GOLD RUSH CONSTR & BLDG CO | B= | C | 06/30/2016 | | NICK | NICK | | B= | C | 5234826 |
GOLD RUSH CONSTR & BLDG CO | BFR | C | 06/30/2016 | | NICK | NICK | | BFR | C | 5234825 |
GOLD RUSH CONSTR & BLDG CO | BFT | C | 06/30/2016 | | NICK | NICK | | BFT | C | 5234822 |
GOLD RUSH CONSTR & BLDG CO | BSP | P | 06/28/2016 | letter for beam and post comments on file only/still need other items/6-29-16 framing changes on file ok | BERTW | BERTW | | BSP | P | 5233202 |
GOLD RUSH CONSTR & BLDG CO | B= | R | 05/31/2016 | Need all framing items completed per Bert W on 9/3/16 / Max rise is 7" for steps at lowest level of deck /. Additional Inspections Required (computer generated): External Agency Inspection Z= by ZONING is not Completed yet (Contact: 719-385-5982). | NICK | NICK | | B= | R | 5210926 |
HIGH COUNTRY HEATING & COOLING | BSP | T | 05/03/2016 | PAID (REC#1327420) PLAN SPLICE FEE: $50 by: DALEH for Mechanical: changed furnaces out | DALEH | DALEH | | BSP | T | 5190942 |
GOLD RUSH CONSTR & BLDG CO | BFR | P | 03/09/2016 | need electrical and mechanical contractors attached to this permit and work inspected/ walked job with Phil/provide letter from architect for Mech closet roof rafters,2nd floor deck above breakroom framing 2-2x8's beam in lieu of 2-2x12's and added post mid span,6x6 posts @ cellar access sit on top of existing posts not on plans,letter for stair platforms as built framing-Vic supply a letter for all as built conditions with a sketch and stamp them please have on site for next inspection/support stringer floor cuts at upper landing/reviewed all handrails,extensions,heights rise and run with contractor | BERTW | BERTW | | BFR | P | 5151289 |
GOLD RUSH CONSTR & BLDG CO | BFT | P | 03/03/2016 | 1 pier ok in center of porch/need a revised plan for reconfiguring stairs not per plans | BERTW | BERTW | | BFT | P | 5147051 |
GOLD RUSH CONSTR & BLDG CO | BFR | P | 03/01/2016 | upper deck framing only inspected and ok /need letter for drop beam in lieu of flush beam | BERTW | BERTW | | BFR | P | 5145081 |
JLC ELECTRIC LLC | E= | C | 04/19/2016 | | BRET | BRET | | E= | C | 5179652 |
JLC ELECTRIC LLC | ER | C | 04/19/2016 | scope of work: 2 furnaces,2 a/c units. lights, receptacles for furnace rooms and service outlets | BRET | BRET | | ER | C | 5179650 |
JLC ELECTRIC LLC | E= | P | 04/18/2016 | see rough notes | BRET | BRET | | E= | P | 5178927 |
JLC ELECTRIC LLC | ER | P | 04/18/2016 | 2 a/c units ok will need access to both furnaces. | BRET | BRET | | ER | P | 5178925 |
HIGH COUNTRY HEATING & COOLING | H= | C | 05/03/2016 | MECHANICAL FINAL OK. | NANCY | NANCY | | H= | C | 5191144 |
HIGH COUNTRY HEATING & COOLING | H= | P | 04/29/2016 | MECHANICAL FINAL OK PENDING REVISED/APPROVED PRINTS WITH NEW EQUIPMENT SCHEDULE. 100,000 BTU FURNACES WITH 4 TON CONDENSERS INSTALLED. | NANCY | NANCY | | H= | P | 5187571 |
HIGH COUNTRY HEATING & COOLING | H= | P | 04/21/2016 | PRINTS SHOW 120,000 BTU FURNACES WITH 5 TON CONDENSERS TO BE INSTALLED. 100,000 BTU FURNACES AND 4 TON CONDENSERS ARE INSTALLED ON SITE. SEE PAGE 19 REGARDING MANUFACTURERS DRAIN TRAP REQUIRED ON ALL FURNACES, FREEZE PROTECTION OF CONDENSATE AND OPEN TEE REQUIREMENT ON A/C CONDENSATE. THESE FURNACE ROOMS ARE NOT INSULATED, FREEZE PROTECTION REQUIRED INCLUDING CONDENSATE PUMP. NEED ACCESS TO SEE WHERE CONDENSATE TERMINATES. SEE PAGE 10 OF INSTALLATION INSTRUCTIONS REGARDING DRAIN PAN REQUIREMENTS FOR FURNACE OVER A FINISHED SPACE. PROTECT A/C COIL SECONDARY DRAIN. NO OUTSIDE AIR TO EITHER FURNACE, OUTSIDE AIR REQUIRED, SEE FURNACE SCHEDULE NOTE 1. OUTSIDE AIR MUST HAVE MOTORIZED DAMPER OR MANUAL VOLUME AND BACK DRAFT DAMPER INSTALLED. INSULATE ALL NEW DUCTS AS PER PRINTS. NOTE: DIRECT VENT FURNACES. | NANCY | NANCY | | H= | P | 5181841 |
HIGH COUNTRY HEATING & COOLING | HV | C | 04/21/2016 | FURNACE VENTS OK. | NANCY | NANCY | | HV | C | 5181818 |