ARNOLD & BEAUDIN INC | B= | C | 07/13/2016 | All other required Final inspections are complete. (This is a computer generated result) | DANE | DANE | | B= | C | 5243575 |
ARNOLD & BEAUDIN INC | B= | P | 07/01/2016 | items from previous inspection corrected / phase 2 also complete pending other finals. Additional Inspections Required (computer generated): HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5235924 |
ARNOLD & BEAUDIN INC | BFR | C | 07/01/2016 | | DANE | DANE | | BFR | C | 5235923 |
ARNOLD & BEAUDIN INC | BFR | P | 06/14/2016 | room 125 (storage) framing OK pending other roughs / this concludes the framing of this project | DANE | DANE | | BFR | P | 5222040 |
ARNOLD & BEAUDIN INC | BFR | P | 06/07/2016 | framing OK at rooms 119, 120, and 121 pending other roughs / discussed accessible elements with contractor / training with BW | DANE | DANE | | BFR | P | 5216272 |
ARNOLD & BEAUDIN INC | B= | P | 05/31/2016 | need knee protection in exam room 7 at accessible sink / rest of north end of job complete / all backup lights working in all new north end exam rooms / rooms 119, 120, 121 and 125 are the remaining phase of the job -- Schedule a new Building Final when above items are complete. Additional Inspections Required (computer generated): External Agency Inspection F= by FIREDEPT is not Completed yet (Contact: 385-5982, x2), External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982), E LIGHT ELECTRIC SERVICES, INC Electrical Final Inspection is not Completed yet, HVAC SOLUTIONS, INC. Mechanical Final Inspection is not Completed yet, UNIQUE RADIANT HTG. & PLBG. Plumbing Final Inspection is not Completed yet. | DANE | DANE | | B= | P | 5211526 |
ARNOLD & BEAUDIN INC | BFR | P | 03/25/2016 | new framing at corridor bathrooms OK pending other rough inspections / measured for accessibility at rest rooms | DANE | DANE | | BFR | P | 5163199 |
ARNOLD & BEAUDIN INC | BFR | P | 03/04/2016 | Phase 1 framing OK (north end to existing finished area) pending other roughs / reviewed accessibility with site rep | DANE | DANE | | BFR | P | 5148585 |
E LIGHT ELECTRIC SERVICES, INC | E= | C | 06/21/2016 | | RANDY | RANDY | | E= | C | 5226920 |
E LIGHT ELECTRIC SERVICES, INC | ER | P | 06/16/2016 | all walls complete all ceilings except hall. | RANDY | RANDY | | ER | P | 5224165 |
E LIGHT ELECTRIC SERVICES, INC | ER | P | 06/06/2016 | walls and soffit in rooms 119, 120 and 121 ok | CRAIG | CRAIG | | ER | P | 5215088 |
E LIGHT ELECTRIC SERVICES, INC | ER | P | 05/19/2016 | outer wall ok | RANDY | RANDY | | ER | P | 5203487 |
E LIGHT ELECTRIC SERVICES, INC | E= | P | 05/10/2016 | baths, corridors, from procedure rm south not ready for power, rooms for lighting that are complete are marked on prints. | RANDY | RANDY | | E= | P | 5195809 |
