GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 08/19/2016 | Per meeting between, John, Jay, Ben S. a design for egress path will not be require but will comply with chapter 33 for pedestrian protection. Interior finish for areas "A" and "E" ; Colorado State Electrical final inspection on file from Curt Elliott. 303-869-3444. Colorado State Plumbing final inspection on file from.Dennis Medina, 303-869-3443. | DAN | DAN | | B= | C | 5274148 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 08/06/2016 | Areas "E" and "A"; CS Fire has partial permit. Items noted on 7/21/16 inspection completed with the exception of the egress path west side. Requesting approved egress design by PPRBD for west side to include protection of occupants when path is used. 1) need state documentation for Electrical and Plumbing completion of final inspections for RBD permit J99749. Need mechanical completed. | DAN | DAN | | BSP | P | 5263364 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | R | 08/05/2016 | should of been mechanical inspection. | DAN | DAN | | BSP | R | 5263345 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/28/2016 | Walked with Kellen reviewed west egress door from upper commons area. Stair way up is compliant. Ben is working on path from building to stairs. Labeling still in progress. Review exit signage on electrical plans. | DAN | DAN | | BSP | P | 5256331 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/27/2016 | Walked site walked site with Lupe, and Rob reviewing marking and identification of rated walls with protected openings. Noted several area missing or wrong labeling. Will recall. | DAN | DAN | | BSP | P | 5255588 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/26/2016 | | DAN | DAN | | BSP | P | 5254025 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/25/2016 | Talked with Ben regarding west egress path to public way. Work still in progress. Talked about location of Exit signage. | DAN | DAN | | BSP | P | 5253346 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/21/2016 | Walk through With Ben Schlick, looking at final inspection to come. Area "E" only. 1) West Egress door area "E" has be blocked. Will need solution. 2) 90 minute door missing astrical. at building step. 3) Glass missing in doors at auditorium. 4) missing marking and identification of wall which are required to have protected openings per section 703.6. 5) missing bathroom signage at kitchen area. 6) complete guard rails at kitchen exterior south area. 7) Smoke partition need sealing in boiler room. 8) complete open finals. | DAN | DAN | | BSP | P | 5251418 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/20/2016 | Protection of insulated pipes through 2hr shaft liner penetration not completed in accordance with approved UL listed detail. lower level clips missing and compressed mineral wool in door jambs. recall inspection for framing and fire caulk at link. | DAN | DAN | | BFR | P | 5250077 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/19/2016 | Insulated 6" steel pipe fire caulked with out approved UL listed detail. met with dry wall foreman Lupe. Looked at framing 2nd floor and first floor. need clips welded shaft liner to framing. Framing still in progress around doors. Shaft liner was extended to outside face of exterior wall. Lupe will recall to inspect welding and clips. | DAN | DAN | | BSP | P | 5248604 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 07/18/2016 | Engineer letter for Fire Proofing spray protection at stepped wall 10' roof protection from Kumar and Associates, Inc. Duane Craft #37553. | DAN | DAN | | BSP | P | 5247928 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 07/18/2016 | shaft liner need to extend to exterior of west wall. UL listed assembly still needed for insulated pipes through penetration of shaft liner 2hr wall. Large angular space around pipe. | DAN | DAN | | BFR | P | 5247815 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/23/2016 | OK to drop tile at ceiling mono-coat spray ceiling. Still need labeling of rated walls above ceiling and fire caulk communication sleeves at chase and conduit above dbl doors. | DAN | DAN | | BSP | P | 5229251 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 06/22/2016 | 2nd floor link interior bathroom wall framing, rooms A253, A254, A255, A256, and A257. wall types PG, hall; Pl common bath wall; PH single user