COLORADO COMMERCIAL CONSTRUCTION, INC. | B= | C | 12/15/2016 | engineering on file for use of detail C at foundation column / all items corrected | DANE | DANE | | B= | C | 5368734 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | B= | P | 12/14/2016 | engineering received for engineer observations for footings and foundations and open hole received / still need letter for column at C3 grid lines formed as a C detail when plans call for D detail -- Schedule a new Building Final when above items are complete. | DANE | DANE | | B= | P | 5367525 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BSP | P | 12/13/2016 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: revised comcheck | SHELLEY | SHELLEY | | BSP | P | 5367139 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BSP | P | 12/02/2016 | had phone conversation with Barry Splaeth about what was needed to complete BFI, BFT and BFN / still need engineer observations for west half footings, and for change of column at north wall on west side and need open hole letter and need to change the Com Check to reflect what was installed at the foundation insulation / also discussed using the electronic submittal for all other outstanding letters for the footing and foundation | DANE | DANE | | BSP | P | 5358541 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BSP | T | 10/12/2016 | PAID (REC#1371425) PLAN SPLICE FEE: $50 by: SHELBY for Electrical: Add two RTU | SHELBY | SHELBY | | BSP | T | 5316926 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BSP | T | 10/03/2016 | PAID (REC#1367662) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: Revised to add additional RTU's to roof | JUSTINC | JUSTINC | | BSP | T | 5308713 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BFN | R | 09/13/2016 | engineer reports uploaded are not stamped and state the trash enclosure is what was inspected / can not accept reports without stamps | DANE | DANE | | BFN | R | 5291244 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BSP | R | 09/07/2016 | RMG observation letter for footing and foundation is incomplete/Dane let contractor Barry know in an email/no further inspections until footing and foundation are completed per Bert W | BERTW | BERTW | | BSP | R | 5286457 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | B= | R | 09/06/2016 | need splash blocks on north down spouts / need all footing and foundation observations / need letter for changed column in foundation at grid line C3 / need to revise ComCheck for foundation insulation that is installed R10 24" deep and is called out as R11 36" deep and splice into plans. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | DANE | DANE | | B= | R | 5286172 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BIN | P | 09/06/2016 | wall insulation complete / still need to revise Comcheck for foundation insulation | DANE | DANE | | BIN | P | 5286155 |
EL PASO ELECTRIC, LLC. | BSP | T | 08/01/2016 | PAID (REC#1345908) PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Changed service lateral from 500 cu to 400 alum. | BERTHA | BERTHA | | BSP | T | 5258411 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BLA | C | 07/06/2016 | stucco lath complete | DANE | DANE | | BLA | C | 5238946 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BLA | P | 06/28/2016 | lath complete except both towers on roof and west end of south side from east side of west store front to west corner | DANE | DANE | | BLA | P | 5233311 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BLA | P | 06/08/2016 | west wall OK from north corner to column south of drive through window | DANE | DANE | | BLA | P | 5218007 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BLA | P | 06/07/2016 | north wall only stucco lath OK | DANE | DANE | | BLA | P | 5217074 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BFR | P | 06/07/2016 | still need engineer observation reports for footings and foundation / still need to revise comcheck for the BFI / still need engineer letter for foundation column on grid line C3 that was not per plan / wall and roof framing OK pending other rough inspections / all box headers and gang studs have been pre-insulated | DANE | DANE | | BFR | P | 5217073 |
