GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | C | 08/11/2016 | All other required Final inspections are complete. (This is a computer generated result) | JEREMYA | JEREMYA | | B= | C | 5266647 |
GREEN ELECTRIC INC | BSP | T | 06/21/2016 | PAID (REC#1337014): PLAN SPLICE FEE: $50 by: BERTHA for Electrical: Metered loads added. See E3.02 | BERTHA | BERTHA | | BSP | T | 5227523 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | B= | P | 06/02/2016 | Building final complete pending other final inspections. Additional Inspections Required (computer generated): COLORADO SHEET METAL CO., INC. Mechanical Final Inspection is not Completed yet, GREEN ELECTRIC INC Electrical Final Inspection is not Completed yet. | JEREMYA | JEREMYA | | B= | P | 5213525 |
COLORADO SHEET METAL CO., INC. | BSP | T | 06/01/2016 | PAID (REC#1332653) PLAN SPLICE FEE: $50 by: JUSTINC for Mechanical: revised location of EF-12 and associated duct | JUSTINC | JUSTINC | | BSP | T | 5211972 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 05/23/2016 | smoke partition on grid line CC between grid line 4 and 9 OK above ceiling pending other roughs | DANE | DANE | | BFR | P | 5206285 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 04/20/2016 | Soffit framing OK | JEREMYA | JEREMYA | | BFR | P | 5180721 |
GE JOHNSON CONSTRUCTION COMPANY, INC. | BFR | P | 03/24/2016 | Wall framing OK / Need to see all soffit framing / Pending other roughs | JEREMYA | JEREMYA | | BFR | P | 5161908 |
GREEN ELECTRIC INC | E= | C | 07/12/2016 | load justification spliced and verified by plan check | MATTHEW | MATTHEW | | E= | C | 5242375 |
GREEN ELECTRIC INC | E= | P | 06/16/2016 | pending final----- need 30 day meter results spliced to plans: ok to complete from office | MATTHEW | MATTHEW | | E= | P | 5223904 |
GREEN ELECTRIC INC | E= | P | 05/31/2016 | 2- fixtures missing in ER, need splice/revision before final, see Shelby's notes on electrical print, notes 4 and 5 on e-301, need to call in fire alarm final | GARYL | GARYL | | E= | P | 5211257 |
GREEN ELECTRIC INC | ER | P | 05/26/2016 | control room ceiling ok | MATTHEW | MATTHEW | | ER | P | 5209304 |
GREEN ELECTRIC INC | ER | P | 05/23/2016 | ceiling marked on plans ok | MATTHEW | MATTHEW | | ER | P | 5205776 |
GREEN ELECTRIC INC | ER | C | 05/23/2016 | FIRE ALARM INSPECTION: fire alarm rough ok---------- no red card | MATTHEW | MATTHEW | | ER | C | 5205773 |
GREEN ELECTRIC INC | E= | C | 05/23/2016 | FIRE ALARM INSPECTION: fire alarm rough ok---------- no red card | MATTHEW | MATTHEW | | E= | C | 5205774 |
GREEN ELECTRIC INC | ER | P | 03/29/2016 | walls marked on plans | MATTHEW | MATTHEW | | ER | P | 5164774 |
GREEN ELECTRIC INC | ER | P | 03/23/2016 | rooms 2322 / 2323 / 2324 walls only excluding self enclosed breaker not install at this time these walls will be open | CRAIG | CRAIG | | ER | P | 5160885 |
COLORADO SHEET METAL CO., INC. | H= | C | 08/11/2016 | MECHANICAL FINAL OK. TEST AND BALANCE REPORT RECEIVED. | NANCY | NANCY | | H= | C | 5266646 |
OLSON PLUMBING & HEATING COMPANY | H= | C | 06/01/2016 | PIPING FINAL OK. | NANCY | NANCY | | H= | C | 5212126 |
COLORADO SHEET METAL CO., INC. | H= | P | 05/16/2016 | PROVIDE TEST AND BALANCE REPORT. NEED REVISED/APPROVED PRINTS OR ENGINEER APPROVAL FOR NEW LOCATION OF EF2-12. REST OK. | NANCY | NANCY | | H= | P | 5200547 |
OLSON PLUMBING & HEATING COMPANY | HWP | C | 04/05/2016 | ALL PIPING UNDER WORKING PRESSURE. NO VISIBLE LEAKS. OK TO INSULATE AND LABEL. | NANCY | NANCY | | HWP | C | 5170394 |
COLORADO SHEET METAL CO., INC. | HD | P | 03/25/2016 | NEED HOT WATER PIPING CONTRACTOR TO ATTACH TO PERMIT AND CALL FOR INSPECTION. NEED REVISED/APPROVED PRINTS SHOWING NEW LOCATION OF SMOKE EXHAUST FAN AND DUCT. ROOM 8, ROOM 9 AND CONTROL ROOM: SUPPLY, RETURN AND SMOKE EXHAUST ABOVE CEILINGS OK. OK TO WRAP. FOUR RETURN DROPS IN WALLS OK, OK TO COVER. NO DIFFUSERS YET. | NANCY | NANCY | | HD | P | 5163041 |