bathrooms. Framer will call in exterior east and west wall at link tomorrow. Per conversation with Ben Kumar letter for spray still need stamp; first week in July will have Kumar letter for link foundation and steel erection. | DAN | DAN | | BFR | P | 5228732 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/09/2016 | Met Ben. reviewed door condition at band room for accessible requirements. Also above ceiling labeling at 2hr fire wall. Ben indicated that spray letter from Kumar only need stamp and the can provide to PPRBD. Talked about modular class rooms. RBD will be doing hold down, ramp and steps and marriage inspections. Kumar letter for link foundation and steel erection to be provided in couple of weeks. | DAN | DAN | | BSP | P | 5218686 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/08/2016 | Above grid room H100, band room. question regarding side clearance for door in 14' deep CMU offset. | DAN | DAN | | BSP | P | 5218119 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/03/2016 | Talked with Rob regarding Kumar letter of observation for mono-coat | DAN | DAN | | BSP | P | 5214525 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/02/2016 | smoke passage walls in science laboratories, rooms A223, A224, A225, A226, A237, A241, A242, and A250 OK. Splice for new wall types splice in on 5/26/16. | DAN | DAN | | BSP | P | 5213177 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 06/01/2016 | Reviewed science labs for smoke passage walls above grid. A223, A224, A225, A226, A237, A241, A242 and A250. Several areas of top wall sealing, and sleeves needing plugging. Walked with Ben, Rob, electrical foreman and drywall foreman, where correction needed. Reviewed requirements of section 703.7 Marking and identification of the 2015 IBC for labeling of required walls. Met Architect Holly Burns, she indicate a splice was submitted on 5/26 for the revised wall types for the science labs and the new 2hr firewall at the link. | DAN | DAN | | BSP | P | 5212725 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/20/2016 | Phone conversation with Ben Schlick regarding smoke partition continuity as noted on sheets 1A3.4 and 1A3.3 and how to achieve it. Ben will contact project architect. | DAN | DAN | | BSP | P | 5204167 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 05/18/2016 | Walked site with Rob. Mono-coat spray in progress on roof/ceiling for the primarily members and 10' distance back. 3rd party observation for protection to be provided. Top of elevator headwall joint completed. Listed detail to be provided. Walked A-2 area 2nd floor science lab area and verified upper wall types against plans. | DAN | DAN | | BSP | P | 5202975 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/11/2016 | Above ceiling Area A-2 #107 | DAN | DAN | | BFR | P | 5197212 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 04/29/2016 | Area A2; reviewed plumbing floor ceiling penetrations as per section IBC 713.4.2.2. Talked with Rob about need for permits for baseball field score board and retaining wall. | DAN | DAN | | BSP | P | 5188143 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/27/2016 | Area A-2 level 121 OK to drop tile. | DAN | DAN | | BFR | P | 5186154 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/24/2016 | Area A-2, level 107, offices and classroom wall framing OK pending other roughs. Wall types "PF" and "PE". Rooms A133-A163. Area A-2, upper level. offices and classroom wall framing OK pending other roughs. Wall types "PF" and "PE". Rooms A221 through A253 and A258 through A261. | DAN | DAN | | BFR | P | 5161529 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/21/2016 | Kitchen chase framing at Area E, E1 line and floor penetrations OK to cover. | DAN | DAN | | BFR | P | 5159628 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/17/2016 | Kitchen wall framing rooms E204, E202, E203, and E210 OK. Plumbing floor protection at pipes OK. Still need rooms E205, E206, and E207 completed. Area A-1 2nd floor line A1-1 through A1-4, plumbing floor protection is OK. | DAN | DAN | | BFR | P | 5157305 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BSP | P | 03/11/2016 | need splice completed for 1hr 10' ceiling set back under side of roof for stepped building for mechanical and electrical plan review with penetrations through ceiling. | DAN | DAN | | BSP | P | 5152853 