FRONTIER MECHANICAL SYSTEMS INC | BSP | T | 05/27/2016 | PAID (REC#1332044) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: revised gas | JUSTINC | JUSTINC | | BSP | T | 5209844 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BSP | T | 05/23/2016 | PAID (REC#1332045) PLAN SPLICE FEE: $50 by: DANM for Construction: Clarifying structural details and gas meter locations added to plan | DANM | DANM | | BSP | T | 5205548 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BFI | R | 03/16/2016 | Com check calls for R11 - 3' vertical - only R10 - 2' vertical installed / need all engineer inspections for footing and foundation and open hole | DANE | DANE | | BFI | R | 5156387 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BSP | P | 03/09/2016 | spoke with Tom Sullivan on the phone about needing an engineer letter correcting the call out of the column at grid lines C-3 / also sent an email to Barry Spaeth stating the need for the same thing | DANE | DANE | | BSP | P | 5150835 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BSP | P | 03/09/2016 | open hole received / 2400 / no drain required | DANE | DANE | | BSP | P | 5150781 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BFN | R | 03/07/2016 | second column from west end on north wall is called as detail D and is formed as detail C / need letter for footing poured without inspection / need cold joist detail for footing and foundation / only west end of footing poured to middle foundation (including middle footing) and only west end foundation formed to center foundation | DANE | DANE | | BFN | R | 5149011 |
COLORADO COMMERCIAL CONSTRUCTION, INC. | BSP | P | 02/17/2016 | PLAN SPLICE: (No Fee) by: SHELLEY for Construction: revised foundation detail D | SHELLEY | SHELLEY | | BSP | P | 5135899 |
EL PASO ELECTRIC, LLC. | E= | C | 12/06/2016 | | BRET | BRET | | E= | C | 5361558 |
EL PASO ELECTRIC, LLC. | ER | C | 12/06/2016 | 2-40 amp units 40 amp breakers. | BRET | BRET | | ER | C | 5361541 |
EL PASO ELECTRIC, LLC. | E= | P | 08/09/2016 | 2 rtu's added to project; need to inspect | BRET | BRET | | E= | P | 5264553 |
EL PASO ELECTRIC, LLC. | E= | P | 08/08/2016 | need service disconnect labeling service disconnect 1 of 5 ect. | BRET | BRET | | E= | P | 5264145 |
EL PASO ELECTRIC, LLC. | ES | C | 08/08/2016 | Commercial Service: no action needed | BRET | BRET | | ES | C | 5264144 |
BJ COMPANY, LLC | E= | C | 08/05/2016 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 5263210 |
BJ COMPANY, LLC | ER | C | 08/05/2016 | FIRE ALARM INSPECTION: | BRET | BRET | | ER | C | 5263209 |
BJ COMPANY, LLC | E= | C | 08/05/2016 | FIRE ALARM INSPECTION: | BRET | BRET | | E= | C | 5263208 |
EL PASO ELECTRIC, LLC. | EP | P | 08/05/2016 | sub panels ok add gfci protected receptacle within 50' of service equipment by time of final | BRET | BRET | | EP | P | 5263200 |
EL PASO ELECTRIC, LLC. | ES | P | 08/03/2016 | Commercial Service: 800 amp service ok to energize. need meter set for suite 100 - 200 amp, suite 110 -200 amp , suite 120 - 400 amp and 100 amp house note made to line side of disconnects only no meter for future suite 130 | BRET | BRET | | ES | P | 5261302 |
