/2016 | Residential Underground: 150 amp 3/w new res | RANDY | RANDY | | ES | C | 5158963 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | H= | C | 05/03/2016 | Notes-- AC complete. High/low transfer grills to mech room. | JEFFL | JEFFL | | H= | C | 5190712 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HC | C | 03/18/2016 | RELEASE METER | JEFFL | JEFFL | | HC | C | 5158273 | CAPITAL VIEW GENERAL CONSTRUCTION, INC. | HRR | C | 03/18/2016 | OSA to return. AC rough coil and line set. Duct design. Finished basement. | JEFFL | JEFFL | | HRR | C | 5158272 | L & L GAS SHOP, LLC. | HI | C | 03/16/2016 | 10 LB. test ok. Notes-- 1'' main.. 1 furnace.. 1 wh.. 1 fp.. 1 bbq.. | JEFFL | JEFFL | | HI | C | 5156155 | TEAM PLUMBING, INC. | P= | C | 04/27/2016 | | TIM | TIM | | P= | C | 5185809 | TEAM PLUMBING, INC. | PTO | C | 03/07/2016 | finished basement, aav basement lav. | DICK | DICK | | PTO | C | 5149549 | TEAM PLUMBING, INC. | PB | C | 01/29/2016 | ok | DICK | DICK | | PB | C | 5126698 |
|
|