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/10/2016 | Interior wall framing, Area-1, #121, A1-1 to A1-5 and line A1-D to A1A. Wall types PQ, PE, PG and PF. Offices, bathrooms and kitchenette. Counter top height 34" per plans sheet 1A4.0. bathroom closet flanges side wall offsets OK. | DAN | DAN | | BFR | P | 5152192 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/07/2016 | Area A-1, Lower level #107 wall framing for class rooms, offices and bathrooms OK pending other rough inspections. | DAN | DAN | | BFR | P | 5149635 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/25/2016 | soffit framing completed at E-A line competed. | DAN | DAN | | BFR | P | 5142160 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/24/2016 | lower level offices, wall types "PE" and "PF" rooms 120 through 128 OK. | DAN | DAN | | BFR | P | 5141599 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/11/2016 | Met with Jaime Robles, interior framing foreman, 719, 822-5676. Walls under stairs rooms E105 and E111. "PB" wall type. 2nd level hallway A217, wall type"PG", east wall from line A1-1 to A1-5 grid A1A.5. Still need #29 headwall detail. | DAN | DAN | | BFR | P | 5132592 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/09/2016 | Training with Nick and Scott; interior finish lower level "PQ" walls area A1-1 through A1-5. Plans do not show head wall detail #29. Framing OK. | DAN | DAN | | BFR | P | 5130636 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/05/2016 | lower level interior wall framing type "PQ" wall at grid A1-1 through A1-5. and line A1-B through A1- in progress of walls to deck. Rooms A107 and A110. Hallway A130 OK to dbl side top 3' of wall for ducts and acustical spray. | DAN | DAN | | BFR | P | 5129462 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 02/04/2016 | Wall framing for rooms #108 #109, and boiler room #110 OK. Mechanical need inspection for dampers in wall. Need revised head wall detail to use slotted track and the applicable head wall detail. | DAN | DAN | | BFR | P | 5128459 |
US ENGINEERING COMPANY | H= | C | 08/10/2016 | HEAT FINAL COMPLETE. | LUKE | LUKE | | H= | C | 5265696 |
US ENGINEERING COMPANY | H= | P | 08/08/2016 | CLEARANCE TO COMBUSTIBLES OK. STILL NEED TO COMPLETE INTERLOCK FOR TYPE ONE HOODS. | LUKE | LUKE | | H= | P | 5263576 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 08/05/2016 | THIS CONTRACTOR SCOPE WORK IS COMPLETE.. | LUKE | LUKE | | H= | C | 5263357 |
US ENGINEERING COMPANY | H= | P | 08/03/2016 | ADDED NOTES 8-5-16 TEST AND BALANCE REPORT RECIVED SENT TO SCANNING. NOTE:STILL NEED TO FIX ALL METAL BEHIND AND ABOVE KITCHEN HOOD. CAN'T HAVE COMBUSTIBLES WITHIN 18'' OF HOOD. NEED TO HAVE A CLEAN SMOOTH WASHABLE SURFACE. NEED TO CHECK INTERLOCK. NOTE: REST OK PENDING TEST AND BALANCE REPORT. | LUKE | LUKE | | H= | P | 5260743 |
LEADING EDGE MECHANICAL, INC | H= | C | 08/02/2016 | WALK IN COOLER AND FREEZER COMPLETE.. | LUKE | LUKE | | H= | C | 5260122 |
US ENGINEERING COMPANY | HD | P | 07/27/2016 | ABOVE CEILING OK. FLEX AND DIFFUSERS ARE INSTALLED.. | LUKE | LUKE | | HD | P | 5255533 |
THYSSENKRUPP ELEVATOR CORPORATION | HE= | C | 07/21/2016 | ELEVATOR COMPLETED ON PERMIT J77712 | ERIC | ERIC | | HE= | C | 5250491 |
US ENGINEERING COMPANY | H= | P | 07/20/2016 | PENDING TEST AND BALANCE REPORT BUILDING A- AND -E | LUKE | LUKE | | H= | P | 5250131 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 07/20/2016 | AHU-1 THRU 8 OK. | LUKE | LUKE | | H= | P | 5250129 |
LEADING EDGE MECHANICAL, INC | H= | P | 07/19/2016 | WALK IN COOLER OK... STILL NEED TO SEE FREEZER AND LABELS ON UNITS.. | LUKE | LUKE | | H= | P | 5248614 |
US ENGINEERING COMPANY | HD | P | 07/18/2016 | FIRE DAMPER FRAMING OK ON LINK WALL AND A-2. WALL.. NOTE: WILL NEED TO SEE FIRE DAMPER ANGLES AND AIR GAP AT NEXT INSPECTION.. | LUKE | LUKE | | HD | P | 5247300 |
LEADING EDGE MECHANICAL, INC | HRP | C | 07/18/2016 | REFRIGERATION LINES FOR WALK IN FREEZER AND COOLER GOOD. ALARMS INSTALLED. | LUKE | LUKE | | HRP | C | 5247289 |
US ENGINEERING COMPANY | H16 | C | 07/18/2016 | ADDED LETTER FOR FIRE SMOKE DAMPER FROM ENGINEER. SCANNED INTO IMAGES. | JON | JON | | H16 | C | 5247195 |
US ENGINEERING COMPANY | HD | P | 07/14/2016 | FIRE DAMPER FRAMING OK ON LINK SIDE 2X6 WALL. FIRE DAMPERS ARE INSTALLED AT THIS TIME WITH BREAK AWAYS.. NOTE: STILL NEED TO SEE BACK SIDE WITH ENGINEERING STAMPED LETTER AND DETAIL DRAWING..