EL PASO ELECTRIC, LLC. | E= | P | 08/02/2016 | 5 -40 amp rtu's fused at disconnect roof ok | BRET | BRET | | E= | P | 5259866 |
EL PASO ELECTRIC, LLC. | ES | P | 08/02/2016 | Commercial Service: 800 amp service needs meter set for 400 amp unit c, 2-200 amp units a and b, and house 100 amp unit h. if you are confused so I'm I | BRET | BRET | | ES | P | 5259865 |
EL PASO ELECTRIC, LLC. | ER | P | 07/25/2016 | exterior walls and ufer continuity test ufer ok. | BRET | BRET | | ER | P | 5253129 |
EL PASO ELECTRIC, LLC. | EUG | P | 05/11/2016 | 1" pvc to pole lights on north side of building only ok | CRAIG | CRAIG | | EUG | P | 5196722 |
EL PASO ELECTRIC, LLC. | EUG | P | 04/07/2016 | service and feeder conduits only ok to backfill. | BRET | BRET | | EUG | P | 5172188 |
EL PASO ELECTRIC, LLC. | EUG | R | 04/06/2016 | not ready ufer installed without inspection add ground rods to service. | BRET | BRET | | EUG | R | 5170890 |
LANDMARK PLUMBING AND HEATING, INC. | H= | C | 12/13/2016 | GAS FINAL OK. | NANCY | NANCY | | H= | C | 5367099 |
LANDMARK PLUMBING AND HEATING, INC. | H= | P | 12/09/2016 | GAS FINAL OK PENDING CONTRACTOR CALLING IN INSPECTION. | NANCY | NANCY | | H= | P | 5364724 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | C | 12/09/2016 | MECHANICAL FINAL OK. | NANCY | NANCY | | H= | C | 5364704 |
LANDMARK PLUMBING AND HEATING, INC. | HC | C | 10/21/2016 | NEW LOAD FOR WHAT WILL BE SUITE 110 IS 450,000 BTU'S. TWO NEW RTU'S WERE ADDED UNDER THE SHELL PERMIT AFTER METER WAS SET. CONTRACTOR HAS GAS LINE ALREADY LABELED WITH 110. | NANCY | NANCY | | HC | C | 5325469 |
LANDMARK PLUMBING AND HEATING, INC. | HI | C | 10/21/2016 | 10 LB TEST OK. INSTALLED AS PER SPLICE, SPLICE ADDED TWO NEW RTU'S. | NANCY | NANCY | | HI | C | 5325468 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 10/05/2016 | ELECTRICAL PORTION OF PERMIT NEEDS TO BE REOPENED OR NEW ELECTRICAL CONTRACTOR MUST BE ATTACHED TO PERMIT FOR INSPECTION OF TWO NEW RTU'S. GAS CONTRACTOR INSTALLING GAS TO NEW RTU'S MUST ATTACH TO PERMIT AND CALL FOR INSPECTION WHEN READY. LAST RUNG OF LADDER LACKS REQUIRED TOE SPACE, SEE IFGC 306.5 #3, "LADDERS SHALL HAVE A TOE SPACING NOT LESS THAN 6 INCHES DEEP". | NANCY | NANCY | | H= | P | 5311304 |
FRONTIER MECHANICAL SYSTEMS INC | H= | C | 09/02/2016 | GAS FINAL OK. | NANCY | NANCY | | H= | C | 5284814 |
FRONTIER MECHANICAL SYSTEMS INC | H= | P | 09/01/2016 | NEED ACCESS TO ROOF FOR FINAL GAS INSPECTION. | LUKE | LUKE | | H= | P | 5283982 |
FRONTIER MECHANICAL SYSTEMS INC | HC | C | 08/25/2016 | OK TO SET METERS FOR UNITS 100, 110, 120 AND 130. THANKS FOR ALL YOUR HELP. | NANCY | NANCY | | HC | C | 5277736 |
NIELSEN MECHANICAL CONTRACTORS, INC. | H= | P | 08/09/2016 | CHANGED TO PARTIAL FOR ADDING 2 NEW RTU'S - 5 ORIGINAL RTU'S ONLY ON CORE AND SHELL OK - ECONOMIZERS INSTALLED | JERRYF | JERRYF | | H= | P | 5264611 |
FRONTIER MECHANICAL SYSTEMS INC | HI | C | 07/22/2016 | FOUR 10 LB TESTS OK. INSTALLED AS PER PRINTS. NO ADDRESSES FOR INDIVIDUAL UNITS YET. NOT GOING TO RELEASE METERS FOR SHELL UNLESS YOU LET ME KNOW YOU WANT THEM RELEASED. | NANCY | NANCY | | HI | C | 5251868 |
FRONTIER MECHANICAL SYSTEMS INC | P= | C | 09/02/2016 | NOTE : CORE/ SHELL ONLY | GABE | GABE | | P= | C | 5284321 |
FRONTIER MECHANICAL SYSTEMS INC | P= | R | 09/01/2016 | NO CALL AHEAD , ALL UNITS LOCKED | GABE | GABE | | P= | R | 5283526 |
FRONTIER MECHANICAL SYSTEMS INC | PTO | P | 08/01/2016 | WATER MAIN INSTALLED ,AND ON TEST ONLY FOUND 2 HOSE BIBS , AND 1 IRRIGATION LINE | GABE | GABE | | PTO | P | 5258552 |
FRONTIER MECHANICAL SYSTEMS INC | PB | C | 03/29/2016 | GREASE AND SANITARY MAIN AND 1 LATERAL ON SANITARY , GREASE TRAP VENTS ON TEST , CORE AND SHELL ONLY | GABE | GABE | | PB | C | 5164858 |