E LIGHT ELECTRIC SERVICES, INC | ES | C | 05/10/2016 | Commercial Service: panels LC1 200 amp 480v--- R1D 150 amp 120v 3 phase 3/w ok. | RANDY | RANDY | | ES | C | 5195799 |
E LIGHT ELECTRIC SERVICES, INC | ER | P | 04/26/2016 | above ceiling north end only, 2 counter rough ins. | RANDY | RANDY | | ER | P | 5184703 |
E LIGHT ELECTRIC SERVICES, INC | ER | P | 04/13/2016 | 1 switch 1 light in storage closet. | RANDY | RANDY | | ER | P | 5176164 |
E LIGHT ELECTRIC SERVICES, INC | ER | P | 03/31/2016 | all hard lid cans ok | RANDY | RANDY | | ER | P | 5167199 |
E LIGHT ELECTRIC SERVICES, INC | ER | P | 03/09/2016 | walls ok see prints | RANDY | RANDY | | ER | P | 5150892 |
E LIGHT ELECTRIC SERVICES, INC | ER | P | 03/03/2016 | walls only see prints. | RANDY | RANDY | | ER | P | 5147039 |
HVAC SOLUTIONS, INC. | H= | C | 07/13/2016 | MECHANICAL FINAL OK. TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 5243574 |
HVAC SOLUTIONS, INC. | H= | P | 06/23/2016 | MECHANICAL FINAL OK PENDING RECEIPT OF TEST AND BALANCE REPORT. | NANCY | NANCY | | H= | P | 5229970 |
HVAC SOLUTIONS, INC. | HD | P | 06/07/2016 | ABOVE CEILING IN AREA THE FOLLOWING AREA - BREAKROOM AND DOCTORS OFFICE 121 | JERRYF | JERRYF | | HD | P | 5216987 |
HVAC SOLUTIONS, INC. | H= | P | 05/24/2016 | MECHANICAL FINAL OK FROM NORTH END TO PROCEDURE 119, BREAK ROOM AND PATIO ENCLOSURE. PROVIDE TEST AND BALANCE REPORT FOR THIS AREA. | NANCY | NANCY | | H= | P | 5207378 |
HVAC SOLUTIONS, INC. | HD | P | 04/27/2016 | ABOVE CEILING OK. NOTE: NEED TO SEE BATHROOM DOORS UNDER CUT BY FINAL. | LUKE | LUKE | | HD | P | 5186378 |
HVAC SOLUTIONS, INC. | HD | P | 03/17/2016 | PHASE ONE ROUGH OK. NEED TO ISOLATE ALL COMBUSTIBLE MATERIALS ABOVE PLENUM CEILING. OK TO COVER ROUGH DUCT, NOTE: VAVS AND FAN BOXES ARE INSTALLED, NO FLEX OR DIFFUSERS ARE INSTALLED AT THIS TIME.. TEST AND BALANCE REPORT DO FOR FINAL.. | LUKE | LUKE | | HD | P | 5157813 |
UNIQUE RADIANT HTG. & PLBG. | P= | C | 06/24/2016 | SINKS INSTALLED X3 ALL TO PLAN | GABE | GABE | | P= | C | 5231128 |
UNIQUE RADIANT HTG. & PLBG. | PTO | C | 06/07/2016 | CORRECTIONS MADE , TEST VERIFIED | GABE | GABE | | PTO | C | 5216089 |
UNIQUE RADIANT HTG. & PLBG. | P= | P | 06/06/2016 | NOTE : DWV AND WATER IN AND TO PLAN , LOST TEST AT DWV | GABE | GABE | | P= | P | 5215791 |
UNIQUE RADIANT HTG. & PLBG. | P= | P | 05/13/2016 | ALL SINKS AND BATH GROUPS TO PLAN , HAMMER ARRESTER IN WOMANS , EXAM ROOM 1 AND PROCEDURE 119 NOT READY | GABE | GABE | | P= | P | 5199480 |
UNIQUE RADIANT HTG. & PLBG. | PTO | C | 03/21/2016 | DWV AND WATER ON TEST , ALL TO PLAN | GABE | GABE | | PTO | C | 5159480 |
UNIQUE RADIANT HTG. & PLBG. | PTO | P | 03/14/2016 | NEED TO TEST NEW CARRIER FOR ADA BATH ROOM , NEED TO TEST PIPING H2O AND DWV FOR DRINKING FOUNTAIN , DWV AND H2O IN EXAM ROOM WALLS OK AND ON TEST | GABE | GABE | | PTO | P | 5154740 |