| LUKE | LUKE | | HD | P | 5245209 |
US ENGINEERING COMPANY | HD | P | 07/07/2016 | THIS INSPECTION WAS FOR ON SITE DISCUSSION ON FIRE DAMPERS IN 2 HOUR WALL. ALL PARTIES WERE INCLUDED IN AN EMAIL ON 7-6-16 FOR WHAT RBD WILL NEED FOR DAMPER SUPPORT AT THIS WALL. PLEASE REFERENCE THAT EMAIL FOR MORE INFORMATION | JON | JON | | HD | P | 5239908 |
US ENGINEERING COMPANY | H= | P | 06/30/2016 | CRAC UNIT DRAINS ARE COMPLETE | JERRYF | JERRYF | | H= | P | 5235099 |
OLSON PLUMBING & HEATING COMPANY | H= | P | 06/28/2016 | THE FOLLOWING AREA'S ARE OK --- AHU 3 - AHU 1 AND 2 - AHU 4 AND 5 - BOILER ROOM - CHILLER RELIEF VENT - ALL AREA E ROOF - HAD CONSULT WITH JOSH ON NEEDING TO GET COOLERS ATTACHED TO PERMIT AND INSPECTIONS CALLED | JERRYF | JERRYF | | H= | P | 5233067 |
US ENGINEERING COMPANY | H= | P | 06/28/2016 | THE FOLLOWING AREAS ARE COMPLETE - ALL ROOF AREA E - A1 AND 2 AND KITCHEN - AHU3 / AHU 1 AND 2 / AHU 4 AND 5 / BOILER ROOM AND ALL CRAC UNITS - HAD CONSULT WITH STEVE AT US ABOUT F/D FRAMING AT AREA A AND LINK - HAD CONSULT WITH STEVE FROM US ON NEEDING TO COOLERS ATTACHED TO PERMIT AND INSPECTIONS CALLED | JERRYF | JERRYF | | H= | P | 5232993 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 06/21/2016 | PRESSURE TEST AND PIPING FOR SNOW MELT AT MAIN ENTRY OK | JERRYF | JERRYF | | HWP | P | 5227319 |
US ENGINEERING COMPANY | H= | P | 06/07/2016 | ABOVE CEILING COMPLETE IN BAND ROOM 2ND FLOOR | JON | JON | | H= | P | 5217072 |
US ENGINEERING COMPANY | H= | P | 05/31/2016 | DISHWASHER HOOD AND EXHAUST DUCT IS COMPLETE. ABOVE CEILING AROUND 2ND FLOOR COMMON AND RELIEF FAN #3 IS COMPLETE. DINING ROOM EXPOSED SPIRAL COMPLETE. | JON | JON | | H= | P | 5211430 |
US ENGINEERING COMPANY | H= | P | 05/25/2016 | SCIENCE LABS 2ND FLOOR | JON | JON | | H= | P | 5208618 |
US ENGINEERING COMPANY | HD | P | 05/25/2016 | DRYER DUCT IN LAUNDRY ROOM OFF KITCHEN OK | JON | JON | | HD | P | 5208617 |
US ENGINEERING COMPANY | H= | P | 05/19/2016 | 1ST FLOOR AREA A-1 AND A-2 FIRST FLOOR ABOVE CEILING COMPLETE. | JON | JON | | H= | P | 5204046 |
US ENGINEERING COMPANY | H= | P | 05/17/2016 | 2ND FLOOR AREA A-2 121 ABOVE CEILING COMPLETE EXCLUDING THE CORRIDORS. DO NOT TILE SCIENCE LABS UNTIL VERIFICATION OF SMOKE DAMPERS ARE WIRED AND IN OPERATION. CONTACTED BUILDING INSPECTOR DUE TO INCOMPLETE CONSTRUCTION ON WALLS ABOVE CEILING IN SCIENCE LABS 2ND FLOOR. | JON | JON | | H= | P | 5202836 |
US ENGINEERING COMPANY | HD | P | 05/12/2016 | SERVING AREA SECOND FLOOR ABOVE CEILING COMPLETE, STILL NEED THE ENTIRE REST OF THE KITCHEN INCLUDING COOLERS COMPLETED. ROOMS 156, 157, 159, 160,161,162 ABOVE CEILING COMPLETE 1ST FLOOR, STILL NEED HALLWAY 158 | JON | JON | | HD | P | 5198084 |
US ENGINEERING COMPANY | H= | P | 05/05/2016 | Above ceiling complete in A-2 1st floor both corridors and all offices. Performed consultation for grease duct wrap and access doors with insulation company foreman. Discussed banding and access door fire rated pillows which do not comply with manufacturer. Need to have all corrected by next hood inspection. Still waiting on shop made grease access doors approval of gasket for grease and temperature rating. on Still need diffusers and flex in rooms and hallway by AH-8 mechanical room 107. All mechanical rooms are to be called for one inspection when ready. | JON | JON | | H= | P | 5192803 |
US ENGINEERING COMPANY | HD | P | 04/26/2016 | NEED INSPECTIONS FOR WALK IN COOLERS AND PERMITS. NEED INSTRUCTIONS FOR GREASE WRAP FOR BANDING, ACCESS DOORS AND PILLOWS. MATERIALS USED IN THE CONSTRUCTION OF ACCESS DOORS ARE TO MEET APPROVAL FOR GREASE AND 1500 DEGREE TEMPERATURE RATING. EF-30 IN KITCHEN AREA ROUGH DUCT OK. | JON | JON | | HD | P | 5185064 |
US ENGINEERING COMPANY | H= | P | 04/19/2016 | ABOVE CEILING AND ALL SA/RA AND EXHAUST GRILLES COMPLETE IN THE FOLLOWING AREA A1 1ST AND 2ND FLOOR | JERRYF | JERRYF | | H= | P | 5179813 |
US ENGINEERING COMPANY | H= | P | 04/12/2016 | ABOVE CEILING COMPLETE AT AREA A1-107 ONLY, EXCLUDING MAIN CORRIDOR...... NEED TO MAKE SURE WALK IN COOLERS HAVE PERMITS AND INSPECTIONS, ALSO FRP COMBUSTIBLE MATERIAL NEEDS REMOVED FROM BEHIND HOODS AND PROPER SMOOTH NON-COMBUSTIBLE, NON-ABSORBENT MATERIAL IS INSTALLED BEHIND KITCHEN TYPE ONE HOODS. | JON | JON | | H= | P | 5175646 |
US ENGINEERING COMPANY | H16 | C | 04/07/2016 | HAD CONSULT WITH STEVE AT US ABOUT F/SD'S ABOVE DOOR AT NEW BUILDING INFORMED HIM THAT ENGINEER NEEDS TO ADDRESS HOW LARGE DAMPERS WILL BE SUPPORTED ABOVE DOORS | JERRYF | JERRYF | | H16 | C | 5171820 |
US ENGINEERING COMPANY | HD | P | 04/06/2016 | NEED CONSULT WITH SENIOR INSPECTOR ON WALLS AT AHU#8 POSSIBLE FOR FIRE RATED CONSTRUCTION - REST OF AHU#8 INSTALL OK 2 SMOKE DAMPER FRAMING AT 2ND FLOOR OK | JERRYF | JERRYF | | HD | P | 5170820 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 03/31/2016 | PRESSURE TEST OK ON ALL PIPING TO VAV'S AT AREA 121 A2 | JERRYF | JERRYF | | HWP | P | 5166976 |
US ENGINEERING COMPANY | HD | P | 03/31/2016 | HAD CONSULT WITH CONTRACTOR ON SMOKE DAMPER FRAMING - AT FUTURE INSPECTION VERIFY GASKETS AT GREASE DOOR ACCESS X 2 - VERIFY HOLE HOLE IN TOP OF HOOD AT #3 BRACKET AT BACK OF HOOD FROM RIGHT SIDE HAS BEEN REPAIRED | JERRYF | JERRYF | | HD | P | 5166944 |
US ENGINEERING COMPANY | HD | P | 03/30/2016 | ALL GREASE DUCT OK FOR WRAP - ABOVE CEILING OK AT AREAS A2 2ND FLOOR AND E2 2ND FLOOR COMMON AREA - NEED ALL SMOKE DAMPER FRAMING INSPECTED AND HOOD SPECS. TO VERIFY CLEARANCES | JERRYF | JERRYF | | HD | P | 5165861 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 03/21/2016 | ALL HWP PRESSURE TEST OK IN THE FOLLOWING AREA A2107 AND WATER HEATER VENT OK AT 2ND FLOOR KITCHEN AREA STILL NEED ALL FINAL VENT CONNECTIONS AT WATER HEATER | JERRYF | JERRYF | | HWP | P | 5159065 |
US ENGINEERING COMPANY | HV | P | 03/21/2016 | HAD CONSULT WITH STEVE AT US ABOUT INSTALLATION OF BANDS AT BOILER FLUE AT 2ND FLOOR KITCHEN AREA - HE WILL RECALL INSPECTION WHEN HE HAS ALL PAPER WORK SHOWING BAND INSTALLATION | JERRYF | JERRYF | | HV | P | 5159014 |
OLSON PLUMBING & HEATING COMPANY | HWP+ | P | 03/21/2016 | PRESSURE TEST AND HWP FINAL CONNECTIONS COMPLETE AT AREA A2107 | JERRYF | JERRYF | | HWP+ | P | 5159004 |
US ENGINEERING COMPANY | HD | P | 03/16/2016 | AREA A-2 FIRST FLOOR OK FOR WRAP. | JON | JON | | HD | P | 5156693 |
OLSON PLUMBING & HEATING COMPANY | HV | P | 03/16/2016 | Need to make sure there is not a clearance issue pipe insulation covering on beneath vent out of vent chase upper level. Still need water heater vent inspection called when ready. | JON | JON | | HV | P | 5156690 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 03/11/2016 | PRESSURE TEST ON ON BUILDING MAINS AT AREA A AND E LESS MECHANICAL ROOMS - A1-121 VAV PIPING | JERRYF | JERRYF | | HWP | P | 5152924 |
US ENGINEERING COMPANY | H16 | C | 03/11/2016 | HAD CONSULT WITH STEVE AT US ENGINEERING ABOUT RATED CEILING AT WEST END COMMONS AREA FOR 10' AREA PROTECTION AT HIGH WALL - MECH CONTRACTOR NEEDS TO NOTIFY MECH ENGINEER TO SEND CORE AND SHELL PLAN REVISIONS BACK THROUGH FOR MECH. AND ELECTRIC REVIEW | JERRYF | JERRYF | | H16 | C | 5152842 |
US ENGINEERING COMPANY | HD | P | 03/10/2016 | GREASE DUCT OK FOR WRAP AT FUTURE INSPECTION NEED INSPECTION ON 2 ELBOWS AT HOOD AND FINAL CONNECTIONS AT SAME - NEED CONSULT WITH PLAN REVIEW ON POSSIBLE F/D AT 1 HR. CEILING IN WEST COMMONS AREA - 2 RISERS AT EAST END E1 2ND FLOOR OK | JERRYF | JERRYF | | HD | P | 5152026 |
US ENGINEERING COMPANY | HD | P | 03/08/2016 | ABOVE CEILING OK IN THE FOLLOWING AREAS - A1 1ST FLOOR MECH / A1 1ST FLOOR CORRIDOR / ALL RISERS AT E1 2ND FLOOR | JERRYF | JERRYF | | HD | P | 5149797 |
US ENGINEERING COMPANY | HD | P | 03/07/2016 | ABOVE CEILING OK FOR WRAP ON THE FOLLOWING AREAS - A1 UPPER AREA / 3 RISERS AT E1 COMMONS AREA / 3 COMBUSTION AIRS AT KITCHEN AREA - STILL NEED ALL ROOF DROP CONNECTIONS | JERRYF | JERRYF | | HD | P | 5148973 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 03/03/2016 | F1-107...E1-121...E2-121 TEST AND VISUAL OK FOR INSULATION | JON | JON | | HWP | P | 5147565 |
US ENGINEERING COMPANY | HD | P | 03/01/2016 | SA / RA / EXHAUST ABOVE CEILING OK ON THE FOLLOWING AREAS - LEVEL 107 CORRIDOR / A1 - 30 MAIN ENTRY - LEVEL 121 KITCHEN AREA - STILL NEED GREASE DUCT INSPECTION AND FINAL CONNECTIONS AT EF 30 | JERRYF | JERRYF | | HD | P | 5145306 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 03/01/2016 | HWP INSPECTION OK ON THE FOLLOWING AREAS - A1-107 - A2 - 107 - E3 = 107 OK FOR INSULATION - STILL NEED PRESSURE TEST ON ALL | JERRYF | JERRYF | | HWP | P | 5145301 |
US ENGINEERING COMPANY | HD | P | 02/19/2016 | 4 SMOKE DAMPER FRAMING AT AREA E OK THESE ARE SMOKE DAMPERS NOT F/SD DAMPERS | JERRYF | JERRYF | | HD | P | 5138157 |
OLSON PLUMBING & HEATING COMPANY | HWP | P | 02/19/2016 | PRESSURE TEST OK ON ALL PIPING IN AREA A1 ADMIN FROM GRID LINES A1A - THROUGH A1E AND A1.1 THROUGH A1.47 ON LEVEL 107 AREA A - ALL CONNECTIONS COMPLETE AT ALL BOXES | JERRYF | JERRYF | | HWP | P | 5138156 |
US ENGINEERING COMPANY | HD | P | 02/17/2016 | ABOVE CEILING OK FROM GRID LINES A1-1 THROUGH A1-5.3 AND A1-B THROUGH A1-1 ON LEVEL 107 DUCT AREA - STILL NEED ALL F/SD FRAMING EXPOSED AT AREA E X 4 | JERRYF | JERRYF | | HD | P | 5135768 |
US ENGINEERING COMPANY | HD | P | 02/08/2016 | ALL SA/RA AND EXHAUST DUCT IN CRAWLSPACE OK - HIGH LIGHTED IN PINK ON G.C. PLANS PAGE 1M1.2 - AT FUTURE INSPECTION NEED TO VERIFY ALL FS/D FRAMING ON 4 CRAWLSPACE DAMPERS | JERRYF | JERRYF | | HD | P | 5129846 |
US ENGINEERING COMPANY | H16 | C | 02/03/2016 | Need proper permits and inspections for all mechanical work installed. Any work concealed to be exposed prior to any on site inspections. | JON | JON | | H16 | C | 5127115 |